Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Regional field guide · South West England

Biodiversity Net Gain in South West England

Plan for the right habitats, council requirements and delivery route.

Biodiversity net gain in South West England starts with the site’s ecology and planning context. From a Cornish hedge to a Bristol infill site or Somerset wetland, the evidence should shape the design and long-term management.

South West atlas

Find your council and nature recovery strategy

Select a numbered area or use the text index. The seven Local Nature Recovery Strategies (LNRS) cover the region’s 27 district, borough, unitary and island councils. Check the national park boundary as well as the council.

Simplified strategy boundaries © Natural England 2024. Contains OS data © Crown copyright and database right 2024. Boundary data · Open Government Licence v3.0.

AREA 01

Cornwall and the Isles of Scilly

Truro, Falmouth, St Austell, Penzance and St Mary’s

Cornwall Council decides mainland applications. The Council of the Isles of Scilly is the island planning authority. Use the appropriate Local Plan even though the two areas share one nature recovery strategy.

Published LNRS · March 2025
Cornwall Council

The strategy links the existing nature network with opportunity areas. On the mainland, trace Cornish hedges and wooded valleys. On Scilly, check coastal exposure, island habitats and the practical access needed for long-term management.

Planning council directory (2)

Cornwall · Isles of Scilly.

Strategy, priorities and maps

AREA 02

Devon

Exeter, Plymouth, Torquay, Barnstaple and Tiverton

Plymouth and Torbay are unitary councils. Elsewhere, use the district for ordinary development, subject to Dartmoor or Exmoor boundaries. Devon County Council handles separate county planning functions.

Published LNRS · May 2026
Devon County Council

Use the Viewer’s High Opportunity Areas alongside its habitat layers. Culm grassland, hedge corridors, wooded valleys and wetland mosaics need different grazing, cutting and water regimes. Ground-check soils before selecting a habitat target.

Planning council directory (10)

East Devon · Exeter · Mid Devon · North Devon · South Hams · Teignbridge · Torridge · West Devon · Plymouth · Torbay.

Strategy, priorities and maps · Open the habitat map

AREA 03

Dorset

Dorchester, Weymouth, Bournemouth, Christchurch and Poole

Dorset Council and BCP Council are separate unitary planning authorities. Dorset still uses several inherited Local Plans. Identify the former plan area as well as the current council.

Published LNRS · December 2025
Dorset Council

The strategy covers heathland, grassland, woodland, rivers, wetlands and the coast. Around Poole Harbour, establish water-quality and recreation constraints early. Along chalk streams, check the riparian corridor and hydrology.

Planning council directory (2)

Dorset · Bournemouth, Christchurch and Poole.

Strategy, priorities and maps

AREA 04

Gloucestershire

Gloucester, Cheltenham, Stroud, Cirencester and Tewkesbury

Six district and borough councils handle ordinary planning applications. For the Gloucester–Cheltenham–Tewkesbury growth area, read the Joint Core Strategy alongside the relevant district plan.

Published LNRS · 13 February 2026
Gloucestershire County Council

Match a Potential Measure from the strategy to its mapped location. The Severn floodplain, Forest of Dean and Cotswold limestone grasslands call for different interventions. Check whether the proposal joins existing habitat or creates an isolated parcel.

Planning council directory (6)

Cheltenham · Cotswold · Forest of Dean · Gloucester · Stroud · Tewkesbury.

Strategy, priorities and maps · Open the habitat map

AREA 05

Somerset

Taunton, Bridgwater, Yeovil, Frome and Wells

Somerset Council replaced the county and four district councils in April 2023. Their adopted plan policies still require checking. Exmoor has its own planning authority, and North Somerset belongs to the neighbouring strategy below.

Published LNRS · 26 March 2026
Somerset Council

Read the Local Habitat Map with the council’s strategic-significance guidance. On the Levels and Moors, ditch networks, water levels and grazing can determine success. Around the Mendips, consider limestone grassland and links between wooded bat-foraging areas.

Planning council directory (1)

Somerset.

Strategy, priorities and maps

AREA 06

West of England

Bristol, Bath, Weston-super-Mare, Yate and Keynsham

The strategy covers all four councils, including North Somerset. Each council decides its own applications. Around the Bristol fringe, check the boundary before relying on the city’s policies or validation list.

Published LNRS · 7 November 2024
West of England Mayoral Combined Authority

Use the Toolkit’s Focus Areas for Nature Recovery to identify relevant measures. In the Avon valley and Severn Estuary hinterland, consider wetland connections. In built-up areas, show how trees, green roofs and habitat links survive access and maintenance needs.

Planning council directory (4)

Bath and North East Somerset · Bristol · North Somerset · South Gloucestershire.

Strategy, priorities and maps · Open the habitat map

AREA 07

Wiltshire and Swindon

Salisbury, Trowbridge, Chippenham and Swindon

Wiltshire and Swindon have separate unitary councils and development plans. A small part of south-east Wiltshire falls within the New Forest National Park, where the park authority has planning powers.

Published LNRS · October 2025
Wiltshire Council

Read the Mapped Measures layer as well as the important-habitat and opportunity layers. Chalk grassland and the Salisbury Avon catchment need careful soil and water evidence. Around Swindon, look for links through fragmented urban and farmland habitats.

Planning council directory (2)

Wiltshire · Swindon.

Strategy, priorities and maps · Open the habitat map

Use the red-line boundary to confirm the deciding authority. Find your council by postcode · Check the national LNRS register.

Planning geography

Check the authority behind the place name

Postal addresses and county names can span different planning systems. County councils also retain functions for minerals, waste and certain county developments.

National park boundaries

Dartmoor has its own planning authority within Devon. Exmoor spans Devon and Somerset. The New Forest includes a small part of Wiltshire. Their development plans apply inside the park boundaries.

Check the park’s map before choosing a validation list. Dartmoor · Exmoor · New Forest.

Growth areas and inherited plans

At the Bristol fringe, a short move can change the council and Local Plan. At Taunton’s Firepool regeneration area, the council describes an approach to BNG across the whole site. Phase boundaries therefore need to connect to a coherent habitat strategy.

For major regeneration, establish the full baseline and phasing assumptions before splitting the project into applications. Firepool project information.

Reorganisation update, 29 October 2026. The government withdrew its earlier Devon, Plymouth and Torbay decision for further review. For Gloucestershire, it issued a minded-to decision for one unitary council, subject to further legal steps. Use the current councils listed above for today’s submission. Devon update · Gloucestershire update.

National requirements

How biodiversity net gain works in the South West

For ordinary planning permission within scope, Schedule 7A to the Town and Country Planning Act 1990 requires at least 10% gain. Use the statutory biodiversity metric to measure the habitat baseline and proposed outcome.

Confirm which rules apply

Applications made from 6 August 2026 can qualify for the new exemption for sites of 0.2 hectares or less, subject to the priority-habitat test. A separate exemption covers wholly temporary development permitted for five years or less. Check the whole red-line area and any existing permission.

Householder and other exemptions have their own tests. For new applications, self-build status alone no longer establishes an exemption. Check the current exemptions · ACP exemption guidance.

Follow the applicable gain hierarchy

For major schemes, address harm to higher-distinctiveness habitat before considering on-site enhancement, habitat creation and registered off-site gains. For qualifying non-major applications made from 6 August 2026, on-site and off-site delivery sit at the same level of preference. Statutory credits are the final option.

Earlier applications and section 73 variations can follow transitional rules. Record the application date and original permission in the BNG strategy. Planning practice guidance.

Secure delivery before work begins

The authority normally approves the Biodiversity Gain Plan after permission and before development starts. Significant on-site enhancements and registered off-site gains require at least 30 years of management. Phased permissions need an overall strategy and relevant phase plans.

Nationally significant infrastructure applications submitted from 2 November 2026 follow their development consent regime and relevant biodiversity gain statement. Infrastructure and register guidance · Biodiversity Gain Plan support.

Adopted policy and emerging plans

Local policies that shape a South West BNG proposal

Use the development plan for the site alongside current legislation. The examples below show how requirements for canopy, habitat networks and protected sites influence the layout.

Cornwall · canopy and nature networks

The Climate Emergency DPD, adopted in February 2023, includes G2 on BNG, G3 on canopy and G4 on the Local Nature Recovery Network. G1 covers green infrastructure design and maintenance.

Allow room for viable tree growth and explain connections to the mapped nature network. Assess the canopy calculation alongside the habitat metric. Read G1–G4 (PDF).

Bath and North East Somerset · delivery commitments

Policy NE3a entered the adopted Local Plan Partial Update in January 2023. The council’s current guidance incorporates the August 2026 exemptions. Section 3.6 of its 2026 Planning Obligations SPD explains BNG delivery and links to LNRS measures.

Show who will manage the proposed habitat, how it will be secured and which local recovery measures it supports. NE3a and current BNG guidance · Planning Obligations SPD (PDF).

Plymouth and South West Devon · connected habitats

DEV26 in the 2019 Joint Local Plan covers biodiversity and geological conservation. It expects net gains to support the biodiversity network linking Plymouth with the countryside and coast. South Hams and West Devon share this plan area, outside Dartmoor.

Explain how retained hedges, woodland edges and watercourses connect across the scheme. Test lighting and access against those connections. Read DEV26.

Dorset · identify the inherited plan

Dorset Council continues to use inherited Local Plans. In Purbeck, the July 2024 plan uses E10 for biodiversity, E7 for protected sites, E8 for heathlands and E9 for Poole Harbour. BCP has its own planning framework.

Check the plan map and relevant habitat mitigation requirements before fixing development capacity. A positive habitat metric still needs compatible protected-site evidence. Purbeck E7–E10 (PDF) · Find the applicable Dorset plan.

Gloucester · urban nature recovery

The City Plan adopted in January 2023 uses E1 for biodiversity, E2 for the Nature Recovery Area and E3 for green and blue infrastructure. E7 addresses trees, woodland and hedgerows. Read it with Joint Core Strategy SD9.

Map the proposed links to the city’s Nature Recovery Area. Also screen recreation effects on the Cotswold Beechwoods under E6 where relevant. Read the adopted City Plan (PDF).

Somerset · local evidence at validation

The council’s BNG validation addendum dates from February 2024. Its guidance includes a local definition of significant on-site gains. In the former Mendip area, inherited policy DP5 addresses biodiversity and ecological networks.

Use the applicable inherited plan and submit the council’s BNG statement, metric, drawings and other triggered evidence. Somerset guidance and templates · Mendip DP5.

Wiltshire · adopted and withdrawn policy

The adopted Core Strategy includes CP50 on biodiversity and CP52 on green infrastructure. The council resolved to withdraw its replacement Local Plan in May 2026, and that examination closed.

Use the adopted policy and check the current plan programme before citing a replacement policy. Swindon has a separate plan. Wiltshire Core Strategy · Current Local Plan programme.

National parks · enhancement within protected landscapes

Dartmoor’s 2021 plan includes strategic policy 2.3 on BNG, alongside 2.2 on biodiversity protection and 2.5 on water. Exmoor’s CE-S3 and CE-D2 address biodiversity and green infrastructure. In the New Forest, check SP5 and SP6.

Assess the ecological and landscape effects of the intervention itself. New planting, fences, access and altered drainage all need a workable location. Dartmoor policies · Exmoor policies · New Forest policies.

Bristol’s next changes. The council reports that the 2022–2040 plan remains at an advanced examination stage, with adoption expected in late 2026. Its separate 2045 plan timetable schedules consultation from 1 December 2026 to 7 February 2027. Check the live programme when preparing a submission. Current plan status · 2045 plan timetable.

From mapped priority to metric

Use the LNRS to explain the habitat choice

All seven strategies are published. A mapped priority helps explain where an intervention could contribute to nature recovery. The survey, soil conditions and proposed management establish whether it can work on the parcel.

Read the measure

Open the habitat map and the associated written priority. Record the layer, location, measure and version used. A coloured polygon alone does not explain the proposed action.

Test the ground

Check existing vegetation, soils, water levels and surrounding habitat. Devon’s guidance explicitly calls for ground-checking because mapping can be incomplete or out of date.

Document the score

Use the statutory metric’s rules for strategic significance and the authority’s published guidance. Explain the evidence for each score and check that the proposed habitat delivers the relevant measure.

Statutory metric tools · Devon strategy · Somerset strategic-significance guidance

Moving into delivery. Somerset’s LNRS Community Seed Fund opened on 26 October 2026, with a published closing date of 11 January 2027. Landowners and community groups can check its eligibility and funding conditions alongside their wider recovery plans. Somerset funding and delivery updates.

Ecological character

Let soils, water and connectivity shape the design

The South West’s habitat variety creates different opportunities and constraints. Use these regional patterns to guide the investigation, then confirm what actually occurs on the site.

Hedges, woodland and working farmland

Cornish hedges, Devon hedge banks and ancient wooded valleys can hold mature trees, old soils and connected species habitat. Record the hedge structure, associated ditch or bank, and links beyond the red line.

Retain viable connections through access design and construction buffers. Plan management for the whole feature and use the correct metric category. Baseline habitat assessment.

Culm, chalk and limestone grassland

Wet Culm landscapes in Devon differ from the chalk of Wiltshire and Dorset or Cotswold limestone grasslands. Species composition and soil fertility influence whether restoration is realistic.

A proposed seed mix needs a compatible substrate, cutting or grazing regime and establishment plan. Check the evidence behind the target condition. Habitat condition assessment guidance.

Levels, moors, rivers and estuaries

Somerset’s wetland networks and the region’s river valleys depend on water management. Coastal projects around the Severn, Poole, Exe and Fal–Helford systems also need to account for tidal processes and designated sites.

Align BNG proposals with drainage, water-quality evidence and relevant consents. Check area, hedgerow and watercourse unit shortfalls separately. River condition assessment.

Brownfield and urban habitats

Bristol, Plymouth and the region’s regeneration sites can contain valuable habitat mosaics alongside buildings and hardstanding. Survey the vegetation and substrate before assigning the baseline.

Design green roofs, trees and planted areas around light, rooting space, access and maintenance. Show how habitat will remain viable once people occupy the development. Habitat management and monitoring plans.

Submission and delivery

The evidence to prepare at each stage

For South West BNG assessments, start while the layout and drainage can still change. A consistent red line, habitat plan and metric reduce avoidable queries.

Carry one clear evidence trail through the project

Somerset’s published list includes a wildlife survey, biodiversity checklist, BNG statement, metric and drawings. Arboricultural evidence and its SHEP/HEP metric apply where triggered. Check the full local list · Cornwall’s updated 2026 guide.

  1. 01

    At application

    Confirm whether the biodiversity gain condition applies. Where required, provide the pre-development value, statutory metric and scaled habitat plan. Record the baseline date, irreplaceable habitat and any previous clearance. Include the local authority’s additional validation evidence.

  2. 02

    Before choosing off-site units

    Resolve the habitat types, trading rules and spatial adjustment in the metric. Check the delivery site, legal security and allocation process before relying on a supplier quotation. Identify who will provide the register evidence.

  3. 03

    Before commencement

    Submit the Biodiversity Gain Plan and supporting documents against the approved design. Reconcile the metric, secured land, off-site allocations and any statutory credit evidence. Confirm management responsibilities and reporting dates.

  4. 04

    During the management period

    Track establishment and habitat condition against the agreed plan. Keep photographs, survey results and management records. Specify remedial actions and who pays for them if the agreed condition is missed.

For the detailed submission process, use the planning validation checklist and BNG process guide.

Off-site delivery

Registered South West habitat banks to investigate

These named examples have public register entries and operator information. A register entry shows secured habitat and recorded allocations. Obtain a current quotation and availability confirmation for your required unit type.

Exeter Habitat Bank · Devon

Natural England’s record BGS-080324001 covers a 3.2-hectare gain site in the Exeter authority area. Planned habitat includes lowland meadow, mixed scrub and hedgerows. Provider coverage can change. Confirm that any quotation relates to this registered site and the required habitat.

Useful for checking a meadow or hedge shortfall against Devon Redlands and the deciding authority. Review the spatial-risk calculation for your own site. Register and allocations · Provider information; confirm site coverage.

Lower Chew Forest · Compton Dando

Avon Needs Trees’ scheme appears as BGS-301025002 in Bath and North East Somerset. The registered gain site is 78.91 hectares and includes a mix of grassland, scrub, trees and hedgerows. Review each habitat category in the register.

The wider forest project and the registered gain parcel have different boundaries. Use the registered plan when assessing an allocation. Registered parcel and habitats · Provider information; confirm site coverage.

Lesnewth Habitat Bank · north Cornwall

Biofarm’s Lesnewth scheme is recorded as BGS-221025001, covering 26.99 hectares. The register records habitat improvement and a responsible-body arrangement. The operator describes a project linking grassland, hedges and woodland habitat.

Check the current habitat schedule and allocation status before matching a Cornish development shortfall. Confirm the contracting party and secured management arrangements. Register and legal record · Provider information; confirm site coverage.

Location affects the quantity required. The statutory metric applies spatial-risk rules. For area habitats, the same planning authority or National Character Area can affect the multiplier. Hedgerows and watercourses have their own rules, including relevant catchment tests. Run the correct module before comparing quotations. Read the metric user guide · Off-site biodiversity unit guidance.

Project budget

Separate assessment, units and long-term delivery costs

There is no single South West BNG tariff. The council, habitat type, shortfall, site conditions and legal arrangement all affect the budget. The public examples below were checked for this review.

Council monitoring · Cornwall

Cornwall’s published BNG schedule lists £5,845 for on-site provision associated with 10–49 dwellings. It lists £8,544 for on-site provision for 50 or more dwellings, or off-site provision of up to 10 hectares. Larger off-site areas use higher bands or a bespoke fee.

These charges fund the council’s monitoring role. Budget separately for carrying out habitat management, surveys and any remedial works. Confirm the applicable band and indexation when agreeing terms. Current monitoring fee schedule.

Setting up a habitat bank · Cornwall

The council lists £381 for an initial habitat-bank submission and £119 per hour thereafter, including VAT. Its process also requires the promoter to meet legal costs and arrange registration with Natural England.

For illustration, the initial submission plus five further chargeable hours totals £976. This covers only those processing items. Add the separately agreed legal, registration and monitoring costs. Habitat-bank process and charges.

Buying units · obtain comparable quotations

Ask each supplier for the habitat type, quantity, spatial adjustment, registration reference, allocation cost and VAT treatment. Keep area, hedge and watercourse units separate. The three operator pages above provide enquiry routes.

A comparison should include management and legal security, alongside the price. Allow for any reservation period or condition attached to availability. BNG costs and pricing guide · Units and statutory credits explained.

Statutory credits and other mitigation

Government statutory credits use a published habitat-tier price schedule and an additional spatial-risk requirement. They are a last-resort route. Nutrient mitigation, recreational mitigation and biodiversity units also have distinct accounting requirements.

For proposals combining environmental payments, document additionality and the delivery obligations attached to each payment. Statutory credit price schedule · Combining BNG and nutrient mitigation.

Recorded projects and research

What the public evidence shows in practice

These examples illustrate different parts of delivery. Their records can help an applicant decide what evidence to request and which assumptions to test.

Bath recycling centre

B&NES recorded a permit for Locksbrook Road recycling centre, application 24/03168/REG03, on 9 April 2025. The Lower Chew Forest register records 0.17 area units allocated to that project. This is one recorded allocation, with the overall scheme governed by its approved documents.

Track the permission and gain-site allocation as distinct records. Council decision (PDF) · Recorded allocation.

Lower Otter restoration

The Environment Agency reported the project’s completion in March 2024, with around 55 hectares of wetland habitat. Reconnecting the river, estuary and floodplain required changes to infrastructure and public access as well as habitat work.

For a wetland proposal, assess hydrology, access and neighbouring infrastructure together. This is a landscape-restoration example. Environment Agency project account.

Devon wetland research

University of Exeter and Devon Wildlife Trust research followed beaver wetlands over ten years. It reported water storage and benefits for slowing flow. The response depends on the catchment, landform and intervention.

Use monitoring to test water-related assumptions in a habitat plan. Ecological evidence should support the target condition and management approach. Read the university research account.

Technical support

Choose the next step for your South West site

ACP’s BNG consultants can connect the habitat survey, statutory metric and planning evidence with a deliverable management strategy.

Start with the baseline

Share the red line, planning history and current layout for a BNG assessment and habitat survey. Include any council request so the scope addresses it.

Resolve a delivery shortfall

Use the metric to compare feasible design changes and off-site unit options. Then identify the legal agreement and long-term responsibilities.

Regional questions

South West BNG questions

For site-specific advice, include the council’s request when you discuss your project.

Which council deals with BNG in the South West?

Usually the district, borough or unitary council for the development site. The Isles of Scilly has its own council. National park boundaries and county planning functions can change the route. Use the directory and confirm the red line against the authority map.

Does one nature recovery strategy cover the whole region?

Seven published strategies cover the South West. Cornwall and the Isles of Scilly share a strategy. The West of England strategy includes North Somerset, while Somerset Council has its own. Each mapped measure needs to be read with the relevant written priority.

Can I buy units in a neighbouring county?

A cross-boundary allocation can be possible. The habitat must satisfy the metric’s trading rules and spatial adjustment, and the gain must be secured, registered and allocated. Compare the adjusted quantity required for the actual development and gain-site locations.

Does a Somerset wetland project also solve nutrient mitigation?

Check each requirement and the payment rules separately. A project may combine compatible outcomes, but the habitat metric, nutrient calculation, additionality and legal obligations each need appropriate evidence. Agree the approach with the relevant authority before relying on it.

Are small South West sites exempt after August 2026?

For applications made from 6 August 2026, a site of 0.2 hectares or less may qualify, subject to the priority-habitat test. Other exemptions and transitional rules also matter. Measure the red-line site and check the current government guidance.

What should I send for an initial BNG enquiry?

Send the site address and red-line plan, proposed layout, application date and any planning conditions or ecology reports. Add known drainage proposals and likely programme dates. These help establish the survey, metric and delivery work required.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.

Field guide / source notes

Regional evidence

Reviewed by ACP Consultants

National framework and local planning

Nature recovery strategies and mapping

Gain sites, costs and delivery evidence