Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

North East Derbyshire / Surveys · Design advice · Planning

Bat surveys in North East Derbyshire

At Old Tupton, night surveys investigated a building assessed as moderately suitable for roosting bats. At Clay Cross, different parts of a regeneration scheme had different levels of access and survey coverage. These records help a project team decide which part of its own works still needs evidence.

See the local planning examples

Discuss your North East Derbyshire project

  • Local policy and public planning evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local context / Council boundary / Site-specific evidence

North East Derbyshire: locate the proposal and planning authority

North East Derbyshire council boundary
The inset locates North East Derbyshire in Derbyshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryPeak District National ParkScale bar · 5 km

Local context · Dronfield · Eckington · Killamarsh · Clay Cross · Wingerworth · Ashover · Wessington

Enlarge map · Derbyshire locator
North East Derbyshire council boundaryThe inset locates North East Derbyshire in Derbyshire. North is up. The scale bar applies to the main map.
North East Derbyshire council boundary. The inset shows its position in Derbyshire. North is up. The scale bar applies to the main map.

Clay Cross, Old Tupton and the National Park boundary

The district links eastern Sheffield-edge settlements with valleys and rural landscapes towards Ashover and Wessington. A proposed loft conversion in Dronfield, a demolition in Clay Cross and a barn conversion near Ashover raise different questions. In each case, the ecologist should look for credible roost access and effects, not assume that the town name predicts bat presence. [N-01; N-N07]

Map scope ONS December 2025 council boundary and county inset. Gold shows the National Park overlap from Natural England mapping. Place names are orientation labels, not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0. Park boundary © Natural England. National Parks (England) dataset.

Contains OS and National Statistics data © Crown copyright and database right 2025; Natural England data where shown. Open Government Licence v3.0. ACP cartography.

Older roofs, barns and industrial structures may have suitable crevices, but a suitable structure is not automatically occupied. Trees and hedgerows may have separate functions: a tree can have roost features, while a connected hedge may provide commuting habitat. Surveys and impact assessments should distinguish those roles because mitigation for one does not automatically protect the other. [N-N01; N-N03]

Local evidence / Practical design

Adopted policy, emerging plans and validation

North East Derbyshire’s SDC4 biodiversity policy

Current policy

The North East Derbyshire Local Plan 2014–2034 was adopted in November 2021. SDC4 Biodiversity and Geodiversity, SDC2 Trees, Woodlands and Hedgerows and SDC12 High Quality Design and Place Making are relevant. Check neighbourhood-plan coverage and the actual application boundary. [N-adoption; N-case]

The housing-target correction consultation

Checked 23 November 2026

The 2024–2044 Publication Draft consultation closed on 18 November 2026. A separate, focused consultation on the housing-target correction remains open until 2 December 2026. It does not extend the deadline for every part of the plan. Neither document is an adopted replacement plan. [N-03; N-04]

Validation and supporting information

Application requirements

Ask the council for its current application-specific validation checklist and any ecology request. Share roof and tree changes, demolition limits, access and lighting so the evidence can be scoped. Check the list linked by the council when preparing the application, rather than relying on a historic checklist or a standard survey package. [N-N01]

National Park policy

Separate decisions

The Park’s adopted 2011 Core Strategy and 2019 Development Management Policies include DMC11 on biodiversity. Its 2026–2045 draft consultation closed on 20 September 2026; the supplementary housing-policy consultation closed on 10 November. Neither consultation is adoption. [P-policy; P-review]

Local evidence / Practical design

How Old Tupton’s survey findings reached committee

Old Tupton: suitability and survey findings differ

The 9 December 2025 report for 25/00039/FL concerns demolition and two replacement dwellings. Paragraph 7.47 records August emergence-survey findings which did not identify roosting bats, despite the building’s moderate suitability. Precautionary working remained relevant. This is evidence about that investigation, not proof of permanent absence. [N-case]

A later committee resolution

The same meeting’s minutes record conditional approval, with final condition wording delegated. That verifies the committee stage; it does not establish that every condition was discharged or any licence obtained. Keep the survey, recommendation, resolution and final obligations separate when reviewing an older file. [N-minutes]

These examples are independent public records, not ACP projects. They do not establish bat presence or a guaranteed outcome at another site.

Local evidence / Practical design

Why Clay Cross needed two building briefs

In the 7 November 2023 officer report for NED/23/00601, paragraphs 7.84–7.88, Derbyshire Wildlife Trust distinguished Building A from the Clocktower. Two late-season visits to the community hub identified no roost, but internal access was unavailable. The consultee advised a peak-season update for Building A. Clocktower works were still undefined and outside the first phase. One result could not resolve the question for both structures.

Read the Town Deal’s separate account of the planning approval

The September 2025 Derbyshire Local Nature Recovery Strategy provides wider habitat priorities for the county and Derby. Use it to explore woodland, hedgerow and watercourse connections, then verify the actual site features. It is not a roost map or a replacement for the development plan. [N-N05]

Retain / Adapt / Check the remaining effects

Clay Cross phasing and Old Tupton demolition details

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the North East Derbyshire design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual design illustration. It shows questions to resolve, not a measured site, confirmed roost or approved mitigation scheme.

Demolition and replacement houses

Obtain a competent preliminary roost assessment in good time when suitable features exist. If further surveys are justified, incorporate their programme into the planning timetable rather than rely on a post-permission “check for bats” note. [N-N01; N-N04]

Industrial sites and quarry edges

Keep ecological baseline drawings and illumination plans coordinated. If survey results identify bat activity, examine retained foraging habitat and route continuity; do not imply it proves a roost in machinery buildings. [N-N01; N-N04]

Hedgerow and tree retention

Show actual canopy/root protection and construction access boundaries. Design around retained hedge gaps and dark edges before deciding that bat boxes or planting elsewhere fully resolve potential impacts. [N-N04]

Planning submissions during plan change

Cite the correct adopted policy, give draft proposals separate weight and recheck the local list and consultation position before filing. [N-01; N-02; N-03]

We proactively discuss whether changing the roof works, access, lighting or retained habitat could reduce an impact. Any decision to reduce survey work still needs a sound ecological basis. A design change does not automatically remove legal duties.

Local evidence / Practical design

Set the scope for an Old Tupton demolition

Ask which elevations were visible during the observations and which parts will come down first. The Old Tupton report separated potential identified in daylight from results of the August visits. If scaffolding, access or a new extension changes coverage, give the ecologist that information before agreeing the method.

Building assessment · Emergence surveys · Trees and bat features · Lighting and design

Local evidence / Practical design

Checking the Clay Cross phase plan

Identify the works that can proceed without affecting the deferred building, then check service runs, scaffold and compound lights against that boundary. A later phase on a drawing can still be affected by site preparation in the first phase. Record who will check those interfaces.

Local evidence / Practical design

What to book while access to a building is restricted

Identify who can provide safe access and which survey season the outstanding question needs. For a multi-building scheme, keep a separate entry for each structure. This allows the project manager to see whether a late survey affects the whole programme or only one package.

Survey season guidance · cost guide · methods, field forms and recording resources

Compact answers / Clear next steps

North East Derbyshire bat survey questions

Did the Old Tupton daytime assessment identify a roost?

It recorded moderate suitability. The officer’s account of later observations records no roosting bats identified during those visits.

Could the Clay Cross findings be transferred to the Clocktower?

The consultee treated it separately because the works and survey coverage differed. Read the assessment for the building actually being altered.

Why did the consultee advise a peak-season update?

The visits discussed for Building A were late in the active season and the interior could not be accessed. Those limits mattered to the advice.

Who deals with a site inside the Peak District National Park?

Check the National Park planning boundary at the red line. The district name or postcode alone does not determine the planning authority.

Did the correction consultation reopen the entire draft plan?

The council distinguished the housing-target correction from the main publication consultation. Use the notice for the subject and deadline.

What should the contractor receive for a phased demolition?

Give each structure a reference, an access restriction and a clear release point for work after outstanding ecology matters have been checked.

Local evidence / Practical design

Discuss your North East Derbyshire project

Send the details that change the scope

For Clay Cross or Old Tupton, send the phase plan, demolition schedule and any record of rooms or elevations that earlier surveyors could not see. Tell us when the first structure becomes inaccessible.

We can use those details to identify which building needs an update and whether phasing can keep another part of the project moving.

Discuss your proposal