Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Hertsmere / Surveys · Design advice · Planning

Bat surveys in Hertsmere

At Barnet Lane in Elstree, bats used different parts of one site in different ways. The woodland edge mattered for movement and the wet ditch for feeding. A Potters Bar roof alteration calls for a different starting point, with evidence tied to the fabric being opened.

See the local planning examples

Discuss your Hertsmere project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Hertsmere: place the proposal in its local setting

Hertsmere council boundary
The inset locates Hertsmere in Hertfordshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 2 km
Enlarge map · Hertfordshire locator
The inset locates Hertsmere in Hertfordshire. North is up. The scale bar applies to the main map.
Hertsmere council boundary. The inset shows its position in Hertfordshire. North is up. The scale bar applies to the main map.

From Barnet Lane woodland to Hertsmere’s town roofs

Hertsmere Borough Council covers Borehamwood, Elstree, Bushey, Radlett, Potters Bar and Shenley. It is a different planning authority from Three Rivers, St Albans, Welwyn Hatfield and London boroughs. The Borough's green belt and adopted policy map can be material to a scheme's overall planning merits independently of wildlife surveys.

Local context · Borehamwood · Elstree · Bushey · Radlett · Potters Bar · Shenley · Woodland / watercourse / urban edge

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Hertsmere’s CS12 and SADM policies

Current framework

Hertsmere’s Core Strategy 2012–2027, adopted on 16 January 2013, includes CS12 Enhancement of the Natural Environment. The 2016 SADM Policies Plan includes SADM10 Biodiversity and Habitats, SADM12 Trees, Landscaping and Development, SADM16 on watercourses and SADM20 on pollution. Read these with the applicable policies map and Elstree Way Corridor Area Action Plan where relevant. [1; 13]

Hertsmere’s revised submission deadline

Reviewed 26 November 2026

Hertsmere’s Regulation 19 consultation closed on 19 November 2026. On 25 November, Cabinet approved a revised timetable extending the submission deadline to 31 March 2027. The decision sets the deadline. The council’s submission record will establish when the plan actually enters examination. [2; 3]

Using the biodiversity and trees checklist

Supporting information

The council’s Biodiversity and Trees SPD provides a screening checklist in Part B. It helps identify survey, records and supporting-evidence needs before submission. Check the current application requirements and any site-specific neighbourhood design checklist as well. The SPD is older guidance: use current survey standards and national legislation alongside it. A completed checklist is not proof of bat absence. [15; 14; 8]

Evidence for alterations to buildings and trees

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [7]

Local evidence / Practical design

Find the edge that a new access would interrupt

Plot the route into the development from the existing road. Where it cuts through a tree belt, give the width of the opening and the position of the first streetlight. At a Bushey plot with mature trees, include the construction route beneath the canopy. A tree shown as retained can still lose the shelter beside it.

Local evidence / Practical design

Barnet Lane: survey findings and the recorded planning vote

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Elstree: different surveys answer different questions

The 14 May 2026 officer report for 24/1663/FUL, Barnet Lane, reviews a PRA, emergence and activity reports, aerial tree survey and lighting information. It considers ecological effects acceptable subject to specified construction and management measures. The original detector data and any licence were not independently reviewed. [4]

That suite of methods reflects one site’s scope. It is not evidence that every Hertsmere extension requires all of those surveys.

Ecology acceptance is not planning permission

The recorded vote for the Elstree scheme refused the application on wider planning grounds, including Green Belt and heritage or landscape effects. At the same meeting, 25/1815/FUL in Bushey was deferred for further information. [5; 6]

Keep the officer’s ecology assessment separate from the committee outcome. A survey can resolve an ecological question while other planning issues remain. Neither decision establishes an occupied bat roost or an issued species licence.

Local evidence / Practical design

What surveyors saw at Barnet Lane

The applicant’s activity report describes common and soprano pipistrelles mainly commuting along the northern and western woodland edge. The team also recorded frequent feeding activity by the central wet ditch and scrub, and less activity along other boundaries. Splitting those observations by location gives a designer a better brief than a single activity total for the whole site.

Barnet Lane applicant’s bat activity survey

Hertsmere’s adopted biodiversity and tree policies connect local design with wider habitat. Woodland edges, watercourses and retained gardens can raise lighting questions even where the assessed building has little roost suitability. The habitat metric and a bat-roost assessment serve different purposes. [13; 7]

Retain / Adapt / Assess the remaining effects

Elstree access routes, Hertsmere roofs and Bushey trees

Conceptual Hertsmere evidence guide distinguishing ecological assessment from other planning tests.
Enlarge the Hertsmere design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual Hertsmere evidence guide distinguishing ecological assessment from other planning tests.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Elstree woodland-edge housing

Integrate a competent tree-roost appraisal and lighting model into the access and layout early, retaining functional connections where supported; separately resolve Green Belt and heritage concerns.

Match tree and activity evidence to the actual affected features. Keep the ecologist’s recommendations consistent with access and landscape drawings.

Borehamwood or Potters Bar roof work

Inspect the actual eaves, roof junctions, soffits, gables and loft affected, then consider an avoidance repair design before promising boxes as compensation.

Record inspection limits and any concealed features. Discuss alternatives before committing to roof stripping or sealing gaps.

Bushey mature-tree redevelopment

Distinguish protected tree/landscape policy and any potential roost features, with appropriate seasonal evidence if felling could affect bats.

Radlett watercourse-side project

Protect connected dark vegetation from unnecessary permanent and construction lighting where ecological evidence supports a movement link.

Local evidence / Practical design

When do Elstree field observations change the layout?

If the route that bats follow coincides with a proposed entrance, compare moving the opening with retaining a wider belt of cover. Where the impact is confined to an outbuilding, identify the walls and roof faces that observers could see. Record a pass along the woodland independently of a bat observed leaving the building.

Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Assess the wet ditch and the woodland face separately

The ditch can receive light from a different direction from the tree line. Mark both on the lighting model, including spill from new windows. Compare performance when access lighting is on and during quieter periods. Give the ecologist the modelled heights as well as a coloured plan.

Local evidence / Practical design

Use Hertsmere’s timetable and committee decision accurately

For a planning statement, distinguish the adopted framework from the new plan’s submission timetable. In the Elstree case, the ecology assessment addressed one part of the recommendation. Check the recorded vote for the decision as a whole, and retain the original activity report when explaining how the landscape was used.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Hertsmere bat survey questions

What did the Barnet Lane survey add to the committee summary?

It describes where the observers saw commuting and feeding. The pattern gives the designer specific edges and a ditch to consider when comparing layouts.

Did a favourable ecology assessment secure permission at Elstree?

No. The committee refused the application on wider planning grounds. A specialist response addresses only its own subject.

Can the Aldenham Reservoir path be used as an observer position?

Confirm access, sightlines and safe working arrangements before the visit. A path shown on a map does not give a survey team permission to use it at night.

Does every Hertsmere roof need the Elstree suite of surveys?

Start with the actual roof features and proposed works. A householder job may pose a narrower question than development beside woodland and a wet ditch.

What changed at Cabinet on 25 November 2026?

Cabinet approved extending the plan submission deadline to 31 March 2027. A deadline is distinct from the date on which a plan is submitted or adopted.

What if the architect moves an entrance after the survey?

Overlay its new position on the activity plan and ask whether it cuts across a different flight route or exposes the wet edge to light.

Local evidence / Practical design

Discuss your Hertsmere project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal