Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Ashfield / Surveys · Design advice · Planning

Bat surveys in Ashfield

The daytime survey at the Mill Adventure Base beside King’s Mill Reservoir illustrates a useful distinction for Ashfield. A building by water may have very little suitable roost space, while the vegetation between it and the reservoir still matters for feeding bats. The works drawing should let the ecologist assess both.

See the local planning examples

Discuss your Ashfield project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Ashfield: place the proposal in its local setting

Ashfield council boundary
The inset locates Ashfield in Nottinghamshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km
Enlarge map · Nottinghamshire locator
The inset locates Ashfield in Nottinghamshire. North is up. The scale bar applies to the main map.
Ashfield council boundary. The inset shows its position in Nottinghamshire. North is up. The scale bar applies to the main map.

King’s Mill Reservoir, former colliery land and Ashfield’s towns

Ashfield District Council handles most planning applications within Hucknall, Kirkby-in-Ashfield, Sutton-in-Ashfield, Selston, Annesley and Jacksdale. Adjacent Nottingham City, Broxtowe and Mansfield use different planning documents. A Hucknall postcode is not enough to determine the authority; identify the exact red-line boundary first.

Local context · Hucknall · Kirkby-in-Ashfield · Sutton-in-Ashfield · Selston · Annesley / former industrial land

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Which saved Ashfield policies apply?

Current framework

The operative development plan still includes relevant saved policies from Ashfield Local Plan Review, adopted 22 November 2002. The council's current development-plan page lists saved environment policies EV1, EV2, EV4, EV5, EV6, EV8, EV10, EV11 and EV14, as well as made neighbourhood plans. Not all 2002 policies survive or carry equal weight against national policy; use the current saved list and site-specific policy map. [1]

What the inspectors reported on 24 November

Reviewed 26 November 2026

Ashfield published the inspectors’ report on 24 November 2026. The inspectors found the 2023–2040 plan sound with their main modifications. Full Council still had to consider adoption. Check the council’s adoption statement before treating the new plan as operative. [2; 3]

Evidence for Ashfield’s full and major applications

Supporting information

The council links adopted 2025 validation lists. Its full and major applications document requires ecology/protected-species evidence where development could affect relevant species or habitats. It calls for competent surveyors, suitable timing and weather, and recognised methods. BNG paperwork remains a separate requirement. [4; 14]

Sequencing ecology measures at Selston

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [6]

Local evidence / Practical design

One works site can contain a poor roost feature and useful feeding habitat

By King’s Mill Reservoir, the building survey examined the envelope of a single-storey structure. Outside, the land between the building and the water offered different habitat. At Brierley Forest Park the woodland and grassland edges are the starting point. Decide whether the proposal affects a building, a flight route or both.

Local evidence / Practical design

Selston: timing lighting controls and integrated bat features

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Selston: put ecology into the build sequence

The 19 March 2025 committee record for V/2024/0329 describes integrated bat features, construction ecology measures and lighting controls for nine dwellings. These are proposed safeguards and enhancement measures, not a report of an occupied roost. A signed notice and completed installation have not been verified. [5]

Apply the lesson to access and retained habitat

For a new Ashfield scheme, show the access, vegetation clearance, temporary compounds and permanent lights together. Explain which ecological measure addresses each effect and when it must happen. A generic bat box specification cannot substitute for understanding a roost impact. [5; 6]

Local evidence / Practical design

Mill Adventure Base: what a daylight inspection could resolve

The historic daytime report describes a sheet-metal roof and its junctions at the Mill Adventure Base. During the inspection, the ecologist found no evidence of roosting bats and assessed the building as lacking suitable roost features. The report also identified the importance of trees and scrub towards the reservoir. Its conclusion about the building is evidence for those inspected works at that time.

Mill Adventure Base daytime bat survey, Nottinghamshire County Council planning file

Retain / Adapt / Assess the remaining effects

Planning Ashfield roof works and access to former industrial land

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Ashfield design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Hucknall roof extension

Before removing soffits, loft boarding or gable tiles, inspect all impacted features and plan any necessary seasonal surveys; retaining access may be an alternative to major roof reconstruction.

Show the exact roof surfaces and internal spaces that will change. Include insulation, access and exterior lighting in the brief. This helps distinguish a limited repair from work that changes the function of the whole roof.

Selston small housing scheme

Record how the proposed vehicular access affects mature hedges and trees. Change turning circles, light positions or construction compounds where evidence supports protecting the corridor.

Coordinate the ecology and landscape drawings with the construction sequence. Specify who maintains retained features and when enhancement is installed. A planning condition needs an achievable implementation detail, not a symbol added after the layout is settled.

Kirkby former industrial land

Survey neglected structures, voids and nearby tree belts before demolition; also assess new overnight security lighting along retained vegetation, not only the central development footprint.

Sutton garden infill

Keep suitable mature trees where feasible; distinguish protected-species mitigation from generic BNG planting and long-term habitat management.

Local evidence / Practical design

When do Ashfield building works raise a second habitat question?

A like-for-like panel replacement can have a narrower footprint than a refurbishment with a new loading area or security light. Mark the extra works before relying on the roof inspection. For a waterside yard the key new question may be spill on a flight route.

Survey guides: Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Checking spill between an activity building and the reservoir

Show the height of the light relative to the bank and whether trees screen it in winter. If visitors leave after dusk, compare a switched, directed fitting at the exit with lighting the whole waterside approach. Identify the surface that needs light and the vegetation that needs shelter.

Local evidence / Practical design

What changes would invalidate a narrow building brief?

Recheck the scope if the design adds tree clearance, over-water works or evening lighting. At a Selston housing scheme, ecological conditions may also affect construction timing. Include the clearance limits and the stage at which any integrated features must be fitted so instructions reach the right trade.

Further reading: survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Ashfield bat survey questions

Did the historical Mill Adventure Base report rule out bats at the reservoir?

No. Its conclusion concerned roost suitability and signs in the inspected building. The surrounding trees and water provide a separate habitat question.

Why did the survey describe the edge trim on a metal roof?

The junction between materials can create or exclude access to concealed spaces. The relevant evidence is the detail and condition on site.

Can that inspection be used for work there today?

Use it as a historic baseline. Check alterations, deterioration, the present works and current habitat before deciding what can still be relied upon.

What does a bat feature on a Selston housing drawing demonstrate?

It can show an agreed design measure. Check the ecology report to establish whether it is an enhancement or compensation for a specific impact.

Which stage did Ashfield’s new plan reach on 24 November 2026?

The council published the inspectors’ report finding the plan capable of adoption with their main modifications. Look for a separate formal adoption decision.

What should be recorded for a path beside former colliery woodland?

Identify the wooded approach, breaks in the canopy, lighting hours and the position of any surveyor or recorder. These details link activity observations to the actual path design.

Local evidence / Practical design

Discuss your Ashfield project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal