Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Gedling / Surveys · Design advice · Planning

Bat surveys in Gedling

Carlton’s Richard Herrod Centre and the lagoons at Gedling Country Park show why the assessment needs to distinguish a building, a habitat and a phase of work. A permission for a replacement facility and an application to demolish its predecessor can also have different supporting documents.

See the local planning examples

Discuss your Gedling project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Gedling: place the proposal in its local setting

Gedling council boundary
The inset locates Gedling in Nottinghamshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km
Enlarge map · Nottinghamshire locator
The inset locates Gedling in Nottinghamshire. North is up. The scale bar applies to the main map.
Gedling council boundary. The inset shows its position in Nottinghamshire. North is up. The scale bar applies to the main map.

Carlton’s leisure site and the former colliery landscape

Gedling Borough Council covers Arnold, Carlton, Netherfield, Calverton, Ravenshead and a mix of urban areas, older buildings and countryside. It has its own adopted planning policies, local validation material and development plan review. Nottingham City, Broxtowe and Rushcliffe have different planning jurisdictions, even where postal addresses or wider urban habitats appear to overlap.

Local context · Arnold · Carlton · Netherfield · Calverton · Ravenshead · Trent / Bestwood context

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Gedling’s biodiversity and local plan policies

Current framework

Gedling's adopted plan includes the Greater Nottingham Aligned Core Strategy adopted in September 2014, particularly Policy 17 on biodiversity, together with the Gedling Local Planning Document Part 2 adopted on 18 July 2018. Policy LPD18 protects and enhances biodiversity; LPD19 addresses landscape character and visual impact. Additional design, amenity, conservation and site-allocation requirements depend on the project. The council cautions that parts of its policies map may have changed since original adoption. [1] [15]

Gedling’s submission timetable

Checked 23 November 2026

The Gedling Local Development Plan is still emerging. Publication Draft consultation ended on 3 August 2026, with submission planned for December. Cabinet consideration is scheduled for 26 November 2026 and Council for 9 December. These are scheduled decision dates. Verify the recorded resolutions and formal submission separately. Gedling’s plan is separate from the three-authority Greater Nottingham Strategic Plan. [2; 3]

Using Gedling’s Local Requirements List

Supporting information

The council links its May 2025 Local Requirements List, following the 2023 adoption history. It includes ecology reports where protected or priority species, habitats or designated sites may be affected. Check the application-specific section and detailed guidance, alongside trees and lighting evidence where relevant. [4; 16]

Lighting and ecology at Carlton

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [7]

Local evidence / Practical design

Carlton’s leisure site and the former colliery landscape in the survey brief

Features to inspect

Arnot Hill Park in Arnold, Gedling Country Park on a former colliery, the River Trent corridor near Netherfield and woodland edges around Bestwood offer different landscape contexts. Mature garden trees, older masonry and tiled roofs, bridges, and watercourse vegetation can create possible roost features or feeding and movement routes. None of these places automatically proves the presence of a roost on a proposed development site.

Connections and wider effects

Residential roof insulation and repairs can affect hidden gaps at eaves, flashings and roof coverings. A leisure-centre redevelopment may add tree removal, demolition, temporary lighting and new operational illumination. The assessment should extend to all relevant impacts and construction phases, but avoid prescribing landscape activity surveys where the actual proposal only raises a proportionate building inspection question.

Local evidence / Practical design

Carlton’s replacement permission and demolition application

Carlton: connect ecology and lighting requirements

The 14 October 2026 Richard Herrod Centre record, 2026/0501, considers a preliminary appraisal, daytime bat walkover and biodiversity assessment. The council required ecology management and wildlife-sensitive lighting details for the replacement leisure centre. This does not itself document an occupied roost. [5; 6]

Keep demolition and redevelopment evidence aligned

The officer report identifies a separate demolition prior-approval application, 2026/0490. The replacement-building decision must not be treated as blanket ecological clearance for that separate work. Check which report and condition cover each phase, and resolve any gaps before demolition or tree clearance. [6]

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Local evidence / Practical design

What the Gedling Country Park lagoon records establish

The council’s nature-reserve designation papers list casual observations of Daubenton’s bats foraging over the lagoons in 2005 and 2008. These records tell us where and when the bats were feeding. The observations do not identify an exit or establish use of a nearby structure. For a modern path or lighting proposal, survey the part of the bank and approach that will change.

Read the species records in Gedling’s reserve designation papers

Nottinghamshire’s nature recovery strategy was published on 10 November 2025. It provides strategic habitat priorities around the Trent and the wider woodland and urban network. It does not map every bat roost or replace site inspection. [11]

Retain / Adapt / Assess the remaining effects

A working drawing for the Carlton redevelopment and park edge

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Gedling design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Arnold roof works

Photograph and inspect the actual roof slopes, tile joints, soffits and wall heads to be opened. Where a potentially occupied feature can be retained, discuss repair sequence and access conservation before planning demolition or replacement boxes.

Mark the affected features on the repair drawings and explain access restrictions. Coordinate ecology, insulation and scaffold details. Retaining a gap only helps if the associated roost space and access remain functional and the works are lawful.

Carlton leisure or commercial redevelopment

Review all ecology and demolition documents independently; plot lighting, temporary work areas, tree protection and accessible building features. Ask whether relocating lamps or access maintains any assessed dark corridor.

Create one phase plan linking demolition, replacement construction and landscape works. Identify the ecological evidence supporting each phase. Conditions attached to one application should not be assumed to resolve effects covered by a different consent.

Netherfield Trent-side site

Consider trees, bridges, riverside banks and evening activity changes. Map new spill toward vegetation and water; consider a different access route or fixture position where the evidence justifies retaining darkness.

Bestwood and Ravenshead mature trees

Assess cavity and tear-out features before pruning or felling, with a clear tree impact plan. Site-level evidence determines whether to retain a feature, seek further assessment or discuss lawful mitigation.

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Local evidence / Practical design

Keep both Carlton application references on the programme

The Richard Herrod Centre material distinguishes demolition prior approval from the replacement leisure scheme. List the reports that cover each operation and identify when the building, vegetation and lighting will change. This makes it possible to spot a gap between clearance and the permanent works.

Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Check the dark edge beyond a new leisure facility

Plot vehicle access, car-park fittings and sports or security lighting against the trees on the site boundary. At a waterbody, add the water-facing side of the bank. A low predicted value at the building frontage may say little about the foraging edge behind it.

Local evidence / Practical design

Coordinating the Carlton demolition date

Before confirming a start on site, check the demolition reference, the current surveys and any pre-start controls. Record who will approve a change in fencing or temporary lighting. Those items can affect the ecology assessment well before the new leisure building opens.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Gedling bat survey questions

Do the Gedling lagoon records show present use?

They document historical observations of foraging. A present-day proposal needs evidence at the place and time relevant to its effects.

Did the Richard Herrod Centre conditions prove a roost?

No. Ecology management and lighting requirements can protect habitat without confirming use of a building by roosting bats.

Why retain both Carlton references in a contractor brief?

One concerns demolition and the other the replacement development. The evidence and conditions should be traced to the operation they cover.

Is Gedling’s emerging plan the same as the Greater Nottingham strategic plan?

Gedling is pursuing a separate Local Development Plan. Check the authority and version when citing emerging material.

What should I record for a new path by a former colliery lagoon?

Show the bank, existing trees, path alignment, crossing points and operating hours of any proposed lights.

Can a scheduled Cabinet item be treated as submission?

A scheduled item records a step in decision-making. Check the recorded resolution and subsequent submission before describing either as complete.

Local evidence / Practical design

Discuss your Gedling project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal