Bat surveys in Boston

At Boston, a line of hedge along a flood bank can give bats shelter across otherwise open fields. On a town-centre warehouse, the important detail may be a roof joint facing the Haven. Show both the physical works and what happens along the water after dusk.

See the local planning examples

Discuss your Boston project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Boston: place the proposal in its local setting

Boston council boundary
The inset locates Boston in Lincolnshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km

Local context · Boston · Kirton · Swineshead · Witham / Haven landscape · Joint plan with South Holland

Enlarge map · Lincolnshire locator
The inset locates Boston in Lincolnshire. North is up. The scale bar applies to the main map.
Boston council boundary. The inset shows its position in Lincolnshire. North is up. The scale bar applies to the main map.

The Haven, Old Hammond Beck and Boston’s field drains

The local authority determines the planning context; the feature affected by the work determines the initial ecological question. Boston's urban centre, historic riverside fabric and neighbouring villages such as Kirton and Swineshead occupy a landscape crossed by drainage infrastructure and low-lying agricultural land. A converted dwelling or warehouse may offer roof or masonry access features, while a rebuilt bridge, drainage intervention or access road may affect adjacent trees and vegetation.

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Policy 28 in Boston and South Holland

Current framework

The South East Lincolnshire Local Plan 2011–2036, adopted on 8 March 2019, covers Boston and South Holland. Policy 28, especially parts 2 and 3, addresses protected or priority habitats and species, habitat fragmentation and connected ecological networks. Its requirements include appropriate prevention, mitigation and compensation. Design and site-specific policies may also apply. [12]

The South East Lincolnshire joint plan timetable

Reviewed 26 November 2026

Boston and South Holland are preparing a successor joint plan towards 2044. The May 2026 committee record covers programme work. The November meeting also considers reserve-site policy; it does not adopt a replacement plan. Keep the 2019 adopted framework separate from future plan-making stages. [2; 3]

Application evidence for Boston Borough

Supporting information

For an application, look for current Boston Borough validation requirements and any specific ecology advice affecting the development. A practical bat survey begins with buildings, trees, bridges, demolition, security lighting and vegetation, rather than counting generic county records. Flood risk, Water Framework Directive issues and protected species each have their own evidence and decision functions. [4] [7]

Lighting and drainage in the same submission

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [7]

Local evidence / Practical design

Look along the embankment as well as across the channel

A drainage job may keep the watercourse in place while clearing the hedge on its bank for machinery. Around Swineshead Road, draw the access and working width alongside the finished drainage layout. At a riverside warehouse, show how scaffolding, occupied rooms and yard lighting would each affect the bank at different stages.

Local evidence / Practical design

What Swineshead Road and Rosegarth Street tell a designer

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Swineshead Road: coordinate lighting and drainage

The B/25/0042 committee record includes applicant statements about Old Hammond Beck and lighting effects on protected or notable species. Its listed lighting condition covers locations, specifications, illuminance and operating times. This is evidence of design scrutiny, not a confirmed bat roost or a universal light limit. [5]

Rosegarth Street: habitat gain is a separate task

The B/25/0386 record considers revised planting and a biodiversity gain plan. Habitat enhancement does not replace an assessment of roost impacts. Keep drainage, landscape, lighting and protected-species evidence coordinated, with each requirement clearly identified. A committee record is not verification of completed works. [6]

Local evidence / Practical design

What four Boston transects actually recorded

The Boston Alternative Energy Facility environmental statement reports five, eight, four and four bat passes on separate visits from June to September 2019. Common and soprano pipistrelles featured in the records. The surveyors associated movement and feeding with hedges along the flood embankment and adjacent arable fields. In July, the surveyors recorded eight passes during that visit. The same bat could have passed more than once.

Applicant’s terrestrial ecology chapter, table 12-8

Greater Lincolnshire's Local Nature Recovery Strategy was published in August 2026, giving a strategic context for habitat connections and restoration. Its evidence and map could help a Boston project decide where vegetation and wet corridors can be reinforced. It does not map private bat roosts or remove the need for a site-specific assessment. The South East Lincolnshire replacement plan still needs future plan-making stages and is not adopted as of the check date. [10] [2]

Retain / Adapt / Assess the remaining effects

Boston warehouse elevations, flood banks and access to drains

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Boston design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Historic town-centre warehouse

Before replacing roofing or repointing old walls, inspect the affected roofline, mortar joints and access points. Modify work sequence or keep functional access where evidence shows it matters.

Rural farm building conversion

A barn survey can identify a reason to retain a gable access feature, shift internal partitioning or avoid an important roof cavity. The feasibility of reduced impact depends on actual occupation and lawful method.

Drain or bridge maintenance

Survey trees, gaps, culverts and likely impact areas. Time work and reduce temporary bankside lighting where justified, and consider whether a different access route can protect retained vegetation.

Fenland edge housing and parking

Avoid clearing hedge and drain connections for site lighting and visibility if an alternative layout is viable. Coordinate drainage and ecology design; one does not substitute for the other.

Local evidence / Practical design

How to survey a Boston drain maintenance scheme

Identify the sections where machinery needs access, which trees or hedge lengths must be cut and whether work extends after dark. Observers can then concentrate on the crossing or sheltered edge that is likely to change. A detector left on an accessible road bridge may sample a different part of the drain.

Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting

Local evidence / Practical design

Schedule bank clearance and roof works against the evidence

Before issuing a package to the contractor, separate the area covered by the bat survey from any additional access strip. Record when each side of the bank was visible. For a phased job, ask whether the second phase removes the cover on which the first phase’s assessment relied.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Boston bat survey questions

Do eight passes mean that eight bats were present?

No. The July visit recorded eight passes. A single bat may pass an observer several times, and other bats can fly beyond detection range.

Should I include a farm drain outside the red line?

Show it if works or lighting could affect its bank or a route connecting to it. Explain which parts the team could access.

Is a Rosegarth Street biodiversity gain plan sufficient for bats?

The gain plan deals with habitat outcomes. Evidence for a possible roost in a particular structure needs a separate conclusion.

What if the hedge is retained but cut back for access?

Show its temporary width, height and any gap, not just its final planting line. Those changes can alter the shelter available during construction.

Can an old warehouse on the Haven be inspected from the street?

Record the views available there and the roof faces hidden from them. The ecologist may need access to a different elevation or a safe observation position.

Does a replacement plan to 2044 already apply in Boston?

The joint committee has considered preparation of a successor plan. Use the adopted South East Lincolnshire plan and check later formal decisions before submission.

Local evidence / Practical design

Discuss your Boston project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal

Connected guidance

Connect local and national advice

See the Lincolnshire county guide for wider landscape context and the England hub for the national route.

Our main bat survey service explains the process. Planning permission, habitat BNG and protected-species licensing remain distinct matters.