Check the actual planning authority and what the work affects
Middlesbrough council boundary
Map keyCouncil boundaryScale bar · 2 km
Local context · Middlesbrough · Linthorpe · Marton · Nunthorpe · Acklam · Stainton · Thornton · River Tees
Enlarge map · North Yorkshire locator
Middlesbrough council boundary. The inset shows its position in North Yorkshire. North is up. The scale bar applies to the main map.
Understand the setting
Your local planning area
Middlesbrough Council is a separate Tees Valley unitary planning authority. Its area includes the town centre, Linthorpe, Acklam, Marton, Nunthorpe, Hemlington, Newham, Stainton and Thornton. It is not interchangeable with Redcar and Cleveland, Stockton-on-Tees, Darlington or North Yorkshire Council, and a cross-boundary village or postcode must be matched to its real council. [1][2]
Marton and Nunthorpe sit in a different setting from the Tees frontage. Zoom in on the site boundary before using a neighbouring authority’s checklist. For a housing access, follow the hedge past the boundary. The point at which a route narrows may sit outside the application site.
What makes a Middlesbrough bat survey locally distinctive?
Built fabric
The northern River Tees industrial/river context differs from mature residential gardens at Marton and from field-edge housing around Nunthorpe. Woodland edges, watercourses and hedgerows can provide potential commuting structure; older building roof and wall gaps raise different roost questions. No map of green infrastructure is by itself a survey identifying bat roost occupancy. [1][4]
Connected habitats
A development may need both an individual structure assessment and a broader bat-sensitive lighting design. Larger applications should consider whether external lighting, road access, temporary works, tree removal or retained hedgerow connectivity are changing. Smaller proposals must still be judged on their own features, rather than subject to an automatic fixed number of bat detector visits. [4][3]
Local evidence / Practical design
Middlesbrough’s adopted framework and examination timetable
The adopted framework
Middlesbrough's adopted plan is a collection of existing development plan documents, not the proposed 2026 replacement. It includes the Core Strategy (adopted 20 February 2008), Regeneration Development Plan Document (2009), Housing Local Plan (2014), relevant saved earlier policies and Tees Valley Minerals and Waste 2011. The Core Strategy’s CS4 sustainable-development principles and CS5 design policy provide environmental and design context; read the operative text alongside the site’s other policies. [6] Some made neighbourhood plans apply at Marton West and Stainton/Thornton. [1][7]
Plan preparation
Middlesbrough’s examination hearings closed on 1 April 2026. Public consultation on the inspectors’ proposed main modifications ran from 23 September to 5 November. For an application now, use the adopted policies and check the examination record for the inspectors’ final report and any subsequent council adoption decision. [8]
Evidence for submission
The Tees Valley LNRS is in preparation, with 2026 consultation concluded and future publication only anticipated. A proposed nature-recovery network does not resolve protected roost impacts or grant a licence. Middlesbrough publishes a householder planning validation checklist. It is not a complete ecology specification for every application type: confirm the relevant evidence with the council and consult its policies map. Other Tees Valley authorities’ lists do not govern this council. [9][5][10]
Local evidence / Practical design
The main modifications
The 2026 main-modifications consultation ran to 5 November 2026 and is closed. The new Middlesbrough Local Plan remains at examination/modification stage, so use the adopted document framework until formal adoption is verified. The Tees Valley LNRS also remains unpublished as of 23 November. The February 2026 Nunthorpe Grange officer recommendation is not by itself proof of a final decision or condition discharge. [8][5][4]
Local evidence / Practical design
Nunthorpe Grange and Stewart Park in the project records
Nunthorpe Grange · 25/0321/MAJ
Item 2 of the 12 February 2026 committee papers concerned 205 proposed homes. Officers described hedge removal for access from the A1043 and drainage ponds linked to retained boundaries. For bats, the useful design question is how animals could pass the new openings and lit routes.
What the officer recommended
The proposed conditions included further aerial inspection, a precautionary bat working method and wildlife-sensitive lighting. The report recommended approval subject to conditions and a section 106 agreement. Check the issued notice for binding wording. Read item 2, paragraphs 68–72 and proposed condition 34.
Local evidence / Practical design
Interpreting Middlesbrough bat records
Evidence inside a building
EcoNorth’s Stewart Park account concerns bats roosting in one listed lodge. It shows the value of recording where the animals use a building before dividing the roof space. A town-wide species total cannot be inferred from one survey.
Evidence at a retained boundary
A pass recorded beside a Nunthorpe hedge describes activity within the detector’s range. Note effort, weather, direction of travel and repeated passes. If the design depends on a particular connection, place observers or detectors where the path, road or lighting would actually interrupt it.
Local evidence / Practical design
What to investigate on a Middlesbrough site
An attic or eaves conversion
Mark where flooring, insulation or roof repairs will change the void. An inspection of a Marton or Linthorpe house should record accessible signs and the parts behind lining that cannot be seen. If a roost is identified, compare designs while its entrance and internal space can still be retained.
Works along a field boundary
For a Nunthorpe housing layout, match each tree or hedge opening to the access drawing. Inspect affected trees for potential roost features. Assess movement and feeding along retained boundaries separately from the question of a cavity in one tree.
A Tees-side industrial site
Trace the proposed work from each structure to the river edge. Where activity surveys are appropriate, position them to address the actual gap, crossing or illuminated frontage. Note which parts of a structure could be observed and distinguish a crossing flight from an emergence.
Local evidence / Practical design
Four practical ways to avoid or reduce impacts through design
Enlarge the Middlesbrough design example
Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.
Original ACP conceptual illustration. It shows design questions, not a measured property, verified roost or approved mitigation scheme.
Nunthorpe Grange-type housing edge
Before removing hedgerows or trees, survey relevant roost features and compare likely habitat connectivity before/after. Integrate a precautionary method statement, tree retention and meaningful evening lighting strategy where supported by field evidence.
Marton and Linthorpe roof renovations
Inspect the affected eaves, slates, loft and masonry cracks rather than assuming any specific species occupies a domestic building. Incorporate heritage constraints where relevant.
Tees riverside or industrial redevelopment
Screen old building structures and bridges for actual access, and assess replacement night lighting against any verified movement habitat; industrial land is not proof of bat absence.
Stainton/Thornton garden village setting
Confirm made neighbourhood plan and planning authority boundaries, retain connected hedges and mature trees where feasible, and separate enhancement/BNG promises from legal roost mitigation.
Local evidence / Practical design
Testing a lighting plan at the edge of a housing site
Follow the hedge through the layout
Draw the retained boundary, its crossing and the next length of cover. On a Nunthorpe-type layout, compare the dark-route option with the option that puts an access road or a lit footpath alongside the hedge.
Specify what the installer checks
Agree where to calculate and measure spill, how fittings should be aimed and when controls operate. Include temporary compounds and vehicle access. Where the planting is deciduous, describe what screening is assumed in winter. Use the BCT and ILP lighting guidance for the technical brief.
Local evidence / Practical design
Records and green infrastructure
A housing-edge proposal illustrates the practical role of the mitigation hierarchy. A proposed ecology programme can incorporate aerial inspection, protected-feature retention, responsible construction sequence and lighting design; these respond to specific potential impacts. Middlesbrough's current adopted Core Strategy and any made neighbourhood policies still govern the application, while an emerging local plan and draft Tees Valley LNRS cannot be presented as completed legislation. National academic research on light impacts can guide survey questions, but it is not a local roost inventory. [1][8][4][5]
Local evidence / Practical design
Turning the evidence into a buildable sequence
For a roof conversion
Ask the architect to show the retained entrance and internal volume on the same section as the new insulation and fire separation. Where a licence is needed, programme the permitted methods and timing with the building team. Stewart Park illustrates how a roof detail can carry the ecological commitment.
For a phased housing layout
Identify the phase that first breaks a hedge or introduces a light. Put tree inspections, any working method and the proposed lighting review ahead of that activity. Give the site manager the drawing revision and identify who can agree a change. See bat mitigation licensing where a roost could be affected.
Local evidence / Practical design
Middlesbrough bat survey questions
What did officers propose for bats at Nunthorpe Grange?
For application 25/0321/MAJ, the February 2026 report included further tree inspection, a precautionary working method and wildlife-sensitive lighting among its proposed measures. See the committee report and design implications.
Can a bat brick compensate for removing a hedge?
A brick supplies a potential roosting opportunity. It cannot carry a flight route across an illuminated gap. Assess the proposed access and the continuity of the boundary separately.
Would another listed lodge need the same loft as Stewart Park?
The purpose-built loft followed surveys of that particular building. For another roof, establish how bats use it and which spaces, entrances and conditions the proposals would affect before specifying mitigation.
Is the replacement Middlesbrough Local Plan adopted?
The council’s Main Modifications consultation closed on 5 November 2026. Check the examination and adoption records at submission and identify the adopted documents relevant to your site.
Which plans help with a Tees-side lighting enquiry?
Provide the waterfront elevation, lighting layout, proposed hours and a plan of nearby vegetation and access. Include the construction compound if it will operate after dark.
Can an old house survey be reused after the roof design changes?
Compare the inspected roof slopes, access points and limitations with the revised section drawing. A new opening, changed scaffold or redesigned loft can alter the conclusion even when the address is the same.
Local evidence / Practical design
Survey methods and practical next steps
Building evidence
Start with a building PRA and its inspection limitations.
Checked on 23 November 2026. Consultation dates, local requirements and planning records can change. Current adopted policies and emerging proposals have different roles. Public case records are independent examples, not ACP projects.
Share your site boundary, drawings, photographs, earlier reports and council comments. Include roof, tree and demolition works, temporary access, lighting and intended dates.