Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Woking BNG advice

Biodiversity Net Gain in Woking

Plan your Woking development around local habitats, planning requirements and practical biodiversity gains.

ACP Consultants can help with habitat surveys, biodiversity metric calculations and a practical BNG delivery plan for your Woking site.

Local requirements

Woking BNG requirements at a glance

Woking BNG requirements at a glance
CheckPractical answer
Planning authorityWoking Borough Council — verify the actual parcel, any special planning jurisdiction and site type
Adopted development planWoking Core Strategy adopted 25 October 2012, Development Management Policies adopted 20 October 2016, Site Allocations Plan adopted 14 October 2021
Specific biodiversity policiesCS7 – Biodiversity and Nature Conservation
Emerging plan statusThe 2012 Core Strategy was reviewed in 2023 and remains part of the current Development Plan. Do not treat a review as the adoption of a replacement. Check the council's current local plan preparation notices for later changes.
LNRSSurrey Local Nature Recovery Strategy, Published 31 March 2026; Surrey County Council
Statutory BNGNormally at least 10% for eligible applications; exemption and application date checks are essential
Protected sitesIndependent Habitats Regulations or protected-species evidence where a credible impact pathway exists

Planning authority and policy

Local planning requirements for Woking

Confirm the planning authority

Woking Borough Council handles most applications within Woking borough. Surrey County Council handles county matters such as minerals and waste. Guildford and Surrey Heath have separate planning routes.

See BNG in Surrey and the South East regional guide.

Use the adopted development plan

Use the Core Strategy adopted in 2012, Development Management Policies from 2016 and Site Allocations Plan from 2021. Policy CS7 addresses biodiversity, designated sites, habitats and ecological connections.

The Core Strategy review in 2023 did not replace the adopted plan. Check the relevant allocation and neighbourhood policies while the council prepares its new development plan.

Establish the gain target

Eligible development normally needs at least 10% statutory gain. Establish the applicable target using current national policy, any relevant site-allocation policy and existing permission.

Plan habitat retention, suitable enhancement and long-term management alongside the site layout. Check the national biodiversity planning policies when establishing obligations.

Check dates and exemptions

For applications from 6 August 2026, sites up to 0.2 hectares may qualify for an exemption if no onsite priority habitat is adversely affected.

Householder, de minimis, temporary-development and transitional rules have their own conditions. Record the application date, site area and supporting habitat evidence.

Use the BNG exemptions guide to identify the relevant route.

Nature recovery and local geography

Local habitats and nature recovery in Woking

Use the local nature recovery map

The published Surrey Local Nature Recovery Strategy provides priorities and mapped opportunities for habitat recovery. It was published in March 2026.

For Woking, consider Basingstoke Canal and Hoe Stream corridors, Thames Basin heathland, town-centre sites and woodland links. Match the actual site location and proposed habitat to a relevant recovery measure.

Local habitats to consider in Woking

Use the landscape context to scope the survey, then record the habitats actually present within the site boundary.

Woking habitats and evidence
Local settingPotential habitat or evidence issue
Basingstoke Canal and Hoe Stream corridorsRiparian vegetation, wetland edges, water and adjoining green networks; watercourse changes need separate evidence.
Thames Basin heathlandHeathland-associated birds and sensitive European habitat; residential projects may need SANG/SAMM rather than relying on BNG alone.
Woking town-centre brownfieldEven hardstanding sites can include hedgerow, planted boundaries and trees; opportunities include species-rich green roofs and rain gardens.
Woodland and local green linksAncient woodland and tree networks where present, including edges of built-up settlements; surveys must be site-specific.

Plan protected-site and species evidence

The Thames Basin Heaths SPA and Thursley, Ash, Pirbright and Chobham SAC can affect Woking proposals. New residential accommodation in a relevant zone may need SANG and SAMM arrangements.

Use Woking’s avoidance guidance and the actual site boundary to establish the route. Along the Basingstoke Canal or Hoe Stream, scope watercourse, riparian habitat and protected-species evidence together.

Planning and delivery

Preparing evidence and delivering biodiversity gain

Prepare the habitat baseline and metric

Start with the site’s habitat baseline and condition. Use the appropriate statutory metric; the Small Sites Metric is suitable only where its eligibility conditions are met.

In Woking, survey Basingstoke Canal and Hoe Stream corridors, Thames Basin heathland, town-centre sites and woodland links where these occur within or affect the proposal. Record the actual habitat condition and relevant watercourse evidence.

See BNG assessments and habitat surveys, habitat condition assessment and Small Sites Metric assessments.

Prepare the planning submission

Confirm the planning authority, application date, relevant policies and whether statutory BNG applies. Then agree a proportionate submission scope with the council.

  • An applicability or exemption explanation supported by site evidence.
  • The red-line boundary, baseline habitat plan and metric where required.
  • Proposed layout, retained habitats and feasible habitat gains.
  • Any protected-species, watercourse, drainage or Habitats Regulations evidence.

Test the layout against local habitat constraints

Retain sensitive habitats and useful connections where possible. Use these questions to compare realistic layout and habitat options.

Woking habitat design questions
Local setting to testUseful design and survey question
Basingstoke Canal and Hoe Stream corridorsCan the proposal avoid impacts? Riparian vegetation, wetland edges, water and adjoining green networks; watercourse changes need separate evidence.
Thames Basin heathlandWhat would retaining or improving connectivity involve? Heathland-associated birds and sensitive European habitat; residential projects may need SANG/SAMM rather than relying on BNG alone.
Woking town-centre brownfieldDo the existing habitats or species interests restrict the proposed gain type? Even hardstanding sites can include hedgerow, planted boundaries and trees; opportunities include species-rich green roofs and rain gardens.
Woodland and local green linksCan the layout integrate useful green infrastructure? Ancient woodland and tree networks where present, including edges of built-up settlements; surveys must be site-specific.

Choose habitats suited to the site and its long-term management. Match nature recovery measures to the published LNRS map, then calculate all relevant unit categories.

Development and regeneration context

Woking’s 2021 Site Allocations Plan identifies development sites and their policy context. Read the relevant allocation alongside CS7. Town-centre brownfield land may still contain trees, planted boundaries or other habitats that influence the baseline and layout.

A practical Woking planning example

Illustration: a site beside the Basingstoke Canal retains a treed bank but loses amenity grassland. Map the bank and grassland separately, assess the canal relationship and calculate relevant unit categories. New housing may also need a separate SPA assessment.

Plan off-site delivery and long-term management

Calculate the genuine shortfall before committing to off-site units. Apply the relevant gain hierarchy, habitat trading rules and location requirements to the proposed delivery route.

Use the Surrey Local Nature Recovery Strategy to explore habitat opportunities. Confirm registration, suitable units and current availability directly with the proposed supplier.

Read about off-site biodiversity units, Biodiversity Gain Plans and Habitat Management and Monitoring Plans.

Council and delivery costs

What should your Woking BNG budget cover?

Budget for habitat surveys, metric calculations, planning reports and any gain-plan or management work. The scope depends on the site, habitat types and planning stage.

Budget separately for any SANG/SAMM requirements and current council charges. Confirm the applicable zone, development type and contribution schedule before setting the project budget.

Planning evidence

Woking BNG preparation checklist

Free resource: Use the local BNG planning evidence route worksheet. It provides a light, accessible reference to official documents and the difference between BNG and separate ecological duties.

Planning evidence worksheet

Find your Woking planning and evidence route

Use these questions to identify the planning documents, habitat evidence and delivery information relevant to your site.

Open the question relevant to your project

Which planning authority and adopted plan?

Woking Borough Council. Woking borough, not Guildford, Surrey Heath or Elmbridge. Surrey County Council covers upper-tier and minerals/waste planning where relevant.

Adopted framework: Woking Core Strategy adopted 25 October 2012, Development Management Policies adopted 20 October 2016, Site Allocations Plan adopted 14 October 2021. Policies: CS7 – Biodiversity and Nature Conservation.

Check the red-line boundary, current local list and official policies map. The county parent is Biodiversity Net Gain in Surrey.

Is a new Local Plan or higher BNG target already operative?

The 2012 Core Strategy was reviewed in 2023 and remains part of the current Development Plan. Do not treat a review as the adoption of a replacement. Check the council's current local plan preparation notices for later changes.

The current national 10% requirement applies to eligible development, subject to exemptions. An emerging percentage must not be presented as an adopted obligation.

Which published LNRS and map apply?

Surrey Local Nature Recovery Strategy — Published 31 March 2026. Responsible authority: Surrey County Council.

Match the site to an actual mapped measure and suitable habitat. Record the mapped recovery measure and survey evidence supporting the metric entry.

View the official local nature recovery materials

Could my application qualify for a 2026 BNG exemption?

For applications from 6 August 2026, a red-line site up to 0.2 hectares may qualify if no onsite priority habitat is adversely affected. Other householder, de minimis, temporary and transitional categories have distinct conditions.

Current GOV.UK exemption guidance

What separate habitat or designated-site issue matters here?

The Thames Basin Heaths SPA and Thursley, Ash, Pirbright and Chobham SAC are material to local development. Residential proposals in the relevant impact zone may need SANG and SAMM. Check the council's avoidance strategy, actual zone and availability; no blanket fee has been assumed.

Coordinate any Habitats Regulations, protected-species and water-quality evidence with the BNG work.

Appropriate assessment guidance

When do I need a gain plan and habitat management?

Planning-stage documents depend on the current council validation list and proposal type. The final statutory gain plan is normally approved after permission and before commencement. Significant habitat gains may need at least 30 years of secured management and monitoring.

Biodiversity Gain Plan guidance

Details to gather before an enquiry

Sources reviewed: 10 November 2026

Project support

How ACP can help with your Woking project

ACP can help scope the habitat surveys, metric calculations and planning reports needed for your Woking proposal. Early advice is most useful while the layout can still change.

We can consider Basingstoke Canal and Hoe Stream corridors, Thames Basin heathland, town-centre sites and woodland links alongside the site’s planning route and proposed works.

Discuss your Woking site with ACP →

Local planning questions

Frequently asked questions about BNG in Woking

For a site-specific question, discuss your project with ACP.

Which Local Plan is used for Woking BNG?

Woking's adopted Core Strategy 2012, Development Management Policies 2016 and Site Allocations Plan 2021 remain relevant. CS7 is a biodiversity policy alongside national BNG law.

Does Woking's 2023 review replace the Core Strategy?

No. The council reviewed its Core Strategy in 2023. That is not the same as adopting a new replacement Local Plan.

Can SANG payments replace statutory biodiversity units?

No. SANG and SAMM are typically measures to address recreational disturbance of protected heathland. BNG calculates habitat gains under separate legislation.

Are canalside habitats part of the metric?

Relevant banks, grassland and watercourses may be separate habitat modules. Their classification depends on survey evidence and whether the metric's watercourse criteria apply.

Which habitat surveys might a site in Woking need?

Scope the assessment around the habitats and proposed effects. In Woking, relevant settings include Basingstoke Canal and Hoe Stream corridors, Thames Basin heathland, town-centre sites and woodland links. The red-line plan, habitat condition and any water or species pathways determine the survey work.

How should I use the local nature recovery map?

Use the published map to match the site and proposed habitat to a recovery measure. Survey evidence and feasible management then support the design and metric calculation. Confirm the planning authority separately, including any National Park jurisdiction.

How do BNG exemptions work for a small Woking development?

Since 6 August 2026, a red-line site of 0.2 hectares or less may qualify for exemption if the statutory conditions are satisfied, including no adverse effect on onsite priority habitat. Other ecological duties may remain.

How can habitat retention help with BNG in Woking?

Retain valuable habitats and connections where feasible, and test how the layout affects them. If a genuine shortfall remains, use the applicable gain hierarchy and habitat trading rules to select a suitable delivery route.

When is the final gain plan needed for Woking Borough Council?

For eligible ordinary applications the final statutory Biodiversity Gain Plan normally needs approval after planning permission and before commencement. Check what the council asks for during validation and whether a management plan is needed.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.