Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

East Hertfordshire / Surveys · Design advice · Planning

Bat surveys in East Hertfordshire

East Hertfordshire’s public records distinguish a tree question at Much Hadham, a road-lighting question at High Cross and a habitat network at Gilston. Use the local plan, landscape and drawings to establish which evidence your building, access or lighting proposal needs.

See the local planning examples

Discuss your East Hertfordshire project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

East Hertfordshire: place the proposal in its local setting

East Hertfordshire council boundary
The inset locates East Hertfordshire in Hertfordshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km
Enlarge map · Hertfordshire locator
The inset locates East Hertfordshire in Hertfordshire. North is up. The scale bar applies to the main map.
East Hertfordshire council boundary. The inset shows its position in Hertfordshire. North is up. The scale bar applies to the main map.

Hertford, Ware, the villages and the Gilston development area

East Hertfordshire District Council serves Hertford, Ware, Bishop's Stortford, Buntingford, Sawbridgeworth, Much Hadham, Standon, High Cross and other rural parishes. A nearby Harlow or Gilston address may straddle the Essex boundary: the local planning authority follows the actual site, not a garden-town marketing name. Hertfordshire County Council can determine minerals, waste or highways proposals.

Local context · Hertford · Ware · Buntingford · Bishop’s Stortford · Much Hadham · Lea / Stort / rural connections

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Nature conservation in the East Herts District Plan

Current framework

The East Herts District Plan 2018 remains the adopted baseline. NE3 Species and Habitats addresses conserving and enhancing wildlife. Read it with NE1 and NE2 on designated and other nature features, and NE4 Green Infrastructure. Apply the complete policies, mapped constraints and any made neighbourhood plan to the actual parcel. Older BNG wording needs reading alongside current national requirements. [1; 16; 2]

Gateway 1 and the new Local Plan timetable

Reviewed 26 November 2026

The replacement Local Plan 2029–2044 reached Gateway 1 on 15 October 2026. Its timetable forecasts content-and-evidence consultation for 10 February–24 March 2027. A separate Call for Sites runs 15 October–26 November 2026. The published closing date was 26 November 2026. Putting land forward does not allocate it or grant permission. Check the latest programme before relying on a milestone. [3; 4]

Ecological survey evidence under L11

Supporting information

The council now links a November 2025 joint validation checklist, rather than the older 2019 local list. L11 Ecological Survey and Assessment addresses major applications, specified works within the mapped Ecology Consultation Area, and proposals that may affect habitats or species. Roof-space alterations and demolition are among the mapped-area triggers. Protected-species survey scope still depends on likely presence and affected features. [5; 17]

What the drawings should show in East Herts

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [9]

Local evidence / Practical design

Following a green lane through a changing Gilston landscape

An arable field can appear open on a location plan while an old lane offers continuous shelter at its edge. Draw the banks, vegetation and connections at each end. An access cut across a lane changes a different feature from a road running alongside it. That distinction should be visible in the ecological brief.

Local evidence / Practical design

Where the Much Hadham and High Cross evidence changed the brief

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Much Hadham: separate tree and building evidence

For 3/25/1097/FUL, the April 2026 officer report describes retained trees with potential roost features. It separately considers lightweight, open sheds unsuitable for roosting and identifies lighting considerations around local habitat. The 15 April committee resolved conditional approval. [6; 7]

Potential suitability is not a confirmed tree roost. The original field data and any later licensing were not independently inspected. Keep each feature’s conclusion and limitations clear.

High Cross: specify the lighting evidence

The February 2026 report for 3/24/0284/OUT considers ecological features and proposes precautionary lighting and planting conditions. It illustrates why access, retained vegetation and operational lighting should be coordinated. The signed decision and subsequent condition discharge were not independently verified. [8]

For your proposal, show the affected features, proposed lamp positions, operating hours and predicted spill. A condition from another site is not a universal lux threshold or proof of roost occupancy.

Local evidence / Practical design

How the Gilston Park Estate strategy reads the landscape

The estate’s biodiversity document identifies three old or green lanes, a network of hedges, watercourses and protected fauna including bats. It proposes retaining and connecting ecological features within the development. For a design team, the useful question is which connection survives at each crossing. The strategy describes a wider landscape and does not locate a roost on an individual parcel.

Read the Gilston Park Estate biodiversity strategy

The open Call for Sites is about land available for plan-making. It does not demonstrate ecological suitability or permit development. The Lea and Stort valleys, farm boundaries and woodland connections can inform a site brief without implying a roost in every nearby building. [4]

Retain / Adapt / Assess the remaining effects

Much Hadham trees, High Cross lighting and Gilston green lanes

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the East Hertfordshire design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Hertford roof and eaves repair

Inspect the actual slopes, gables, soffits and loft to be disturbed. Consider keeping confirmed entrances functional by altering insulation or construction sequence where safe and lawful.

Coordinate roof insulation, ventilation and scaffold access with the evidenced feature. Retaining an opening alone may not preserve suitable conditions.

Much Hadham housing edge

Keep trees with suitable roost features where feasible and evaluate hedge and temporary-lighting changes before fixing access locations.

Record why each retained tree matters. Include working areas and temporary lamps, rather than checking only the completed housing layout.

Ware/High Cross new road or parking

Map construction and operational light spill onto assessed vegetation and commission appropriate activity analysis if credible impacts require it.

Gilston/Bishop's Stortford development

Check the correct local planning authority and whether specific roofs, trees or watercourses are affected; a cross-boundary strategic masterplan does not clear individual roosts.

Local evidence / Practical design

Deciding whether the Much Hadham question is about a tree or shed

Label the structure and each tree individually. The Much Hadham report treats the open sheds and potential roost features in trees separately. If the scheme retains a tree, show the working zone, access and lighting around it. Physical retention alone tells the reviewer little about disturbance around a feature.

Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

From the High Cross junction to a Hertford riverside path

Show how vehicles approach, where luminaires face and which areas will remain sheltered after planting. At Hartham Common, paths and sports uses sit beside river margins. Label the riverbank and approaches separately from the lit surface so the ecologist and lighting designer assess the same receptors.

Local evidence / Practical design

When to coordinate the Gilston crossing details

Bring the highway designer, ecologist and landscape team together before the crossing width and column schedule are fixed. If planting provides future shelter, describe what will exist when the scheme opens. An ecological route that only works after the hedge matures needs a clear interim design.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

East Hertfordshire bat survey questions

Does the Gilston biodiversity strategy identify a roost on my land?

It identifies estate-wide interests and options for habitat continuity. The parcel, proposed works and site evidence determine the roost question.

How should I show a Much Hadham tree that will remain?

Give it a reference and show access, excavation, lighting and canopy clearance. These can affect a retained tree or its approach.

Which East Herts plan is the starting point?

Use the adopted 2018 District Plan and the relevant site policies. The replacement plan timetable is a separate source for emerging proposals.

What does a Call for Sites entry mean for Gilston or Ware?

It records land put forward for consideration. Check the adopted policies map and any subsequent formal allocation or permission separately.

Can one riverbank light plot cover a new access as well?

Only if it covers both sets of receptors at relevant heights and uses the same layout, hours and planting assumptions.

What can a Hartham Common example contribute to a private brief?

It shows how open space, water and recreation meet. Use that relationship to frame questions for the private site without transferring species findings.

Local evidence / Practical design

Discuss your East Hertfordshire project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal