Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Newark and Sherwood / Surveys · Design advice · Planning

Bat surveys in Newark and Sherwood

A Blidworth woodland edge, a Southwell barn and a Trent-side bridge pose three different survey questions. One concerns movement beneath tree cover, another access to a roof, and the third the junction between masonry, water and the bank.

See the local planning examples

Discuss your Newark and Sherwood project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Newark and Sherwood: place the proposal in its local setting

Newark and Sherwood council boundary
The inset locates Newark and Sherwood in Nottinghamshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km
Enlarge map · Nottinghamshire locator
The inset locates Newark and Sherwood in Nottinghamshire. North is up. The scale bar applies to the main map.
Newark and Sherwood council boundary. The inset shows its position in Nottinghamshire. North is up. The scale bar applies to the main map.

Sherwood woodland, Southwell farmsteads and the Trent

Newark and Sherwood District Council determines ordinary applications across Newark-on-Trent, Southwell, Ollerton, Rainworth, Blidworth and many rural settlements. Nottingham City, Bassetlaw and Rushcliffe each have different adopted plans. A project near a council boundary must use the correct planning authority and any site-specific policies.

Local context · Newark · Southwell · Ollerton · Blidworth · Rainworth · Trent / Devon · Sherwood context

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

DM7 and the adopted Core Strategy

Current framework

Use the 2026 Amended Allocations and Development Management DPD, including DM7 Biodiversity and Green Infrastructure, alongside the March 2019 Amended Core Strategy, including Core Policy 12. The 2026 DPD replaces its 2013 predecessor; do not use the old policy wording as the current test. [1; 2; 14]

What changed on 20 October 2026?

Reviewed 26 November 2026

The Amended Allocations and Development Management DPD was adopted on 20 October 2026. Earlier committee reports discussed the replacement DM7 as emerging. That was their historical context; the newly adopted text now needs to be used. Check the accompanying policies map and any made neighbourhood plan for the actual site. [1; 14]

The district checklist for roofs, barns and trees

Supporting information

The checklist adopted on 11 July 2024 includes protected-species triggers and guidance on Preliminary Bat Roost Assessments. Relevant roofs, barns, trees, waterside works and habitat changes need the appropriate evidence. Read the exemptions and application category carefully, and explain what the initial assessment resolves before proposing further seasonal work. [3; 4]

Ecology evidence at Blidworth and Ollerton

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [7]

Local evidence / Practical design

Follow the part of the landscape the works will change

A woodland-edge entrance near Blidworth can interrupt cover where a track meets mature trees. At a Southwell farmstead, works may instead open the joint between a roof and a wall. Around Newark, access below a bridge can affect a different part of the structure from the repairs above. Mark these operations separately, including temporary works.

Local evidence / Practical design

What Blidworth and Ollerton officers asked the applicants to resolve

Blidworth: answer the outstanding ecology question

The 15 January 2026 officer report for 25/00785/FUL records an initial request for a PEA, biodiversity information and preliminary bat-roost assessment. Further evidence informed the ecologist’s response and proposed construction safeguards. This is an officer assessment, not verification of a licence or completed mitigation. [5]

Ollerton: integrate enhancement into the scheme

The 4 June 2026 report for 25/01999/FULM discusses a PEA, precautionary working and integrated bird and bat features. It illustrates how ecological details connect to the construction and architectural design. Proposed features do not establish an occupied roost; signed consent and installation were not verified. [6]

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Local evidence / Practical design

What Miner2Major investigated in Sherwood

Nottinghamshire Bat Group used mainly static detectors in the 2019–2023 Miner2Major project to investigate rarer bats, including barbastelle, Leisler’s and serotine. The group illustrates a deployment at Blidworth Woods. The named species were survey targets. A detector record can help explain activity along a woodland edge, but it cannot locate a roost in a particular tree without further evidence.

Nottinghamshire Bat Group’s account of Miner2Major

The Nottinghamshire LNRS provides strategic woodland and green/blue habitat priorities. It does not identify every roost or replace field evidence. [11]

Retain / Adapt / Assess the remaining effects

Repair options for Newark masonry and Southwell roofs

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the Newark and Sherwood design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Newark listed or historic roof

Review cracks, roof joints and historic masonry before repair; keep any confirmed bat access functional where feasible without damaging historic fabric or relying on generic replacement boxes.

Bring the conservation adviser and ecologist into the same design discussion. Record which joints and roof spaces will change, including scaffold ties. A repair method should preserve both the relevant fabric and any protected ecological function.

Southwell barn conversion

Assess adjoining sheds, ridge/eaves access and temporary scaffolding, rather than inspecting only the outward-facing roof. Early design decisions may avoid harm to an occupied feature.

Explain how roof insulation, ventilation and adjoining compartments will change. Retaining an entrance may be ineffective if the space behind it is lost. Use sections and a phased works plan to test whether the proposed retention is workable.

Sherwood woodland-edge housing

Keep a viable hedge/tree movement connection and suitable darkness if surveys justify it. Assess both construction and permanent lights without inventing a species observation from forest proximity.

Trent-side infrastructure

Map trees, bridges and waterways actually affected, separate planning permission and ecology from flood/drainage requirements, and examine whether access can avoid key vegetation.

Local evidence / Practical design

Match Sherwood detector work to the decision

If a proposed access cuts a woodland margin, ask which approaches the new gap may sever and how observers could test that question. A static detector can sample calls over several nights. A person at the crossing can also record direction and height where visibility allows. Explain how the two sources fit together.

Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Draw the light path beneath a Trent crossing

Give the lighting designer a bank-to-bank section showing the soffit, water and edge vegetation. Include lamps on scaffolding and compounds as well as permanent fittings. The darkest part of the finished design may still be exposed while the works take place.

Local evidence / Practical design

Connect the Blidworth and Ollerton lessons to the job

The Blidworth report describes additional evidence requested during assessment. The Ollerton example addresses design features and safeguards. Use a drawing register to distinguish evidence needed to make the decision from details that a contractor will need at installation.

survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Newark and Sherwood bat survey questions

Does the Miner2Major species list apply to my land?

It describes a landscape-scale project and its target species. Specify the habitat, equipment position and observation behind any species claim for your own parcel.

Is the 2013 development management wording still current?

The council adopted its Amended Allocations and Development Management DPD in October 2026. Check the adopted wording and map alongside the amended Core Strategy.

What should a bridge repair drawing include?

Show which joints, cavities or soffit sections contractors will reach, where platforms will sit and how they will access both banks.

Can I use a recorder to clear a Southwell barn for conversion?

Recordings can establish activity nearby. An inspection and, where appropriate, observations of the building are needed to assess how bats use its fabric.

Will integrated boxes resolve a woodland crossing issue?

Boxes provide potential roosting opportunities. The crossing design needs its own assessment of shelter, lighting and continuity.

Why keep the observer’s notes as well as call files?

They can show whether a bat followed the woodland edge, crossed the opening or passed out of sight. Keep the observation time so the evidence can be compared.

Local evidence / Practical design

Discuss your Newark and Sherwood project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal