Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Hinckley and Bosworth / Surveys · Design advice · Planning

Bat surveys in Hinckley and Bosworth

In Hinckley and Bosworth, a change of operating hours can matter as much as a new fitting. A wharf, canal bridge or warehouse approach may be busy by day but retain an unlit edge after closing.

We link the adopted policies and emerging plan with proportionate surveys, public planning lessons and practical avoidance options.

Discuss your Hinckley and Bosworth project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Hinckley and Bosworth: place the proposal in its local setting

Hinckley and Bosworth council boundary
The inset locates Hinckley and Bosworth in Leicestershire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km

Local context · Hinckley · Burbage · Barwell · Market Bosworth · Groby · Ratby · Markfield · Earl Shilton

Enlarge map · Leicestershire locator
The inset locates Hinckley and Bosworth in Leicestershire. North is up. The scale bar applies to the main map.
Hinckley and Bosworth council boundary. The inset shows its position in Leicestershire. North is up. The scale bar applies to the main map.

The borough contains Hinckley, Burbage, Earl Shilton, Barwell, Market Bosworth, Groby, Ratby, Markfield and a wider network of smaller villages. Green links include farmland hedgerows, wooded and quarry-edge landscapes toward Markfield and Groby, heritage structures and parkland near Market Bosworth, and canal landscapes. These are landscape considerations, not a list of confirmed bat roosts or guaranteed protected habitats at every parcel. [1; 6; 10]

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

DM6 and the Hinckley & Bosworth framework

Current framework

The adopted framework still includes the Core Strategy (2009) and the Site Allocations and Development Management Policies Development Plan Document, adopted July 2016. DM6: Enhancement of Biodiversity and Geological Interest addresses retention, buffering and ecological function and must be read with other applicable development management policies. Check whether particular saved policies or made neighbourhood plans affect the parcel. Do not treat a county biodiversity strategy as if it replaced the borough’s statutory policies. [1]

The 2024–2045 replacement plan · Checked 23 November 2026

Checked 23 November 2026

The replacement Hinckley and Bosworth Local Plan 2024–2045 underwent a Regulation 19 pre-submission consultation from 7 August to 21 September 2026. That consultation is closed. The sources checked do not verify formal submission to the Planning Inspectorate or adoption as at 23 November 2026. A projected December submission date is a programme target, not a completed step. Keep the adopted and emerging plans visibly separate, particularly for large housing and employment sites. [2]

Validation for Hinckley & Bosworth projects

Supporting information

Leicestershire County Council offers ecological advice for several boroughs including Hinckley and Bosworth, while the council remains the LPA. Inspect its live validation list for bat survey triggers and assessment currency. For affected buildings, tree removal or habitat-lighting changes, provide enough site evidence at determination rather than asking a planning condition to cure an unknown fundamental impact. [5; 10]

Changes to hours, lighting and habitat use

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [10]

Local evidence / Practical design

Put the works and evidence on the same drawings

Define the proposal

Confirm the planning boundary, obtain the current borough validation requirements, then read 2009 Core Strategy and 2016 DPD policies alongside the site map. Identify the actual change to roofs, trees, field margins or lighting. Record all past ecological reports and their dates. Do not present a projected 2026 submission milestone as an adopted replacement plan. [1; 2]

Explain scope and limitations

A useful submission

A sound ecology statement normally records the proposal’s impact pathways: work to existing fabric, direct tree and vegetation change, indirect disturbance, night lighting and potential for habitat severance. It also identifies what was not surveyed, when the evidence was gathered and the assumptions made about access. If a report is more than a few seasons old or a design changes materially, seek professional advice on whether additional evidence is needed; there is no blanket statutory “bat report validity” period for every case. [10; 12]

Local evidence / Practical design

Lessons from local planning records

Fenny Drayton: operating hours can change the lighting question

Public record

The 2024 report for 24/00627/CONDIT concerns changing an operating-hours condition at a self-storage site west of Fenny Drayton. It considers lighting and vehicle access and includes advice to reduce disturbance to sensitive ecological features. This is a condition-variation example, not a confirmed licence or successful condition discharge. [4]

A later ecology document is still only a document lead

Practical interpretation

The register for 26/00518/FUL lists revised ecology incorporating bat-survey results and a later county ecology response. Without reading those underlying findings, it cannot support species, roost or approval claims. Keep report versions aligned with the current works and lighting plans. [3]

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

What survives along the Ashby Canal

The borough’s conservation area account identifies brick bridges, Hinckley Wharf and aqueducts at Shackerstone and Shenton. These are different types of structure. For repointing, record the joints and crevices that would be covered. For wharf lighting, draw the direction of emission and the hours the water-facing edge would be lit.

Hinckley and Bosworth’s Ashby Canal conservation area

Local evidence / Practical design

Bat records, local knowledge and habitat connections

What records can establish

The regional bat-group species accounts show that multiple species occur across Leicestershire and Rutland, but not how many live in Hinckley and Bosworth. Nor do they establish presence in a particular barn, quarry or school. The 2026 application register establishes only that a report containing bat survey results was submitted; the results themselves were not accessible in the material inspected. We cannot responsibly name species or provide numbers for that application. [3; 8]

A site-specific records search and appropriate fieldwork are needed for defensible ecology where protected species could be affected. No scientifically reliable district-level population or trend series was identified in the public sources reviewed. A single recording, bat box inspection or absence of records does not stand for the district’s population. [7; 10]

Nature recovery and current context

Scale matters

The Leicestershire, Leicester and Rutland LNRS, published August 2025, can inform broader habitat improvement along green corridors, field boundaries and wooded edges. It is not a substitute for DM6 or a licence. For an urban infill site, retained trees and nearby older buildings may be more relevant than an abstract 'county habitat corridor' label. [6; 1]

Leicestershire and Rutland Bat Group supplies regional recording and education opportunities. Its activities should be introduced with their real geography and dates; do not claim a bat walk on the other side of the county is original research proving a species in Market Bosworth. [8; 9]

Retain / Adapt / Assess the remaining effects

Explore design options before fixing the scope

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Hinckley and Bosworth design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Town-centre roof/fabric works

Sketch which parts of an industrial, retail or residential roof will be removed and where suitable crevices might be located. A preliminary inspection identifies potential and possible next steps; a confirmed roost requires a specific avoidance and legal route. Avoid making 'all industrial roofs low risk' assumptions. [10]

Groby, Markfield and woodland-edge schemes

Retain suitable mature trees, edges and connected hedgerows where feasible. Show existing and proposed nighttime lighting, including security, parking and temporary compound lights. Consider alternatives that reduce the impact footprint before commissioning additional monitoring. [13]

Market Bosworth and rural heritage conversions

Assess historic roofs and outbuildings in a way that is compatible with fabric and heritage constraints. Where feasible, preserving potential access and roost conditions can minimise disturbance. If a roost is verified, changes to roof insulation or ventilation may still be an impact; ask the ecologist to assess real construction methods. [10; 11]

Housing and access changes

Track revisions to red line, hedges, ecological buffers and tree removal. The application 26/00518/FUL illustrates why document dates and changes matter, even though its survey conclusions were not available for this review. [3]

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Local evidence / Practical design

Choose the evidence that answers your project question

Test the hours as well as the fitting

At a canalside business, obtain the existing closing time and the proposed last delivery time. Plot which lights operate during loading and which remain on for security. This distinguishes a brief movement-triggered exposure from a lit route running the length of the wharf all night.

Scope the right starting evidence

Start with a proportionate ecological risk appraisal: potentially suitable buildings can need a PRA, while changes to tree lines and lighting may lead to activity assessment. Further roost surveys, if justified, are constrained by method, season and weather. A report already submitted on a neighbouring project cannot simply be reused without evaluating site and proposal differences. [10; 12]

If roost impacts remain

Avoidance and legal route

If bats or a roost are established and impacts are possible, consider retention or alternative design before mitigation. Where a licence is required, it is a separate Natural England decision; obtaining planning permission does not extinguish species protection or guarantee licensing. [11]

Seasonal evidence

Plan justified emergence work around the roost question, season and appropriate coverage.

Bat emergence surveys

Trees and habitat

Review affected tree features, access and connected habitat together.

Bats in trees

Lighting design

Identify ecological receptors before choosing light positions, output and controls.

Bats and lighting

Local evidence / Practical design

Keep baseline and extended hours separate

If deliveries extend beyond dusk for the first time, a daytime photograph does not describe the new exposure. Ask for the delivery timetable, the security-light override and the expected duration of a loading event.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Hinckley and Bosworth bat survey questions

Which adopted policies apply?

The 2009 Core Strategy and July 2016 Development Management DPD, including biodiversity policy DM6. [1]

Do changes to opening hours matter for bats?

They can alter night-time lighting and activity. The Fenny Drayton report shows why operating arrangements deserve assessment alongside physical works. [4]

Does a listed bat report confirm a roost?

No. Read the report’s findings, methods and limitations. A document title alone cannot establish a roost or absence. [3]

Will a county ecology comment determine permission?

No. The borough planning authority makes the decision, considering appropriate evidence and advice. [5]

Are county bat group records a borough population figure?

No. Species lists and individual records are not standardised population counts. [8]

Do all brick bridges on the Ashby Canal need the same survey?

The structure and works decide that. Identify open joints, the part to be repaired and any access limits. A towpath lighting change with no masonry work raises a different question from grouting a bridge arch.

Local evidence / Practical design

Discuss your Hinckley and Bosworth project

Scope the change at Fenny Drayton or the canal

Supply existing and proposed closing times for a change-of-use case. For work on a canal structure, send a marked photograph of each face to be repaired and tell us when water-side access is available.

Discuss your proposal