Ravenstone: potential habitat needs investigation
The 6 May 2026 update for 26/00349/PIP records ecology advice about potential habitat around trees, ponds and hedges. No bat species, roost or consent outcome is inferred. [4]
North West Leicestershire / Surveys · Design advice · Planning
The public records for Hugglescote, Ravenstone and Osgathorpe show three different starting points for bat surveys. A house and its outbuildings, a new field access and a barn conversion each need a brief tied to the part of the site that will change.
See the local planning examples
Discuss your North West Leicestershire project
Tell us about your proposal
Local evidence / Practical design
Local context · Coalville · Ashby-de-la-Zouch · Castle Donington · Kegworth · Whitwick · Swannington
The local authority determines the planning context; the feature affected by the work determines the initial ecological question. Coalville, Ashby-de-la-Zouch, Castle Donington, Kegworth, Whitwick and Swannington occupy varied settings. An older farm building in the countryside presents different issues from a townhouse roof or a warehouse-edge hedgerow. A preliminary survey documents actual roost potential and its relationship to the works instead of projecting findings from another address.
Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.
Local evidence / Practical design
The council adopted its Local Plan in November 2017 and partly reviewed in March 2021. Policy En1 addresses nature conservation, En2 the River Mease Special Area of Conservation, En3 the National Forest and En4 Charnwood Forest. D1 addresses design. Use the adopted policy text and the site map to establish which applies; being within the district alone does not mean a site triggers every one of them. [1]
The council’s 18 November 2026 announcement confirms that it has agreed to submit the replacement Local Plan for independent examination. This is a decision to submit; it does not itself establish completed submission or adoption. Continue to distinguish the adopted plan from the emerging replacement. [2]
The planning application's species evidence should match the risk. For proposed demolition or roof opening, begin with an inspection of the whole affected structure. For access roads, retained trees, groundworks or lighting, show how the survey boundary follows the likely impact and connects to the design. A county ecology consultee response and the district planning decision are not the same document. [3] [6]
Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [6]
Local evidence / Practical design
At Moira, a former industrial plot may now adjoin established woodland. A new vehicle entrance at Ravenstone, for example, could break the shelter that a field boundary provides on an otherwise open site. By contrast, the question at Osgathorpe is whether a new roof covering would alter openings in the old fabric. These settings call for different drawings and different field observations.
Local evidence / Practical design
These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.
The 6 May 2026 update for 26/00349/PIP records ecology advice about potential habitat around trees, ponds and hedges. No bat species, roost or consent outcome is inferred. [4]
The officer discussion records bat-access and box proposals for barn conversion 24/01541/FUL. Treat this as a qualified document example, not proof of a licence, installed mitigation or successful use. Check the full record before relying on it for a new scheme. [5]
Local evidence / Practical design
The October 2024 planning committee pack discusses 115 Station Road and its outbuildings. It reports an August 2023 update, no identified roost across the surveys cited and low activity. The officer nevertheless recommended controlling external lighting. For another village infill plot, record where new fittings face as well as which parts of a building were accessible for inspection.
Read the Station Road officer assessment in the October committee pack
The National Forest and Charnwood Forest policies provide local habitat context. Check the actual mapped designation and any made neighbourhood plan for the site. A forest designation does not establish roost occupation. [1]
Retain / Adapt / Assess the remaining effects
Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.
Before removing roof coverings or blocking a gable, ask whether an occupied feature can be retained through the conversion. Consider whether a separate building or phased construction could reduce disturbance, subject to evidence.
Retain mature boundary trees where possible; treat a change from intermittent to overnight lighting as an ecological design change even if no building is demolished.
Survey ponds, ditch corridors, large trees and hedges affected by the access, not just the planned building. Shift the junction or temporary works area if a relevant feature can be avoided.
Coordinate water management and wildlife requirements separately. Sensitive lighting beside water or retained vegetation may be appropriate, but do not mislabel the SAC's principal conservation interest as a bat SAC.
Local evidence / Practical design
Start with the house and outbuildings scheduled for work. If the proposal also opens a gap in a hedge, take its width and retained canopy to the ecologist. A report about the roof cannot describe the consequences of a new access unless it also considers the boundary and the planned lighting.
Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting
Local evidence / Practical design
Compare the earlier inspection drawings with the present buildings. Note changes in roof condition, extensions or access, alongside the age and timing of the evidence. Commission an update that addresses the outstanding question. A previous report’s conclusion only makes sense with the features and works it assessed.
survey season guidance · survey cost guide · survey methods, field forms and recording resources
Compact answers / Clear next steps
The catchment raises separate water and designated-site questions. Assess bats from the affected building, trees, habitats and proposed works.
The officer considered surveys covering several years and still recommended a lighting control. Building evidence and external lighting served different purposes.
Read the scope of the permission-in-principle material. Layout, access geometry and lighting may need evidence at a later stage.
Identify the openings and roof ranges to be altered and any access points to retain. Tie each to a survey reference and a construction detail.
Check the council’s submission and examination record alongside the adopted plan. A decision to submit does not make replacement policies adopted.
Trace where new paths, fencing or light meet the trees. A historic industrial use tells you little about the habitat present today.
Local evidence / Practical design
Checked on 23 November 2026. Policy stages, consultation dates and case records may change. The guide distinguishes adopted policy, emerging proposals and the limits of public evidence. Read the relevant full source for a site-specific decision.
Local evidence / Practical design
Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.
We will discuss the ecological questions and possible avoidance options before recommending the next step.
See the Leicestershire county guide for wider landscape context and the England hub for the national route.
Our main bat survey service explains the process. Planning permission, habitat BNG and protected-species licensing remain distinct matters.