Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Blaby / Surveys · Design advice · Planning

Bat surveys in Blaby

Blaby’s green wedges run through a landscape of housing, warehouses and old transport routes. At Glen Parva the people responsible for a path, its lighting and the neighbouring habitat may all be different. Identify the physical works and the land needed to deliver them.

We explain adopted policy, the changing Local Plan and opportunities to reduce ecological impacts through design.

Discuss your Blaby project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Blaby: place the proposal in its local setting

Blaby council boundary
The inset locates Blaby in Leicestershire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km

Local context · Blaby · Whetstone · Narborough · Enderby · Leicester Forest East · Confirm district, not postcode

Enlarge map · Leicestershire locator
Blaby council boundaryThe inset locates Blaby in Leicestershire. North is up. The scale bar applies to the main map.
Blaby council boundary. The inset shows its position in Leicestershire. North is up. The scale bar applies to the main map.

The district includes Blaby, Whetstone, Narborough, Enderby, Leicester Forest East and the Fosse villages, with changing suburban edges, older roofs, hedgerow networks and the Soar/Whetstone Brook landscape. The brook and green boundaries around larger housing sites deserve attention because changes in floodlighting, hedgerow retention and access can interact with ecological movement. These examples describe risk pathways, not known roost locations. [3; 10]

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Blaby’s Core Strategy and Delivery DPD

Current framework

Blaby's adopted Core Strategy (February 2013) includes CS19 Biodiversity and Geodiversity, supported where relevant by CS14 Green Infrastructure. The Delivery Development Plan Document (February 2019) remains part of the adopted development plan and contains detailed policies for development management and settlement context. These policies should be applied with the location-specific proposals map, rather than turning a broad landscape designation into an automatic finding of a roost. [1]

Blaby’s November submission meeting · Checked 23 November 2026

Checked 23 November 2026

The Regulation 19 consultation closed on 7 September 2026. Blaby placed submission for independent examination on its 24 November full council agenda. When preparing an application, check the published decision and the Planning Inspectorate’s submission record before relying on the replacement plan. Read the council agenda and submission report.[2]

Blaby validation and county ecology advice

Supporting information

Blaby’s validation page explains that requirements vary by proposal and application type. Read its linked checklist with the scheme’s actual effects. County ecology advice can inform the decision; Blaby remains the planning authority. Identify any relevant made neighbourhood plan and the features affected. [14; 5]

What the Whetstone applications show

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [10]

Local evidence / Practical design

Put the works and evidence on the same drawings

Define the proposal

Start by confirming that Blaby is the local planning authority, identifying any made neighbourhood plan and reading the live validation requirements. Provide full roof/landscape drawings, site photos, intended lighting and any previous bat reports. Where a site lies near the district edge or watercourse, show why a feature is likely to be affected rather than claiming all nearby development automatically needs the same evening visits. [1; 4; 10]

Explain scope and limitations

A useful submission

A sound ecology statement normally records the proposal’s impact pathways: work to existing fabric, direct tree and vegetation change, indirect disturbance, night lighting and potential for habitat severance. It also identifies what was not surveyed, when the evidence was gathered and the assumptions made about access. If a report is more than a few seasons old or a design changes materially, seek professional advice on whether additional evidence is needed; there is no blanket statutory “bat report validity” period for every case. [10; 12]

Local evidence / Practical design

Lessons from local planning records

Whetstone: ecology recommendations become design requirements

Public record

The 12 March 2026 minutes for 24/0869/FUL, a 59-home scheme east of Springwell Lane, record conditional approval subject to a legal agreement. Listed conditions address ecological-appraisal recommendations, external lighting and construction management. This verifies the committee stage, not a signed permission or completed mitigation. [3]

A neighbouring item needed more information

Practical interpretation

The same minutes record 25/0532/FUL as withdrawn from that meeting following a late statutory-consultee objection requiring further survey work. That is not a refusal or permanent withdrawal of the application. Establish what information remains outstanding before relying on a committee date. [3]

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Four owners and one connected reserve

Glen Parva Parish Council describes two adjoining reserves covering 12.1 hectares in total, with land held by four councils. National Cycle Route 6 runs through the site. For a proposal to light an entrance, the ownership boundary helps establish who must agree the works. The ecological question follows the connected habitat into the next parcel.

Glen Parva Parish Council’s reserve and access information

Local evidence / Practical design

Bat records, local knowledge and habitat connections

What records can establish

Regional bat-group accounts provide background on species recorded across Leicestershire and Rutland. They do not establish a Blaby population figure or occupation of an individual roof. A suitable records search and field assessment must relate to the actual proposal. [7; 8]

Keep potential roost features, recorded activity and confirmed roost use separate. Weather, access, survey effort and identification confidence affect the evidence. Acoustic passes are not counts of individual bats. [10; 12]

Nature recovery and current context

Scale matters

The Leicestershire, Leicester and Rutland Local Nature Recovery Strategy was published in August 2025 and provides a landscape-level framework for restoration opportunities. It is relevant to how development near urban edges, brooks and mature hedgerows may be designed, not a replacement for Blaby's adopted CS19 or a verified bat route map. [6]

The county environmental records service offers a route to proportionate desktop evidence. Its overall species-record totals are not bat population measurements for Blaby. Leicestershire and Rutland Bat Group undertakes and promotes monitoring across its wider area; publicly announced events must not be treated as completed survey results. [7; 9]

Retain / Adapt / Assess the remaining effects

Explore design options before fixing the scope

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Blaby design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Near Whetstone Brook

Try to retain vegetation that provides structure and shelter; demonstrate the effect of paths, fencing and external lights on the actual corridor. If a lighting scheme cannot avoid spill, evaluate fitting position, shield design, intensity, hours and alternatives with an ecologist and lighting designer. Do not transfer a case-specific condition from Springwell Lane to every site. [3; 13]

Alterations to village roofs

Before replacing tiles, repairing soffits or converting a loft in Narborough or Cosby, inspect features that might admit bats and define the actual works. Retaining unaffected roof junctions may reduce risk. If an assessment indicates possible roost use, survey timing and licensing must be considered; replacement bat boxes are not automatic permission to destroy a roost. [10; 11]

Industrial/warehouse sites

Logistics buildings can change the night-time environment over a larger area than their footprint. Show loading-bay operation, high mast lights, signs, road access and boundary vegetation; address construction lighting as well as the final design. The need for activity evidence must be proportionate to likely impacts, not simply the fact that an application is commercial. [13]

Housing layouts and phasing

Keep mature hedgerows and protected trees where feasible, test layouts before fixing road alignments and avoid new buildings severing an important green route where evidence supports one. Update survey coverage if a red-line boundary or access route changes materially. [10]

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Local evidence / Practical design

Choose the evidence that answers your project question

A practical brief for a path entrance

Photograph the entrance from both directions after dusk and record the existing hours of use. Compare a lit entrance, a shorter lit section and a daylight-only access option. If the works include hedge cutting, identify who controls the far side before promising to retain continuous cover.

Scope the right starting evidence

A preliminary building inspection may be appropriate for the affected structure; an activity appraisal may instead be central where proposals alter vegetation, water or night lighting. For some schemes both strands are needed; for others, one or neither is warranted after competent assessment. The available survey season, method and need for updated evidence should be discussed before an application timetable is fixed. [10; 12]

If roost impacts remain

Avoidance and legal route

If roost use is confirmed, first explore ways to preserve it, then evaluate mitigation and the separate Natural England licence route where relevant. An unconfirmed developer ecology finding, a committee resolution and a licence cannot be collapsed into the same conclusion. [11; 3]

Seasonal evidence

Plan justified emergence work around the roost question, season and appropriate coverage.

Bat emergence surveys

Trees and habitat

Review affected tree features, access and connected habitat together.

Bats in trees

Lighting design

Identify ecological receptors before choosing light positions, output and controls.

Bats and lighting

Local evidence / Practical design

Link the recommendation to a named drawing

For a warehouse, record the loading-door elevation, the service yard lighting revision and the hedge section together. Otherwise a change to opening hours can be assessed against an out-of-date boundary layout.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Blaby bat survey questions

What bat planning policy applies in Blaby?

Core Strategy CS19, read with the 2019 Delivery DPD and other site-relevant policies. [1]

Is the new Blaby Local Plan adopted?

The replacement plan was still in preparation at the date checked. A projected future submission is not adoption. [2]

Do planning conditions prove mitigation has succeeded?

No. A requirement for ecology or lighting details is different from evidence that those measures were installed and are working. [3]

Did 24/0869/FUL receive a final permission?

The 12 March meeting resolved to approve subject to requirements; a signed notice was not verified in this review. [3]

Was the west Springwell Lane scheme refused?

No refusal is established. The item was withdrawn from that meeting pending further information. [3]

Does land ownership at Glen Parva set the limit of a survey?

Ownership determines access and responsibility for maintenance. The survey area depends on the change being assessed. Light from an entrance can cross a boundary, so agree access or a documented alternative viewpoint with the adjoining owner.

Local evidence / Practical design

Discuss your Blaby project

Who could deliver the Whetstone lighting change?

Send the fit-out plan, yard operating hours and ownership of any perimeter lights. If the boundary faces a cycle route, include its position relative to the lit yard and identify who can permit observations from that side.

Discuss your proposal