Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Harborough / Surveys · Design advice · Planning

Bat surveys in Harborough

A new crossing on the Welland in Market Harborough needs a different bat brief from a barn near Ullesthorpe. The river question concerns continuity along a bank. The barn question concerns specific openings and how the works would affect them.

Understand the adopted plan, the live examination and which ecological questions need answering before your application.

Discuss your Harborough project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Harborough: place the proposal in its local setting

Harborough council boundary
The inset locates Harborough in Leicestershire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km

Local context · Market Harborough · Lutterworth · Kibworth · Great Glen · Foxton · Welland and canal context

Enlarge map · Leicestershire locator
The inset locates Harborough in Leicestershire. North is up. The scale bar applies to the main map.
Harborough council boundary. The inset shows its position in Leicestershire. North is up. The scale bar applies to the main map.

Harborough extends across Market Harborough, Lutterworth, Broughton Astley, Kibworth, Great Glen and villages including Foxton, Ullesthorpe and Husbands Bosworth. The Welland valley, Grand Union Canal/Foxton Locks, farmed landscapes, hedgerow networks and older brick or stone buildings create distinct contexts for assessing impact. Public rights of way and local heritage may affect design choices, but do not establish an occupied roost. A site on the district's edge may be closer to Rutland, Warwickshire or another Leicestershire council than to Market Harborough; confirm the decision-maker by boundary. [1; 5; 14]

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

GI5 and the Harborough policies map

Current framework

The operative local framework includes the Harborough Local Plan 2011–2031, adopted 30 April 2019. Policy GI5 Biodiversity and Geodiversity is especially relevant to important habitat, species and connected landscape elements, along with other site-specific policies. Check the adopted map and case-specific implications; a mapped green route is not automatically a confirmed bat flight path. The 2021 Development Management Supplementary Planning Document can supply additional detail where relevant, but a supporting document does not override law or the adopted plan. [1; 5]

Harborough’s Local Plan examination · Checked 23 November 2026

Checked 23 November 2026

The Harborough Local Plan 2020–2041 was submitted for examination on 17 April 2026. Stage 2 hearings began in November; the published version 4 timetable includes sessions on 24 November and 1 December 2026. Examination is not adoption. Check the programme for changes before attending or relying on an emerging policy. [2; 16]

Harborough’s ecology and validation advice

Supporting information

Leicestershire County Council offers ecology advice across several districts including Harborough. Its desktop-record guidance informs the evidence route, but each planning application should still be checked against Harborough's current local validation list and the appropriate ecological trigger. A survey may be necessary where buildings, trees or corridors will be affected; no universal 'all old barns' requirement follows solely from the district name. [6; 10]

Evidence to resolve at outline stage

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [10]

Local evidence / Practical design

Put the works and evidence on the same drawings

Define the proposal

Start with the adopted 2019 plan and a current policy map, identify any made neighbourhood plan, then review Harborough's published validation criteria. Supply the exact structure/tree/landscape scope and the date of prior reports. Explain any interim changes at the site and keep separate records of consented ecology and the proposed design. The 2026 emerging plan examination should be dated information only, not an 'adopted policy' badge. [1; 2; 5]

Explain scope and limitations

A useful submission

A sound ecology statement normally records the proposal’s impact pathways: work to existing fabric, direct tree and vegetation change, indirect disturbance, night lighting and potential for habitat severance. It also identifies what was not surveyed, when the evidence was gathered and the assumptions made about access. If a report is more than a few seasons old or a design changes materially, seek professional advice on whether additional evidence is needed; there is no blanket statutory “bat report validity” period for every case. [10; 12]

Local evidence / Practical design

Lessons from local planning records

Ullesthorpe: potential and non-detection can coexist

Public record

For 25/01565/OUT, south of Ashby Road, the officer report’s paragraph 6.64 summarises no bat evidence within the assessment while identifying a potentially suitable tree. Paragraphs 6.65–6.66 discuss precautions, bat-box enhancement and ecology conditions. That does not establish permanent absence or a district population trend. [3]

Keep the survey scope visible

Practical interpretation

Record which features were assessed, the methods, dates and limitations. A retained tree may still need protection from access, canopy works and light. Bat boxes described as enhancements do not automatically compensate for an occupied roost. The report is not proof that a permission or licence was issued. [3; 10]

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Northampton Road and the River Welland

Harborough’s town-centre masterplan identifies the Northampton Road crossing of the Welland as a gateway. That is a design opportunity, not evidence of a bat flight line. A scheme to mark the gateway with lighting should show how the underside of the crossing, bank vegetation and water surface would look from the river after dark.

Market Harborough Town Centre Masterplan

Local evidence / Practical design

Bat records, local knowledge and habitat connections

What records can establish

The county bat group identifies species groups across Leicestershire and Rutland, not Harborough-specific densities. The Ullesthorpe report offers a narrower, site-specific example: no bat evidence reported from a survey scope, with one tree nevertheless regarded as potentially suitable. Neither a non-detection nor tree suitability demonstrates the size or trend of a district population. [3; 9]

The public regional nature recovery strategy includes priority species and habitat opportunities. A record attributed to a species or genus elsewhere in Leicestershire cannot be moved onto a Harborough map without an authorised location-filtered evidence search. A bat detector pass is not an individual bat. No reliable comparable Harborough district bat population estimate was verified. [7; 8]

Nature recovery and current context

Scale matters

The August 2025 LNRS supports consideration of greener links among woodland, water, farmland and settlements. Near Foxton Locks, a designer might need to assess path illumination and retained habitat, but must not assume that the canal is a documented protected commuting route at every point. [7]

Harborough's active examination and neighbourhood plan reviews make this a district where policy dates are worth showing prominently. Project teams should keep the adopted plan and emerging examination as separate rows, then check the latest notice before submission. Long-running ecology case files such as Gartree 2 can teach methods, yet dated material must never be promoted as fresh species records. [2; 4]

Retain / Adapt / Assess the remaining effects

Explore design options before fixing the scope

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Harborough design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Barn conversions and historic roofs

Review accessible lofts, broken tiles, ridge details, wall crevices, barn doors and potentially suitable beams in the context of the proposed works. Where feasible, keep suitable structural features outside the works envelope. If a roost is confirmed, use competent ecological advice on avoidance, mitigation and licences; a new roof design cannot be justified by assuming absence because the building is currently vacant. [10; 11]

Canal, locks and riverside work

Draw existing vegetation, water, access routes and lights. Try to retain mature hedgerow and tree connections; direct light away from potentially important dark edges while meeting safety obligations. For a large greenfield scheme, examine the ecological effect of access and drainage as well as homes. [7; 13]

Rural field edges and isolated trees

The Ullesthorpe case shows the need to distinguish 'survey found no evidence' from 'feature has potential'. A design that keeps a tree and avoids affecting its canopy may reduce the impact pathway, but the suitability and stability of that solution need actual site assessment. Avoid a fixed unverified survey buffer around every field tree. [3]

New settlement edges

Update ecology boundaries if an access road, construction compound or lighting plan changes. Reserve sufficient time for appropriate seasonal work rather than treating every follow-on report as a condition to be written after approval. [10]

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Local evidence / Practical design

Choose the evidence that answers your project question

Briefing a gateway lighting scheme

Ask the designer for a longitudinal view along the water as well as a street elevation. Identify whether pedestrians need light on the footway, beneath the bridge or on the far bank. These are separate design choices. Record the baseline at the same locations before predicting the change.

Scope the right starting evidence

Early scoping may start with a PRA for an affected roof, or a landscape appraisal where changes to hedgerows, field trees or lighting dominate. Dusk/dawn or activity surveys may be appropriate only when the risk and method justify them. Survey effort depends on features, potential impact, season and access, so check the programme before assuming the application can be lodged with no later work. [10; 12; 15]

If roost impacts remain

Avoidance and legal route

If impacts remain, design avoidance first; then assess any mitigation and whether Natural England licensing may be required. Do not state that an outline permission guarantees bat licence approval or that a bat box by itself resolves an occupied-roost issue. [11]

Seasonal evidence

Plan justified emergence work around the roost question, season and appropriate coverage.

Bat emergence surveys

Trees and habitat

Review affected tree features, access and connected habitat together.

Bats in trees

Lighting design

Identify ecological receptors before choosing light positions, output and controls.

Bats and lighting

Local evidence / Practical design

Keep the building visit tied to the affected fabric

At a barn, record which roof slopes and wall heads could be inspected from inside. Compare that coverage with the conversion drawing. A retained elevation can still need attention if scaffolding or new rooflights change its approach.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Harborough bat survey questions

Which Harborough Local Plan is adopted?

The Local Plan 2011–2031 adopted 30 April 2019, including GI5. [1]

Is the 2020–2041 plan in force?

It was submitted for examination in April 2026, but not adopted at the date checked. [2]

Where can I follow the Harborough examination hearings?

The inspectors’ stage 2 timetable lists sessions on 24 November and 1 December 2026. See the council’s examination hub for timetable updates and arrangements for watching the hearings. [2]

Did the Ullesthorpe report prove no bats live nearby?

No. It described no evidence within its survey scope, while identifying a potentially suitable tree. [3]

Which neighbourhood plan applies?

Check the precise parish and made status; an emerging or referendum version is not automatically adopted. [5]

Does a gateway shown in the masterplan already have planning permission?

The masterplan provides design context. Check the application for the particular works and its approved drawings. The word “gateway” establishes neither a requirement for illumination nor a finding about how bats use that reach of the Welland.

Local evidence / Practical design

Discuss your Harborough project

Briefing a Welland crossing or an Ullesthorpe barn

For river works, show access to each bank and the proposed lighting direction. For barn work, supply the existing roof details, planned repairs and any earlier inspection limitations. These determine which questions the team can answer first.

Discuss your proposal