Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Derbyshire Dales / Surveys · Design advice · Planning

Bat surveys in Derbyshire Dales

The river works recorded at Ednaston and the management of Cromford Canal show how a proposal can affect bat habitat without removing a building. In Derbyshire Dales, check the National Park boundary, the works beside the water and the temporary route machinery will use to reach them.

See the local planning examples

Discuss your Derbyshire Dales project

  • Local policy and public planning evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local context / Council boundary / Site-specific evidence

Derbyshire Dales: locate the proposal and planning authority

Derbyshire Dales council boundary
The inset locates Derbyshire Dales in Derbyshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryPeak District National ParkScale bar · 20 km

Local context · Matlock · Darley Dale · Wirksworth · Ashbourne · Brailsford · Bakewell: National Park planning

Enlarge map · Derbyshire locator
Derbyshire Dales council boundaryThe inset locates Derbyshire Dales in Derbyshire. North is up. The scale bar applies to the main map.
Derbyshire Dales council boundary. The inset shows its position in Derbyshire. North is up. The scale bar applies to the main map.

Cromford, Ednaston and the district planning boundary

Matlock and Darley Dale sit among Derwent-valley settlements where a building conversion may affect roof voids and nearby wooded corridors. By contrast, Ashbourne and Brailsford bring farm buildings, pastures, trees and field boundaries into many project briefs. Wirksworth combines historic stone buildings with former industrial and quarry-related landscapes. These descriptions identify possible survey questions, not confirmed bat habitat on a specific property. [D-01; D-N01]

Map scope ONS December 2025 council boundary and county inset. Gold shows the National Park overlap from Natural England mapping. Place names are orientation labels, not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0. Park boundary © Natural England. National Parks (England) dataset.

Contains OS and National Statistics data © Crown copyright and database right 2025; Natural England data where shown. Open Government Licence v3.0. ACP cartography.

In the Peak District part of the district, a proposal around Bakewell or the Wye valleys requires a Park Authority policy check. The same statutory bat protection applies, but the authority, policies and validation route differ. Ask for the actual site boundary or location plan before relying on a local-policy summary. [D-06; D-07]

Local evidence / Practical design

Adopted policy, emerging plans and validation

Derbyshire Dales policies outside the National Park

Current policy

Outside the National Park, the Derbyshire Dales Local Plan 2013–2033, adopted on 7 December 2017, is the starting point. PD3 addresses biodiversity and the natural environment; PD4 covers green infrastructure; PD5 landscape character; and PD6 trees, hedgerows and woodlands. Read the applicable policy and mapped constraints together. [D-01; D-02]

The Derbyshire Dales plan review

Checked 23 November 2026

The 2026–2042 Regulation 19 consultation closed on 14 September 2026. The published programme anticipated submission in December 2026, examination in 2027 and adoption in 2028. Those are planned stages, not completed decisions. The draft policy revisions must remain distinct from adopted PD3–PD6. [D-03; D-04]

Validation and supporting information

Application requirements

The council’s January 2025 checklist describes biodiversity-report triggers, including development potentially affecting designated or locally important sites. Apply the current checklist to the application type and actual effects. A habitat concern does not automatically prescribe a fixed emergence-survey package. Park applications use the Park Authority’s requirements. [D-validation; D-08]

National Park policy

Separate decisions

The Park’s adopted 2011 Core Strategy and 2019 Development Management Policies include DMC11 on biodiversity. Its 2026–2045 draft consultation closed on 20 September 2026; the supplementary housing-policy consultation closed on 10 November. Neither consultation is adoption. [P-policy; P-review]

Local evidence / Practical design

What the Ednaston committee minutes establish

Ednaston restoration: keep decision stages clear

For 24/01087/FUL, the April 2025 committee minutes record river and floodplain restoration at Ednaston Estate and a resolution to approve subject to conditions. This later record improves on relying only on an officer recommendation. It is not proof of licence issue or conditions being discharged. [D-minutes]

Design lesson: protect the retained features

For river and tree work, draw the construction footprint, machinery access and retained trees together. A retained tree symbol alone does not describe how roots, cavities or adjacent dark habitat will remain protected. This is a design principle, not a claim that the Ednaston works achieved a measured bat outcome. [D-N01; D-N04]

These examples are independent public records, not ACP projects. They do not establish bat presence or a guaranteed outcome at another site.

Local evidence / Practical design

Reading the Cromford Canal management plan

The county council’s canal conservation plan links the canal’s invertebrate life to potential feeding habitat for bats. It identifies trees and structures with potential for roosts, while flagging limited recording effort. For a repair near Cromford, distinguish the section of masonry being altered from the tree or water edge that could be lit or obstructed during access.

Read the Cromford Canal conservation plan on ecological significance

The September 2025 Derbyshire Local Nature Recovery Strategy provides wider habitat priorities for the county and Derby. Use it to explore woodland, hedgerow and watercourse connections, then verify the actual site features. It is not a roost map or a replacement for the development plan. [D-N05]

Retain / Adapt / Check the remaining effects

Protecting the bank and the access route during river restoration

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Derbyshire Dales design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual design illustration. It shows questions to resolve, not a measured site, confirmed roost or approved mitigation scheme.

Stone barn or roof conversion

Consider whether eaves, crevices, relevant roof voids or confirmed roost access points can remain functional. Preserve evidence and commission a preliminary inspection before opening fabric. Where a roost is confirmed, make design changes with specialist advice and address licensing separately. [D-N01; D-N02]

Tree and river works

Plot mature trees, likely access routes and in-channel works before finalising excavations. Retaining features with bat-roost suitability may reduce direct impacts. [D-N01; D-N04]

Paths, bridge lighting and access

Show temporary lighting as well as permanent fittings. Avoid directing light towards retained water and wooded corridors where effects are credible. Test options such as moving columns, aiming luminaires and reducing operating hours before specifying final fittings. [D-N04]

We proactively discuss whether changing the roof works, access, lighting or retained habitat could reduce an impact. Any decision to reduce survey work still needs a sound ecological basis. A design change does not automatically remove legal duties.

Local evidence / Practical design

Design a survey brief for the Ednaston working area

For floodplain works, show where machines turn, stockpiles stand and access crosses tree roots or canopy. Compare these areas with the original habitat plan. The difference can identify a bank section or tree needing investigation even where the restoration design retains the feature in its final state.

Building assessment · Emergence surveys · Trees and bat features · Lighting and design

Local evidence / Practical design

Keep canal-bank lighting and structural repairs separate

One drawing can show the works together, but each effect needs its own explanation. Lighting a towpath may affect the sheltered water margin. Repointing or dismantling masonry may affect an opening. Specify which is being assessed, how it was observed and whether the proposed design avoids it.

Local evidence / Practical design

Before installing the temporary access at Ednaston-type sites

Agree the working width and mark the exact trees to retain on the contractor’s drawing. Include a change procedure for soft ground or flooding. A diverted haul route along the bank may need a fresh assessment even where the permanent river design stays the same.

Survey season guidance · cost guide · methods, field forms and recording resources

Compact answers / Clear next steps

Derbyshire Dales bat survey questions

Does Cromford Canal’s designation prove bats use a particular bridge?

No. Read the designation and habitat evidence, then investigate the structure or route affected by the works.

What did Derbyshire County Council say about bat records on the canal?

Its conservation plan notes limited recording effort alongside possible feeding habitat and potential roost features. Sparse records need careful interpretation.

What does the Ednaston resolution establish?

The committee resolved to approve with conditions. Check the issued notice, condition approvals and any separate licensing documents.

Could temporary access matter more than the permanent works?

It can, especially where machinery must pass under retained trees or light an otherwise sheltered bank. Map both footprints.

Who determines proposals inside the National Park?

Check the National Park Authority’s planning area against the actual works. A Derbyshire Dales postal address alone is insufficient.

How should I show plans for towpath masonry?

Label the lengths, proposed treatment, voids or joints affected and working access. Match the labels to the ecologist’s inspection.

Local evidence / Practical design

Discuss your Derbyshire Dales project

Send the details that change the scope

For an Ednaston-type river scheme or Cromford towpath repair, send the bank section, access and turning area, tree schedule and any masonry specification. Identify the lengths affected by temporary as well as permanent work.

We can review these together and flag which bank, tree or structural detail needs a closer look before the construction method is settled.

Discuss your proposal