Selston: put ecology into the build sequence
The 19 March 2025 committee record for V/2024/0329 describes integrated bat features, construction ecology measures and lighting controls for nine dwellings. These are proposed safeguards and enhancement measures, not a report of an occupied roost. A signed notice and completed installation have not been verified. [5]