Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Melton / Surveys · Design advice · Planning

Bat surveys in Melton

Melton’s rural conversions and transport schemes show why a bat assessment must describe the structure, its use and what the design will do to it. An update on a disused railway bridge changed the evidence about roost function even though the road design retained the bridge.

See the local planning examples

Discuss your Melton project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Melton: place the proposal in its local setting

Melton council boundary
The inset locates Melton in Leicestershire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km
Enlarge map · Leicestershire locator
The inset locates Melton in Leicestershire. North is up. The scale bar applies to the main map.
Melton council boundary. The inset shows its position in Leicestershire. North is up. The scale bar applies to the main map.

Melton Mowbray, Saxelby and the river approaches

The local authority determines the planning context; the feature affected by the work determines the initial ecological question. Melton Mowbray, Bottesford, Saxelby and rural settlements share a planning authority, but their building stock and habitats differ. Traditional stone and brick farm buildings, older roof timbers, stables, mature gardens and farmstead outbuildings can raise specific bat-roost questions. A building's age alone neither proves nor excludes occupation; the inspection records actual access points, signs and proposed fabric disturbance.

Local context · Melton Mowbray · Bottesford · Saxelby · village farmsteads · Eye and Wreake landscape

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Melton’s EN2 and EN3 policies

Current framework

Melton Local Plan 2011–2036 was adopted in October 2018. Policy EN2 addresses biodiversity and geodiversity; EN3 concerns green infrastructure. EN1, EN6 and EN13 may also be relevant to landscape character, building design or heritage in individual cases. Identify the correct mapped designation and statutory protections rather than attributing every policy to every agricultural proposal. [1]

Melton’s main modifications consultation

Checked 23 November 2026

The Melton Partial Update is at Main Modifications consultation, following September 2026 hearings. The consultation runs from 30 October to 14 December 2026. Proposed biodiversity and policies-map changes remain emerging. They do not replace the adopted plan until adoption. [2; 3]

Submitting ecological evidence in Melton

Supporting information

The council's online application guidance does not currently advertise a general local validation list. That is not a bat-survey exemption. An applicant must still supply the ecological information needed to assess reasonably foreseeable effects and the council may request specialist evidence. Check the application form, latest national validation requirements and the actual proposal; avoid inventing a Melton-specific bat checklist. [4] [7]

Survey evidence for a barn conversion

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [7]

Local evidence / Practical design

Melton Mowbray, Saxelby and the river approaches in the survey brief

Define the proposal

For a farmstead conversion, send the ecologist measured or annotated drawings, the schedule of roof or wall works, photos of accessible spaces and whether barns will remain open during construction. Agree how any discovered roost feature can be retained, with safe access for bats. If an emergence study is necessary, its scope follows the PRA findings and competent survey judgement. A planning application cannot treat a generic builder's method statement as a substitute for the assessment.

Assess the local connections

River Eye and River Wreake corridors, mature hedgerows, farm ponds and woodland edges can supply routes through the surrounding agricultural landscape. The fact that these features are present is a reason to check the development's effects, not evidence of a particular roost or species at the site. Where access widening or exterior lighting is proposed, the impact area may extend beyond the building footprint.

Local evidence / Practical design

Saxelby’s committee resolution and the Wilton Park appraisal

Saxelby: coordinate the conversion and ecology

The June 2026 committee record for 25/00845/FUL describes a dairy-building conversion previously deferred in May. The committee resolved to approve it with conditions. That resolution is a planning stage, not proof of a signed permission, protected-species licence or completed mitigation. [5]

A design lesson for rural buildings

Roof work, retained access, internal layout and the construction sequence need to be assessed together. Where evidence identifies a roost, explore ways to retain its function before finalising mitigation. Do not assume that a committee vote authorises disturbance. [7]

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Local evidence / Practical design

What changed when a Melton railway bridge was surveyed again

Leicestershire County Council’s ecology proof for the North and East Melton Mowbray Distributor Road describes a retained disused bridge. Earlier surveys recorded a small non-breeding common pipistrelle roost. Updated surveys identified a common pipistrelle maternity roost and a small non-breeding Daubenton’s roost. The witness considered effects unlikely with the bridge retained. Read that conclusion alongside the specific design and evidence.

Read the county council’s ecology proof, section 4.3

Melton's March 2026 biodiversity-duty reporting describes work at Melton Country Park and borough green infrastructure. Such habitat-management reporting can inform ecological design and public education. It is not a roost census and does not prove the presence of bats on an applicant's land. The current Main Modifications consultation is relevant because a decision taken after adoption may need an updated policy review. [6] [2]

Retain / Adapt / Assess the remaining effects

Rural conversions and the retained distributor-road bridge

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Melton design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Historic dairy or barn conversion

Survey the whole affected building, including gables, fascia, cavities and adjoining sheds. Redesign internal partitioning or roof repair methods where evidence supports keeping the occupied feature intact; do not promise that retaining one tile avoids licensing.

Access works beside mature hedgerows

Mark retained hedges and trees on the construction layout before finalising the turning circle, parking and visibility splays. Consider moving temporary compounds or utilities rather than clearing a potentially useful corridor without assessing it.

Roof replacement or insulation

Record exactly which roof elements will be opened and when. Where a roost is confirmed, discuss alternative techniques, access retention and lawful mitigation early; working at a different month alone does not waive legal protection.

Courtyard and rural lighting

Plot new luminaires, spill towards roost openings and vegetation, and automatic switching times. Reduce the need for lighting by altering entrance positions and movement routes before choosing specialist fittings.

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Local evidence / Practical design

Match the Saxelby roof drawings to the construction sequence

A dairy building can retain its walls while a new lining changes the void or the route behind a fascia. Mark which fabric stays in place at each stage. The ecologist can then compare retaining the original detail with any proposed replacement before the conversion drawings are finalised.

Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting

Local evidence / Practical design

Use the right evidence for a deferred Melton scheme

Following a deferral, keep the revised ecology information with the drawing set returned to committee. If the building or timing has changed again by tender, revisit the assumptions before stripping the roof. That prevents an earlier recommendation being applied to work the ecologist did not see.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Melton bat survey questions

Does a retained bridge ever need an updated survey?

Yes, if its use or the evidence needed for the works is uncertain. Melton’s road inquiry shows that a later survey can identify a different roost function.

What did the Saxelby committee agree?

It resolved to approve the dairy-building conversion with conditions. Read the formal decision for the conditions and check any separate licensing requirements.

Does a bat feeding by the river identify the building it came from?

No. Track what the observers actually saw and whether they had a view of a specific opening.

What should a dairy conversion drawing label?

Show retained timbers, roof lining, openings, scaffold and any permanent change inside the roof. Match references to the survey report.

Is Melton’s Partial Update already the adopted plan?

The main modifications consultation is a stage of the update. The council’s adoption record establishes when policies change.

Can a previous road-scheme survey stand in for my farm survey?

Use it to understand how evidence can change. The features and works on your farm require their own assessment.

Local evidence / Practical design

Discuss your Melton project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal