Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Dacorum / Surveys · Design advice · Planning

Bat surveys in Dacorum

A bat emerging from hanging tiles in Tring and a purpose-built mitigation wall in Hemel Hempstead pose quite different planning questions. One turns on the detail of a roof repair. The other concerns whether an existing ecological measure will still function after redevelopment.

See the local planning examples

Discuss your Dacorum project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Dacorum: place the proposal in its local setting

Dacorum council boundary
The inset locates Dacorum in Hertfordshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km
Enlarge map · Hertfordshire locator
The inset locates Dacorum in Hertfordshire. North is up. The scale bar applies to the main map.
Dacorum council boundary. The inset shows its position in Hertfordshire. North is up. The scale bar applies to the main map.

From Hemel’s former gasworks to the Tring reservoirs

Dacorum Borough Council is the local planning authority covering Hemel Hempstead, Berkhamsted, Tring, Kings Langley, Bovingdon, Markyate and rural parishes. It is distinct from St Albans, Three Rivers and Buckinghamshire, despite nearby settlements or shared landscape areas. Check the actual application boundary and decision authority.

Local context · Hemel Hempstead · Berkhamsted · Tring · Kings Langley · Gade / Bulbourne / Chilterns context

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Dacorum’s CS26 green infrastructure policy

Current framework

The Dacorum Core Strategy 2006–2031, adopted on 25 September 2013, remains part of the adopted framework. CS26 Green Infrastructure addresses ecological networks; CS29 Sustainable Design and Construction also informs design. Read it with saved Local Plan policies and the 2017 Site Allocations document. Establish the operative policies for the parcel before relying on an emerging allocation. [13; 11]

The 2041 examination and the next plan

Checked 23 November 2026

The Local Plan to 2041 remains under examination. A separate future plan to 2045 is also progressing. The 13 November 2026 timetable decision moves its next plan-content and evidence consultation to 8 July–2 September 2027. Those are forecast dates, not an open consultation or adopted policy. The decision explicitly explains that the two plan programmes are proceeding in parallel. [1; 15; 14]

Matching evidence to the application type

Supporting information

Use Dacorum’s current application guidance and confirm the supporting information for the application category. This review did not establish a complete current ecology validation list. The national planning guidance still requires sufficient evidence where bats may be affected. Explain the relevant roof, tree or lighting effects and the limitations of any existing survey. [12; 5]

Tree features and access constraints to record

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [5]

Local evidence / Practical design

From Hemel’s former gasworks to the Tring reservoirs in the survey brief

Features to inspect

The River Gade, River Bulbourne, Grand Union Canal and green belt/Chilterns woodland edges may provide movement and feeding corridors. Mature town trees, old schools, tiled heritage roofs, industrial buildings and bridges can provide potential roost features. However, the presence of a historic roof or a wood on a landscape map does not prove that a particular building hosts bats.

Connections and wider effects

The Chilterns National Landscape designation and the Chiltern Beechwoods Special Area of Conservation have their own planning and conservation purposes. The SAC recreational mitigation pathway relates to the site's protected interests rather than a universal bat-roost survey radius. Night lighting and trees can need their own assessment based on the relevant species and actual project.

Local evidence / Practical design

What the Tring observation and Hemel redevelopment each establish

Tring: feature-level evidence informs the route

The historical officer report for 23/00813/FUL describes May 2022 observations of a bat emerging from hanging tiles. Hertfordshire Ecology treated the observation as roost evidence and identified a separate EPS licensing requirement for affected works. The report is not evidence of an issued licence or present occupation in 2026. [2]

A roof detail can therefore matter more than the general appearance of the building. Coordinate any repair alternative with the evidenced roost function.

Hemel Hempstead: retain mitigation functionality

The report for 23/03028/MFA describes a bat mitigation wall at the former gasworks, reportedly constructed in 2019 after earlier permission. Later redevelopment needed to consider its continuing ecological function and approach conditions. The original licence and monitoring outcomes were not independently inspected. [3]

An existing mitigation feature is not simply an object to retain on a plan. Review surrounding lighting, access and management so later works do not undermine the function it was intended to provide.

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Local evidence / Practical design

Why the four Tring reservoirs need more than one map pin

Herts and Middlesex Wildlife Trust describes four separate reservoirs. Three sit close together, while Wilstone lies farther west. Reedbed, wet woodland and open water meet at their margins. For a path or bank repair, mark the actual length of bank affected and how workers will reach it. The reserve description establishes habitat context. It cannot tell you which sections bats use at dusk.

Explore the Wildlife Trust’s Tring Reservoirs site account

The November timetable update explains the risk of overlapping consultations on Dacorum’s two emerging plans. Keep each document’s purpose and date clear in an application. Neither programme changes what an existing survey actually observed. [14]

Retain / Adapt / Assess the remaining effects

Design around the Tring tiles and the Hemel mitigation wall

Dacorum design guide explaining how later development can affect retained mitigation functionality.
Enlarge the Dacorum design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Dacorum design guide explaining how later development can affect retained mitigation functionality.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Tring historic hanging-tile building

Assess roof and façade features touched by the works. Where actual emergence evidence confirms a roost, explore retaining functional entrances and reducing construction disturbance before detailing licence-dependent compensation.

Do not lift tiles or open a suspected roost as part of an informal check. Arrange suitable specialist assessment before intrusive works.

Hemel Hempstead brownfield conversion

Check old ecology agreements and any retained bat wall or other feature alongside current lighting and landscaping. Preserve an evidence-based dark route through new construction and occupation rather than treating a historic condition as automatically discharged.

Keep the feature’s approach, lighting and maintenance responsibilities visible in the redevelopment drawings and programme.

Berkhamsted or Kings Langley riverside works

Inspect affected trees, bridges and water-edge vegetation; shift an access or light source where current evidence identifies a functional connection.

Chilterns woodland-edge housing

Assess light spill and wildlife-sensitive trees using current Chilterns lighting guidance where the designation applies, and keep site-level bat survey needs separate from the SAC visitor mitigation obligation.

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Local evidence / Practical design

Start with the tiles in Tring or the retained wall in Hemel

For a tile repair, compare the observed access with the tiles, battens and underlay being disturbed. For a retained mitigation wall, obtain the earlier design and trace its connections to shelter. A drawing that labels the wall for retention may still introduce light across its approach.

Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Light on the Gade and Bulbourne approaches

At a towpath entrance, compare light along the path with light crossing the water or the first row of trees. Ask for a section through the bank and the new fitting. If a scaffold sits beside an opening in a canal-side building, put that temporary arrangement on the same elevation.

Local evidence / Practical design

Checking an old Tring record against today’s works

The date of an earlier observation matters, as do changes to the building since the visit. Pass the ecologist the earlier report and the current detail before the roofer orders materials. Keep the licence question tied to the works and roost function that the ecologist actually assessed.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Dacorum bat survey questions

Did the Tring planning report confirm a bat licence?

It records an emergence observation and licensing advice. An issued licence and the works it covers must be verified separately.

What if the Hemel mitigation wall stays in place?

Check its entrances, access and lighting after redevelopment. Physical retention alone does not demonstrate continued function.

Are the four reservoirs a single planning site?

The reserve account covers four water bodies. Identify the affected parcel and its planning authority from the proposed works plan.

Do Ashridge records establish use of my tree?

They give woodland context. Inspect the particular tree and assess the features and working methods that could affect it.

Which of Dacorum’s two plan processes affects my proposal?

Refer separately to the plan to 2041 under examination and the later plan-making programme. Start the application with the adopted development plan.

How should I brief an ecologist about hanging tiles?

Send photographs and an elevation showing precisely which tiles will move, how the scaffold is supported and whether the roof junction changes.

Local evidence / Practical design

Discuss your Dacorum project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal