BNG report
Records survey evidence, the baseline, calculations and the proposed design response.
Useful check: do the report and metric use the same layout?Biodiversity net gain · Questions answered
Clear answers. Useful evidence.
A practical next step.
Find answers to biodiversity net gain questions about exemptions, surveys, planning documents, units, costs and habitat management.
These BNG FAQs bring together current English guidance and lessons from ACP assessments. Search by topic, explore a question and follow the relevant detailed guide.
Reviewed 1 November 2026 · Includes the 6 August 2026 changes
36 questions · Four topics
Search a word or phrase, or choose a topic. For example, try “self build”, “zero baseline”, “cost” or “gain plan”.
36 questions across four topics.
No matching answers. Try a shorter phrase or choose all topics. You can also ask ACP about your project.
01
Start with applicability
Check the route, dates and habitat evidence before choosing the assessment scope.
10 questions in this topic
Biodiversity net gain, or BNG, measures habitat change associated with development. For development within England’s statutory planning regime, the objective is at least 10% more biodiversity value than the relevant baseline. The statutory metric measures that habitat value. Protected-species requirements and other ecological protections also apply. Read the legal framework.
Link to this answerCheck the application route, date, development type and exemption conditions. Most relevant applications entered the mandatory system from 12 February 2024; non-major development followed from 2 April 2024. Later changes and transitional rules matter. For a new application, use the dated exemption decision guide before commissioning a full calculation.
Link to this answerFor qualifying applications made on or after 6 August 2026, the site-area exemption requires a site no larger than 0.2 hectares and no impact on on-site priority habitat. Measure the full development site within its red line. This includes access and associated works within that boundary.
For a section 73 variation, the new exemption is unavailable if either the original application or the original permission predates 6 August 2026. Other saved exemptions may still apply. Check the threshold and evidence.
Link to this answerFor new applications made on or after 6 August 2026, assess self-build and custom-build proposals against the current exemption routes. The separate self-build exemption ended on that date. Qualifying earlier applications and some subsequent section 73 permissions retain protection under saving provisions. Therefore, start with the application history, site area and habitat evidence.
Link to this answerHouseholder applications have a specific exemption. For applications made on or after 6 August 2026, the temporary-development exemption requires the whole development to be temporary. It must also avoid impacts on on-site priority habitat.
The permission must require removal of authorised buildings or works, discontinuance of the use and completion of reinstatement within five years. Count the combined specified periods under earlier permissions for the same temporary development. Mixed permanent and temporary proposals and section 73 variations need their own scope and date checks.
Link to this answerBoth impact limits apply, together with the priority-habitat condition. The development must avoid impacting on-site priority habitat and affect less than 25 square metres of relevant area habitat and less than five metres of relevant linear habitat. Exactly 25 square metres or five metres falls outside the respective limit. Include relevant temporary works when identifying impacts. See the de minimis examples.
Link to this answerAn exempt project may still need ecological evidence. Protected-species duties, designated-site protections and planning policies continue to apply. For example, works to a roof or tree may need a bat survey. An exemption statement explains the BNG position; the wider ecological scope follows the site and proposed works. Check the bat-survey considerations.
Link to this answerAssess previously developed land against the current exemption criteria and its actual habitats. Brownfield sites can contain valuable scrub, ponds or habitat mosaics. Therefore, establish the habitat and impact evidence early. Where degradation has occurred, the rules may require an earlier biodiversity baseline. Plan the baseline survey.
Link to this answerThese answers focus on England’s Town and Country Planning Act regime. Scotland, Wales and Northern Ireland have their own planning frameworks.
The separate NSIP regime applies to development consent order applications made on or after 2 November 2026 in England. It uses the relevant biodiversity gain statement, an outline gain plan at application and subsequent detailed arrangements. Establish the consent route first, then follow the official NSIP guidance.
Link to this answerYes. Where the evidence supports an exemption, ACP can prepare a proportionate statement explaining the route, relevant dates and supporting site information. Depending on the exemption, this may include boundary measurements, habitat evidence and an impact calculation. Share the current plan and council request first so we can scope the work appropriately.
Link to this answer02
Understand the evidence
Choose the appropriate method, record the habitat inputs and interpret each unit type.
9 questions in this topic
A biodiversity unit represents relative habitat value in the metric. Habitat extent, distinctiveness, condition and strategic significance inform the relevant calculations. Creation and enhancement also involve applicable risk adjustments. Consequently, the number of units associated with a tree, field or habitat proposal depends on its assessed characteristics. Explore the unit calculation examples.
Link to this answerThe calculation uses the relevant pre-development value within the development boundary. For example, an eight-unit baseline needs at least 8.8 units for a 10% objective. Then check the relevant module, trading rules and delivery arrangements. Retained habitats and proposed changes need consistent treatment across the plans and workbook.
Link to this answerKeep the three unit types separate and check each relevant result. A habitat-unit surplus cannot compensate for a hedgerow or watercourse deficit. Trading rules also control compensation within each module. For example, one anonymised ACP assessment showed positive habitat change alongside a hedgerow shortfall. Reading both results identified the remaining delivery requirement.
Link to this answerOnly if both the development and habitats meet its eligibility criteria and the user is competent to undertake the assessment. Small size alone does not establish eligibility. The tool includes particular watercourse options, but restrictions apply. Use the current official guide and our Small Sites Metric assessment guide to select the appropriate method.
Link to this answerUse the statutory biodiversity metric for the statutory regime. Biodiversity Metric 4.0 is an earlier, distinct tool. Obtain the workbook from the government publisher and record its version. Current government guidance allows previously published versions of the statutory tools; updates do not change unit outputs.
For a continuing project, keep the calculation and report revisions aligned. Our workbook user guide explains the inputs and worked checks. The metric guide explains the technical basis and current downloads.
Link to this answerMaps help measure and organise habitat parcels. The assessment also needs reliable evidence for habitat identification, condition and relevant site history. Therefore, agree the survey scope and timing before treating the calculation as final. Record access or seasonal limitations and explain how they will be resolved.
Link to this answerIdentify the feature before choosing the method. Artificial ditches use the relevant ditch condition criteria; rivers and streams normally require the metric’s River Condition Assessment approach. A modified natural stream can still need river assessment.
Commission a suitably trained assessor with the required method competence. Where proposals alter levels, flow, banks or crossings, coordinate ecological findings with hydrology, drainage or river-engineering advice. Confirm any separate consents. Start with our ditch assessment guide or river condition assessment guide.
Link to this answerDescribe the absolute new units and apply the relevant metric rules. A percentage increase from zero has no meaningful denominator. In an anonymised ACP estate assessment, the report recorded new hedgerow units alongside the separate habitat percentage. Therefore, ask for both the numerical result and its interpretation when reviewing a workbook.
Link to this answerCondition can materially affect the calculated habitat value. Use the correct assessment criteria, suitable survey timing and clear supporting observations. A 2026 peer-reviewed study found that assessment variability could influence apparent uplift. Its practical implication is to document condition judgements carefully and check uncertain inputs. Read the habitat-condition research.
Link to this answer03
Coordinate the submission
Keep the survey, plans and calculations aligned as the project moves through planning.
7 questions in this topic
Where the biodiversity gain condition applies, submit the plan after permission and obtain its approval before starting development. The formal submission can be made no earlier than the day after permission is granted. Meanwhile, provide the required biodiversity information with the planning application. See what the Biodiversity Gain Plan covers.
Link to this answerFor an in-scope application, coordinate the baseline metric, habitat plan, relevant dates and required statements, including degradation and irreplaceable-habitat information where applicable. Also check the council’s local validation list. For an exemption, identify the route and provide evidence proportionate to its tests. Cross-reference the supporting plans so the council can follow the reasoning.
Link to this answerEach document has a distinct job. The assessment report explains the survey, calculation and design response. The Biodiversity Gain Plan brings together evidence for the statutory objective. An HMMP describes habitat establishment, management and monitoring.
An ecologist or competent professional should prepare the HMMP, with appropriate habitat specialisms for watercourses. Coordinate specialist input where soil, water levels, drainage or engineering determine habitat feasibility. Record responsibilities, condition targets and remedial actions. Then use consistent boundaries, parcel references and revisions throughout. Choose the appropriate document resources.
Link to this answerYes. Official resources include an overall Biodiversity Gain Plan and a phase Biodiversity Gain Plan. The permission and phasing arrangements determine the submissions and timing. Coordinate the overall strategy with the detailed evidence for each phase. Find the official overall and phase templates.
Link to this answerThe statutory objective is at least 10%. A justified local planning policy may set a higher expectation. Check the adopted development plan, relevant supporting guidance and the proposal’s circumstances. Distinguish the legal minimum from a local policy requirement, and record the target used in the assessment.
Link to this answerReview the habitat plans, metric, gain plan and management commitments together. A small drawing change can affect a retained tree, hedge length or habitat area. Section 73 and phased permissions have particular rules, so check the permission history. Arrange a coordinated assessment review before relying on superseded figures.
Link to this answerThe programme depends on habitat survey timing, access, design readiness and the number of revisions. Ask for survey and reporting milestones when commissioning the work. Separately, the usual Biodiversity Gain Plan determination period is eight weeks, unless another period is agreed. Allow time for legal arrangements, off-site evidence and responses to council questions where relevant.
Link to this answer04
Plan for the whole project
Connect the design and budget with habitat establishment, legal arrangements and ongoing care.
10 questions in this topic
Start with an accurate baseline and a feasible design. Identify the habitats to retain, enhance or create, then address remaining requirements through the applicable delivery route. Check the separate unit outputs and trading rules. Finally, coordinate the approved documents, legal arrangements, practical works and management responsibilities. Early design review helps the team resolve these matters together.
Link to this answerThe applicable hierarchy depends on development type and application history. For relevant non-major applications from 6 August 2026, on-site enhancement or creation and registered off-site gains have equal preference. Avoidance and mitigation still matter; credits remain last resort. Major development and saved earlier cases follow different rules. Check the dated hierarchy explanation.
Link to this answerPrivate off-site units represent registered habitat gains allocated to a development. Government statutory credits provide a separate, last-resort route with their own evidence, pricing and purchase arrangements. Therefore, establish the relevant shortfall and required habitat types before choosing provision. Compare units and credits.
Link to this answerUse the development’s red-line boundary to distinguish on-site from off-site land. Land outside it remains off-site even within the same ownership. Where its gains contribute to the scheme, check the applicable legal security, registration and allocation requirements. For example, an ACP estate assessment separated the application site from its wider landscape context before calculating the results.
Link to this answerFor Town and Country Planning Act development, significant on-site habitat enhancements require at least 30 years of secured maintenance after development completion. Registered off-site gains run for at least 30 years from completion of the habitat enhancement works, as defined in the legal agreement.
NSIP on-site gains have their own starting point: completion of the relevant habitat creation or enhancement works. Therefore, record the route, start trigger, land, responsible parties and duration explicitly. Then translate those commitments into funded management tasks. Read the HMMP guide.
Link to this answerSeparate survey and assessment fees from the cost of delivering the gain. Design revisions, reporting, legal arrangements, registration, off-site units and long-term management can all affect the budget. Habitat type and project constraints matter more than a single national price. Compare the main BNG cost components and check the scope behind each quotation.
Link to this answerPlanting records demonstrate installation. Subsequent monitoring checks progress towards the target habitat extent and condition. Therefore, keep establishment records and compare monitoring findings with the approved objectives and timetable. Where performance falls short, agree the appropriate remedial management. Our project examples explain how evidence develops through the process.
Link to this answerFollow the approved plans, conditions and legal agreements. Monitoring should compare habitat progress with measurable targets and trigger the agreed remedial action. For example, investigate poor establishment, adjust management where appropriate and record the follow-up check.
On a sale or transfer, review continuing obligations, access, funding and responsibility with ecological and legal advisers. Hand over the current HMMP, monitoring history and outstanding actions. This gives the new owner or manager a clear account of the work and evidence required.
Link to this answerAsk which surveys, site visits, metric iterations, plans and reports the fee covers. Also identify any allowance for design meetings and council responses. Then separate assessment fees from habitat works, legal costs, off-site provision and long-term management. A clear scope makes quotations easier to compare and helps avoid gaps between project stages.
Link to this answerConfirm the unit type, habitat category, trading-rule requirements and applicable spatial risk. Then check the provider’s available units, legal security and registration and allocation process. The quantity offered should match the calculation’s requirements. Coordinate those records with the gain plan and programme, especially where the design or shortfall may still change.
Link to this answerKeep the documents connected
Use the same boundary, parcel references and drawing revisions throughout. Each document then carries the assessment forward into the next decision.
Records survey evidence, the baseline, calculations and the proposed design response.
Useful check: do the report and metric use the same layout?Brings together the final gain strategy and evidence needed for the gain-condition decision.
Useful check: are the required allocation and securing records included?Sets out establishment, ongoing tasks, monitoring and action if habitat progress falls short.
Useful check: who does each task, and when?Lessons from real assessments
Three recurring checks emerge from the original ACP reports reviewed for these answers: coordinate the plans, read each unit type separately and explain the result in context.
For example, one assessment recorded gains in both habitat and hedgerow modules. Another identified a hedgerow shortfall alongside a positive habitat change. Those results led to different delivery questions.
A third report recorded new hedgerow units from a zero baseline. It illustrates why an absolute unit result can be more informative than a percentage.
Explore the anonymised ACP case studies for the assessment decisions behind these lessons.
Start with the site boundary, current proposal, application history and any council comments. These help establish the right scope.
Use the exemption decision guide for applicability, the document resource guide for submissions, or the unit calculation guide for the arithmetic.
Discuss your BNG requirements
Tell us about your site and the BNG question you need to resolve.
Share the location, proposed works and current planning stage.
Tell us what you need to clarify, including any council request or deadline.
Start with the information you have. If a review is appropriate, we can discuss how to share supporting documents securely.
Prepared by ACP Consultants. Guidance and the project evidence register reviewed 1 November 2026 for England. The 2026 amending regulations and current government guidance inform the dated exemption and hierarchy answers.