Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Broxtowe / Surveys · Design advice · Planning

Bat surveys in Broxtowe

At Awsworth, the bat issue was where animals were feeding and travelling across a development site. At Kimberley the question concerned emergence from buildings. Those two Broxtowe records show why a conclusion about a roof cannot settle a layout or lighting question elsewhere on the site.

See the local planning examples

Discuss your Broxtowe project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Broxtowe: place the proposal in its local setting

Broxtowe council boundary
The inset locates Broxtowe in Nottinghamshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km
Enlarge map · Nottinghamshire locator
The inset locates Broxtowe in Nottinghamshire. North is up. The scale bar applies to the main map.
Broxtowe council boundary. The inset shows its position in Nottinghamshire. North is up. The scale bar applies to the main map.

From Kimberley and Awsworth to the Trent-side gravel pits

Broxtowe Borough Council includes Beeston, Stapleford, Eastwood, Kimberley, Nuthall, Bramcote and Attenborough. Nottingham City and Erewash lie close by but have separate planning authority boundaries. Do not assume a Nottingham postal address lies inside the city.

Local context · Beeston · Kimberley · Eastwood · Stapleford · Bramcote · Attenborough / Trent context

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Broxtowe’s Core Strategy and Part 2 policies

Current framework

The operative plan includes Broxtowe's Greater Nottingham Aligned Core Strategy adopted in September 2014, particularly Policy 17 on biodiversity, and Broxtowe Part 2 Local Plan adopted 2019, particularly Policy 31 on biodiversity and design/landscape provisions. The site, retained trees and proposed works determine which apply. [1]

The strategic plan and Broxtowe’s borough plan · Checked 23 November 2026

Checked 23 November 2026

Two processes need to be distinguished. The Greater Nottingham Strategic Plan was submitted in December 2025 and had hearings in July 2026. It covers Broxtowe, Nottingham City and Rushcliffe. Broxtowe’s separate borough Local Plan passed Gateway 1 on 31 October 2026. Its call for sites runs from 17 November 2026 to 8 January 2027. Neither process is an adopted replacement. [2; 3]

When Broxtowe asks for biodiversity evidence

Supporting information

Broxtowe’s additional validation guidance asks for evidence of existing biodiversity interests and likely impacts where relevant. Its examples include older-building demolition, roof spaces, vegetation removal and watercourse alterations. Explain the effects and any mitigation, using the appropriate application checklist. [4; 14]

What the Kimberley evidence establishes

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [7]

Local evidence / Practical design

Where a gravel pit meets a wooded edge

At Attenborough the former gravel workings have left open water, islands and wooded margins. An observer on one path may have a clear view across the water but none behind the fringe of trees. Describe the actual observation area when considering neighbouring works.

Local evidence / Practical design

Lessons from local planning records

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Kimberley: follow-up findings need careful interpretation

For 26/00495/FUL, the October 2026 council report describes a November 2025 PRA followed by dusk surveys in May and June 2026. It records no bats emerging during those surveys. The ecologist’s conclusion is specific to the buildings, methods and proposal assessed; it does not prove permanent absence. [5]

Separate the finding from the planning outcome

The committee resolved to delegate permission subject to conditions, including construction ecology and integrated wildlife features. That resolution is not verification of a signed notice or licence. If the design changes, review whether the existing evidence still addresses the affected roof, garage and surrounding habitat. [6]

Local evidence / Practical design

What officers reported at Awsworth

Broxtowe’s June 2021 committee report on 20/00056/OUT recorded feeding and commuting activity mainly in the centre and east of the site. No on-site roost was identified in the survey it summarised. Lighting to protect hedges and woodland, new tree avenues, water and boxes were proposed. These were project measures, not a finding that replacement habitat had already worked.

Read the Awsworth committee report, paragraph 6.5.6

Retain / Adapt / Assess the remaining effects

Explore design options before fixing the scope

Conceptual survey interpretation pathway. Inspection, justified follow-up and design review are distinct stages; no fixed number of surveys or outcome is prescribed.
Enlarge the Broxtowe design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual survey interpretation pathway. Inspection, justified follow-up and design review are distinct stages; no fixed number of surveys or outcome is prescribed.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Kimberley dwelling and garage replacement

Compare PRA, access limitations and the follow-up emergence results. If the scheme changes after the assessment, revisit whether the earlier evidence still addresses the roof being removed.

Keep the inspected features identifiable on revised plans. Record any new opening, demolition extent or lighting change. A useful report explains whether those changes alter its conclusions or require a further site check before work.

Beeston and Attenborough riverside lighting

Retain dark margins and key vegetation where site evidence supports their function. Shift parking and façade illumination before relying solely on lantern specification.

Show existing and proposed illumination at the assessed vegetation edge. Include construction lighting and operating hours. This allows the design team to compare avoidance options before relying on a specification for shielded lamps alone.

Eastwood older workshop or mill conversion

Inspect roof, brick interfaces and adjacent structures early. Plan scaffold and works sequencing around any confirmed occupied features rather than assuming enhancement boxes are mitigation.

Bramcote garden infill

Assess mature trees, hedges and direct construction disturbance. Minimise new floodlighting towards a retained garden boundary.

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Local evidence / Practical design

House and garage surveys in Kimberley

Mark the garage separately from the dwelling. Compare the areas watched during dusk surveys with the demolition and scaffold drawings. If a roof extension or new lighting has been added, assess the changed feature rather than relying on the original building list.

Survey guides: Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

How to draw a pitch or yard beside an Awsworth hedge

A site-wide lighting average can conceal a brightly lit break in a movement route. Put the path, woodland edge and hedge junction on the drawing and show how illumination changes across them. Ask for the construction lighting layout as well as the final one.

Local evidence / Practical design

Which Kimberley record should the contractor use?

The council report describes the PRA and later dusk visits. The committee resolution and issued notice have different functions. Before starting work, match the approved drawing to the ecological measures and identify which party is responsible for any integrated wildlife feature.

Further reading: survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Broxtowe bat survey questions

Does the Awsworth report identify a roost on the site?

It reports feeding and commuting activity and no roost identified by that survey. The spatial pattern of activity still mattered to the design.

Why distinguish the east of the site at Awsworth?

The report records most activity in the central and eastern areas. A detector on a different boundary would not investigate the same route or test the same lighting change.

Can the Kimberley surveys be used for another garage?

They concern the watched buildings and the proposal described. A neighbouring garage can differ in materials, roof access and exposure.

What helps on a site beside Attenborough’s lakes?

Show the bank and nearest cover, the direction of new light and any limitations on viewing the water. Reserve records alone cannot confirm a building roost.

Are bat boxes enough where a hedge is being opened up?

Boxes offer roosting opportunities. They do not replace a sheltered flight route. Test retention or relocation of the gap and assess lighting at the crossing.

Which drawing should I use near the Erewash boundary?

Check where all the works sit, including temporary access. Use the relevant planning boundary alongside habitat features that can extend across it.

Local evidence / Practical design

Discuss your Broxtowe project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal