Biodiversity
Will the proposal deliver the required habitat gain?
- Evidence
- Baseline survey, habitat areas, condition and statutory metric.
- Output
- Biodiversity units and deliverable habitat targets.
Climate & biodiversity · Design for the years ahead
Choose habitats that fit the site. Plan for a changing climate. Support every environmental claim with the right evidence.
Biodiversity net gain can support climate adaptation and carbon storage. However, those benefits depend on habitat choice, location and long-term management.
This guide helps project teams in England connect ecological targets with climate risks, practical design decisions and clear reporting.
Guidance and sources checked 1 November 2026 · England planning focus
BNG measures habitat value. Climate adaptation addresses vulnerability. Meanwhile, carbon accounting measures greenhouse-gas effects. A project may improve all three, but each needs its own evidence.
For example, a wetland might create valuable habitat and temporarily hold runoff. Its flood performance still depends on its levels, capacity and catchment. Similarly, its carbon balance needs a separate assessment. A biodiversity-unit calculation cannot prove either result.
Will the proposal deliver the required habitat gain?
Will the habitat cope with changing conditions?
What greenhouse-gas benefit can be supported?
New to the wider process? Start with our biodiversity net gain guide. This page focuses on the decisions that connect habitat delivery with climate objectives.
For the applicable planning rules and long-term securing requirements, use our BNG legislation and guidance.
For development subject to England’s mandatory BNG regime, the minimum objective is generally a 10% gain in biodiversity value. The Statutory Biodiversity Metric uses habitat characteristics and delivery factors to calculate units. However, exemptions, trading rules and the applicable planning route still matter.
A 10% biodiversity-unit gain is not a 10% increase in every species, ecosystem service or carbon store. Nor does it establish that a development is carbon neutral. Keep the ecological calculation alongside the relevant carbon, drainage and climate assessments.
| Question | Suitable evidence | Companion assessment to coordinate |
|---|---|---|
| How much habitat value changes? | Statutory metric and supporting ecological assessment. | Carbon accounting and flood or drainage performance. |
| How much carbon is stored or removed? | Defined carbon inventory or project accounting method, with uncertainty and a time boundary. | BNG evidence and carbon-scheme eligibility. |
| How does the design manage climate risk? | Exposure and vulnerability review, supported by relevant ecological, engineering and climate evidence. | Site-specific climate risk appraisal, resilient design and adaptive management. |
Begin with a sound BNG assessment and habitat baseline. Apply the relevant mitigation and biodiversity gain hierarchy; an attractive carbon proposal does not remove ecological safeguards.
Climate change affects biodiversity through changing temperatures, water availability, seasonal timing and extreme events. In addition, these pressures interact with habitat fragmentation, pollution, pests and existing management problems. A habitat may remain present while its condition or species composition deteriorates.
The Met Office’s UKCP18 remains the recommended national climate dataset. Its broad direction includes warmer, wetter winters and hotter, drier summers. However, averages do not describe every year or site. For example, intense summer rainfall and unusually wet or cool periods remain possible.
Record the projection dataset, baseline period, scenario, future period and location used. Then relate these to the habitat’s establishment period and expected lifespan. Do not apply a national percentage change as a precise forecast for a particular field.
Check rooting depth, soil compaction, exposure and water availability. Consequently, establishment failures may require different ground preparation, timing or aftercare. A drought-tolerant planting list alone does not resolve a poor soil or water regime.
Check flood duration, flow paths, erosion and sediment inputs. A plant community suited to occasional inundation may struggle with prolonged waterlogging. Therefore, coordinate proposed habitat levels with the drainage design.
Consider salinity, erosion, sea-level rise and room for habitat movement. A fixed boundary or defence can restrict future migration. As a result, specialist coastal assessment may be needed before promising long-term habitat delivery.
Review sequences of events, such as drought followed by intense rainfall. Also consider pests, disease and wildfire where relevant. Finally, identify how access, staff and replacement funding would function after an extreme event.
CIEEM’s March 2026 resilience guidance provides a proportionate process for integrating climate information, habitat risks, resilience measures and wider benefits. Use an initial review to identify where more detailed specialist assessment is justified.
The CIEEM process supports both an initial appraisal and a detailed assessment. Choose the level that matches the proposal’s scale, complexity and design stage.
First, bring together observed conditions and future projections. Record the scenario and time horizon.
Next, consider exposure, habitat sensitivity and sequences of extreme events. Identify the early growth stages most at risk.
Then coordinate habitat design, aftercare and long-term management. Assign each measure to a responsible person.
Finally, assess how the design could support people and the surrounding landscape. Retain evidence for each claimed benefit.
For a first review, the Met Office’s Local Authority Climate Service offers accessible climate information. Where decisions depend on detailed water, temperature or coastal behaviour, agree the additional evidence with the relevant specialist.
Start with existing ecological value, soil, hydrology and landscape connections. Protect established carbon stores and valuable habitats before considering new planting or earthworks. Then test whether the proposed habitat can reach its target condition without unrealistic management inputs.
| Habitat option | Potential contribution | Decision to resolve |
|---|---|---|
| Woodland and hedgerows | Carbon uptake, shelter and connected habitat; shade where appropriately located. | Check existing open-habitat value, soil carbon, water availability and establishment risks. Tree cover is not appropriate everywhere. |
| Species-rich grassland | Open-habitat diversity, habitat links and protection of existing soil carbon. | Check nutrient status, seed sources and workable cutting or grazing. Do not assume restoration creates a fixed annual carbon removal. |
| Ponds, wetlands and floodplain habitats | Habitat diversity, water storage and, in suitable settings, improved water quality. | Check water supply, nutrient loading, flood levels and downstream effects. Carbon assessment must consider relevant greenhouse gases and management. |
| Peatland restoration | Protection of important carbon stores and recovery of specialist habitats. | Confirm peat condition and hydrological feasibility. Existing obligations and irreplaceable-habitat rules need separate consideration. |
| Urban green infrastructure | Shade, habitat stepping stones and surface-water management. | Allow sufficient soil volume, safe drainage, maintenance access and realistic establishment space. Check that the intended habitat qualifies in the metric. |
| Saltmarsh and coastal habitats | Coastal habitat, sediment carbon storage and wave attenuation in appropriate locations. | Assess sediment supply, tidal conditions, future migration space and consent requirements. Avoid transferring generic carbon rates to an unassessed site. |
Forest Research identifies important trade-offs: woodland establishment can disturb carbon-rich soils, while planting on species-rich grassland can remove valuable biodiversity. Therefore, compare tree planting with the ecological and carbon value of retaining or restoring the existing habitat.
The Environment Agency’s 2025 evidence synthesis also found that nature-based solutions depend on catchment context and continuing management. Moreover, benefits can change over time, and some measures create trade-offs. Therefore, verify the proposed function rather than relying on the habitat label.
The 2026 National Planning Policy Framework addresses climate mitigation and adaptation through policies CC1–3. These cover matters including carbon stores, green infrastructure, sustainable drainage and vulnerability over a scheme’s lifetime. These policies also operate alongside the BNG requirements.
Check the adopted development plan, relevant supplementary guidance, validation requirements and any conditions or agreements. Where an Environmental Impact Assessment is required, coordinate assumptions and mitigation across the ecological and climate chapters. Our BNG and EIA guide explains that interface.
An LNRS helps identify local biodiversity priorities and suitable places for action. Read the mapped measure and supporting description, then confirm the site conditions. Next, test habitat suitability, confirm the consent route and apply the relevant metric rules to the mapped opportunity.
For example, Oxfordshire’s published priorities connect habitat recovery with climate resilience and recognise that measures may need adaptation as climate knowledge develops. The council also requires site checks and relevant permissions before work begins.
Record the specific measure, map version and ecological reasoning in your appraisal. Then apply strategic significance using the current statutory metric guidance. Keep the carbon or flood benefit assessment separate from that biodiversity judgement.
Carbon stock is the amount held in vegetation, soil or sediment at a given time. Sequestration is carbon uptake over time. Avoided emissions concern a reduction relative to a defined baseline. These are different quantities and should not be added indiscriminately.
A carbon assessment should define its boundary, baseline, method and reporting period. It should consider relevant establishment and management emissions, changes in existing stores, uncertainty and the risk of reversal. Finally, state whether a figure is modelled, measured or independently verified.
BNG units do not themselves constitute carbon credits. A separate carbon scheme has its own eligibility, additionality, accounting, verification and claims rules. Therefore, a habitat’s ecological value does not establish its eligibility under that scheme.
The Woodland Carbon Code’s version 3.0 requires legal and financial additionality. For example, woodland creation already required by a planning decision or other binding agreement can fail the legal test. Its current development guidance describes separate credit stacking mechanisms as work in progress, rather than a general entitlement.
Defra’s published guidance on combining payments expressly covers an initial phase ending in March 2025. It discusses further biodiversity enhancement on land used for carbon credits. Treat that dated guidance as context, and confirm current scheme rules and the proposed arrangement before promising two income streams.
Keep a development’s emissions reduction programme in place. Do not deduct a biodiversity-unit uplift from its carbon footprint or automatically treat purchased BNG units as a Scope 3 reduction.
Research reinforces the need to assess trade-offs. A 2026 Nature Climate Change study by Prütz and colleagues examined five global models and identified potential overlap between land-intensive carbon removal and areas important for biodiversity. This is global scenario evidence, not a prediction for an individual English BNG site.
Build a focused checklist for your next design meeting. Choose the habitat, site context and issues to investigate. The planner identifies evidence gaps, suggested specialist input and management questions.
Scope: an early discussion aid for defining evidence, specialist input and next actions. Your selections stay in this browser page.
Confirm the checklist against site surveys, current guidance and the approved design, including any relevant pressures beyond your selections.
This illustrative options appraisal shows how ecological, drainage and climate evidence can inform a shared design decision.
A design team proposes a permanent wetland in a low-lying parcel. Initially, the preliminary metric suggests a biodiversity benefit. However, the team has not confirmed summer water availability or the effect of sediment-rich runoff.
Choose the option supported by ecological and hydrological evidence. Document the target habitat, acceptable water regime and maintenance responsibilities. Report any carbon benefit only after separate assessment; do not infer it from the wetland’s biodiversity units.
A useful appraisal connects each uncertainty to a design choice, an owner and a review point. The entries below show that reasoning; project teams set the actual thresholds from site evidence.
| Question and evidence | Design response to test | Decision owner and checkpoint |
|---|---|---|
Summer water supplyCompare seasonal water levels, inflows, losses and soil permeability with the intended plant community. | Test permanent water against a seasonal mosaic. Check the reliability, consent and cost of any supplementary supply. | Ecologist with hydrology input; resolve before fixing the target habitat and metric scenario. |
Storm runoff and sedimentIdentify contributing surfaces, likely pollutants, sediment pathways and maintenance demand. | Assess upstream treatment, a maintainable sediment feature and suitable inlet arrangements. Coordinate water quality with habitat objectives. | Drainage designer and ecologist; agree before drainage and habitat drawings are issued together. |
Levels and flood pathwaysReview the terrain survey, proposed levels, overflow route and effects on neighbouring land. | Test revised levels, storage and safe exceedance routes while retaining suitable wet and dry habitat zones. | Drainage or flood-risk specialist; verify the hydraulic design and relevant permissions. |
Condition and managementDefine the target plants, seasonal water regime, access and inspection records. | Specify establishment care, invasive-species response, sediment removal access and funded review actions. | Ecologist and future manager; complete the parcel prescription before implementation. |
If the seasonal mosaic is selected, update the W01 habitat plan, metric inputs, condition target, drainage drawing and HMMP together. Check the unit result and trading rules again. Record the accepted option, unresolved dependencies and approval date.
The skills needed depend on the design question. Start with the ecologist’s habitat requirements, then commission the input needed to resolve specific questions.
A hydrologist can assess water sources and seasonal balance. Where needed, a hydrogeologist can assess groundwater that controls the habitat. Drainage or flood-risk engineers address storage, structures, flows and safe exceedance routes.
Bring in forestry, arboricultural, soil or landscape expertise where species choice, rooting conditions, tree safety or construction constraints control successful establishment.
Use appropriately qualified assessors for the applicable river-condition method. Seek fluvial or coastal expertise where channel processes, erosion, sediment or tidal change affect the design.
Use specialists familiar with the selected dataset, accounting method and verification scheme. Share the same plan revision and assumptions across disciplines.
Agree the deliverables at appointment: methods, survey timing, design assumptions, review responsibilities and any consent dependencies. As a result, the team can use the advice in the final habitat specification.
Put the agreed measures into the Habitat Management and Monitoring Plan. Then specify responsibilities, resources, monitoring methods and response triggers. Significant on-site gains and registered off-site gains have long-term securing requirements; confirm the applicable duration and start point for the scheme.
| Observation | Management question | Evidence to retain |
|---|---|---|
| Repeated establishment failures | Is the cause drought, unsuitable soil, grazing pressure, disease or a combination? | Mapped failures, site conditions, inspection dates and the agreed corrective action. |
| A changed water regime | Does the duration or season of inundation conflict with the target habitat? | Water observations, weather context, drainage changes and specialist advice. |
| Target condition is slipping | Will management changes recover the trajectory, or does the approved design need formal review? | Condition assessments, trend comparisons and a decision with a named owner. |
Set project-specific thresholds; there is no universal mortality or water-level trigger that suits every habitat. Inspect after significant events where appropriate, alongside scheduled surveys. Before changing habitat targets or secured commitments, agree the required approval route.
Use our BNG monitoring framework to organise survey evidence, reporting and corrective action. Keep separate indicators for biodiversity, water performance and any carbon commitment.
For W01, the team could define a review trigger around water levels outside the agreed seasonal envelope. The HMMP should state the measurement location, frequency, duration and weather context that activate that review.
Also review the longer design horizon when new projections or repeated events challenge the original assumptions. Keep the statutory maintenance commitment, the habitat’s establishment period and the development’s design life explicit in the record.
Clear answers on carbon claims, habitat choices, SuDS and planning for a changing climate.
No. BNG measures habitat value, while carbon accounting measures greenhouse-gas effects. BNG delivery does not automatically create a carbon credit or permit an offset claim. Assess emissions reductions and any eligible carbon claims separately.
There is no universal answer. Existing carbon stores, soil, water, management and timescale all matter. A habitat with strong potential in one setting can perform poorly elsewhere. Protect valuable existing habitats and compare site-specific options before selecting a target.
Changing water availability, heat and extreme events can affect establishment and target condition. Consider the relevant future period, then document resilience measures and management responses. Review longer horizons where the habitat or development lifespan justifies them.
Potentially. A drainage feature can provide suitable habitat and manage runoff, but both functions require evidence. The ecological design must fit water levels, water quality and maintenance needs. Confirm the habitat classification and metric treatment alongside the drainage assessment.
Do not assume they can. Check each scheme’s current additionality, eligibility and claims rules, plus existing agreements and funding. The same site may have different activities or further enhancements, but that does not establish permission to sell the same outcome twice.
BNG focuses on biodiversity value. Environmental net gain is a broader concept that can include water, air, soil, carbon and other benefits. Achieving the BNG objective does not, by itself, demonstrate improvement across every environmental outcome.
No single assessment level suits every project. Begin with a proportionate review of local climate information and habitat vulnerability. Complex hydrology, exposed coastal sites, major infrastructure or strong quantified claims may justify more detailed specialist work.
Plan resilient habitats
Connect your habitat targets with the site’s changing climate. We can review options and build practical resilience measures into your BNG strategy.
Share the location, ecological baseline and proposed layout, including the habitats you want to create or enhance.
Tell us about water, soil or establishment concerns and any drainage or climate assessment already available.
We can scope the ecological review and identify where further specialist input would help resolve the design.
For other enquiries, visit our contact page.