Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

South Derbyshire / Surveys · Design advice · Planning

Bat surveys in South Derbyshire

The stonework at Calke Abbey, the wetland edge at Willington and a condition-variation application at Dalbury Lees show three different ways bats can enter a South Derbyshire brief. Decide which feature is affected, what the public record actually establishes and what the next drawing must resolve.

See the local planning examples

Discuss your South Derbyshire project

  • Local policy and public planning evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local context / Council boundary / Site-specific evidence

South Derbyshire: locate the proposal and planning authority

South Derbyshire council boundary
The inset locates South Derbyshire in Derbyshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km
Enlarge map · Derbyshire locator
South Derbyshire council boundaryThe inset locates South Derbyshire in Derbyshire. North is up. The scale bar applies to the main map.
South Derbyshire council boundary. The inset shows its position in Derbyshire. North is up. The scale bar applies to the main map.

From the Trent valley to Calke and the rural villages

The district stretches from Swadlincote's older urban-industrial building stock to settlements around Melbourne, Repton, Etwall and Hilton. The River Trent and River Dove corridors, former pits, woodland fragments and field hedgerows give different contexts to a building survey and a wider habitat assessment. A canal or river label on a map is not a bat record; the ecologist must assess what the development could affect. [S-01; S-N07]

Local context · Swadlincote · Repton · Melbourne · Hilton · Etwall · Hatton · Trent and Dove landscape context

Map scope ONS December 2025 council boundary and county inset. Place names are orientation labels, not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025; Natural England data where shown. Open Government Licence v3.0. ACP cartography.

For a house extension, the primary bat question is often whether roof and wall features are disturbed. A preliminary inspection of a barn can identify accessible features and record where concealed spaces limit the assessment. For commercial redevelopments, demolition sequencing, retained trees, habitat edges and artificial lighting can create a wider impact pathway. [S-N01; S-N03]

Local evidence / Practical design

Adopted policy, emerging plans and validation

South Derbyshire’s two-part Local Plan

Current policy

Part 1 was adopted on 13 June 2016; Part 2 on 2 November 2017. The adopted Part 1’s BNE3 Biodiversity supports protection, enhancement, management and restoration of biodiversity. BNE4 addresses landscape character. Use the adopted wording and map; similarly numbered policies in a review may have different text. [S-01; S-adopted]

The replacement South Derbyshire plan

Checked 23 November 2026

The Part 1 Review 2022–2041 was submitted for examination on 26 August 2026. Separately, the Part 2 Review 2022–2042 is open for Regulation 19 representations until 5pm on 30 November 2026. Submission and consultation do not mean adoption. [S-02; S-03]

Validation and supporting information

Application requirements

The July 2024 supporting validation document, page 2, expressly addresses biodiversity and protected-species surveys. It includes possible effects from older-building demolition, roof works, vegetation removal and watercourse alterations. Supply evidence of likely impacts and proposed mitigation. An accepted application can still need further information during determination. [S-05]

Evidence before the decision

Separate decisions

Where effects on bats are reasonably likely, provide adequate evidence to inform the planning decision. A validation check does not guarantee ecological adequacy. Ask which uncertainty a requested survey will resolve; retaining a roof or habitat feature may change the assessment. [S-N01]

Local evidence / Practical design

The Black Fir Tree Farm variation and the Calke Abbey evidence

Dalbury Lees: a condition-variation record

The research located DMPA/2026/1355 concerning Black Fir Tree Farm and an earlier permission DMPA/2025/1416. The register entry describes proposed changes to conditions. It does not establish that a bat-related condition was removed or that a Natural England licence was issued. Check the original notice, proposed variation and final decision together. [S-06]

Design lesson: keep separate obligations visible

A planning condition, survey recommendation and protected-species licence serve different purposes. Changing drawings or applying to vary a condition does not itself remove wildlife-law duties. Agree who will check each obligation before roof strip-out, tree works or demolition. [S-N02]

These examples are independent public records, not ACP projects. They do not establish bat presence or a guaranteed outcome at another site.

Local evidence / Practical design

What Willington Wetlands can tell the design team

Derbyshire Wildlife Trust lists bats among the mammals using Willington Wetlands. The reserve includes open water and wetland habitats. For a development affecting an approach to the reserve, distinguish the water’s edge, intervening vegetation and any crossing. The reserve account gives landscape context, while the affected route needs its own evidence of when and how bats use it.

Read Derbyshire Wildlife Trust’s Willington Wetlands account

The September 2025 Derbyshire Local Nature Recovery Strategy provides wider habitat priorities for the county and Derby. Use it to explore woodland, hedgerow and watercourse connections, then verify the actual site features. It is not a roost map or a replacement for the development plan. [S-N05]

Retain / Adapt / Check the remaining effects

Dalbury Lees condition changes and Calke’s masonry details

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the South Derbyshire design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual design illustration. It shows questions to resolve, not a measured site, confirmed roost or approved mitigation scheme.

Barn and roof conversion

Identify access crevices and proposed loss of roof fabric before stripping. Commission a PRA when justified and align any emergence work with the competent ecologist's programme. [S-N01]

Commercial land beside old quarry or wooded margins

Retain meaningful vegetated links where possible and locate compounds, haul routes and security lights away from sensitive edges where evidence supports that. Make construction and operational lighting separately visible in plans. [S-N04]

Water-connected sites around Hilton

Use existing habitat and any collected bat activity data to shape dark corridors. [S-N01; S-N04]

Consent and licence administration

Check conditions and Natural England licensing before any activity that could harm a protected roost. [S-N01; S-N04]

We proactively discuss whether changing the roof works, access, lighting or retained habitat could reduce an impact. Any decision to reduce survey work still needs a sound ecological basis. A design change does not automatically remove legal duties.

Local evidence / Practical design

Compare a Dalbury Lees variation with the original works

Put the original conditions and approved drawings beside the proposed revisions. Identify exactly which wording or detail would change. A variation application reference does not establish that bat-related controls have been removed. The ecologist needs the current works schedule before advising on survey, method or licensing.

Building assessment · Emergence surveys · Trees and bat features · Lighting and design

Local evidence / Practical design

Keep the approach to a Calke-type masonry feature dark

When specifying repairs, mark the work area and scaffold lights as well as permanent fittings. A night-time observation at a building can depend on a particular window or masonry junction. Avoid substituting an elevation-wide assumption for the specific detail the observations concern.

Local evidence / Practical design

Schedule the survey around the actual South Derbyshire operation

For works at the edge of a wetland, identify when tree clearance, access and lighting begin. For a building repair, identify when the vulnerable fabric first becomes inaccessible. These may be earlier than the advertised construction start, so agree the ecology decision points with the contractor.

Survey season guidance · cost guide · methods, field forms and recording resources

Compact answers / Clear next steps

South Derbyshire bat survey questions

Does a variation application remove a bat condition?

Only the recorded decision and revised condition wording establish what changed. Read the original permission alongside them.

Does the Willington reserve account give the species on my site?

It records bats at the reserve, without establishing the species, numbers or roosts relevant to a neighbouring proposal.

How should I show a proposed change to a historic window?

Provide a labelled elevation and section covering the frame, adjoining masonry, access and temporary scaffold. Identify the part already assessed.

Which South Derbyshire plan documents are adopted?

Parts 1 and 2 of the existing local plan form the starting point. The Part 1 examination and Part 2 publication consultation are separate review stages.

Does a River Mease assessment answer a bat question?

It considers designated-site interests and pathways. Separately assess affected buildings, trees and routes used by bats.

What is useful about the Calke Abbey observation?

It shows that protected use can relate to a precise part of stonework. Its survey result cannot be transferred to another historic property.

Local evidence / Practical design

Discuss your South Derbyshire project

Send the details that change the scope

For a farm variation, send the earlier decision, approved drawings and proposed changes together. For Willington waterside work, add the bank and access plan with the lighting or clearance dates.

This lets us distinguish a change to the planning record from a change that could affect the bat assessment or the construction sequence.

Discuss your proposal