At Campion Drive in Guisborough, the bat report found different activity levels at two detectors on the same site. This is a useful example of why Redcar and Cleveland development briefs should identify the particular hedge, beck crossing or woodland edge affected.

Check the North York Moors planning boundary, adopted N4 policy and the evidence behind local survey examples.

Discuss your Redcar and Cleveland project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

First check the boundary: the North York Moors exception

Redcar and Cleveland council boundary
The inset locates Redcar and Cleveland in Tees Valley. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryNorth York Moors National ParkScale bar · 5 km

Local context · Redcar · Marske · Saltburn · Guisborough · Skelton · Eston · South Bank

Enlarge map · Tees Valley locator
The inset locates Redcar and Cleveland in Tees Valley. North is up. The scale bar applies to the main map.
Redcar and Cleveland council boundary. The inset shows its position in Tees Valley. North is up. The scale bar applies to the main map.

Understand the setting

Your local planning area

Redcar and Cleveland Borough Council acts as the local planning authority for most ordinary development within its area. Land inside the North York Moors National Park, however, normally falls under the National Park Authority's planning functions. This distinction can matter near Guisborough and the eastern and southern borough edges. The national park boundary is not the borough boundary.

A Tees Valley postcode, a North Yorkshire historic place description or a view of the moors does not determine which planning policy applies. Check the red-line boundary against official planning maps before relying on the validation checklist or a protected landscape policy.

Map scope ONS December 2025 council boundary. Tees Valley context; the Park overlay marks the National Park part of the borough. Place names are an orientation list, not plotted locations. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0. Park boundary © Natural England. National Parks (England) dataset.

The borough's adopted Local Plan covers its planning area outside the National Park. Inside the Park, review the National Park's adopted Local Plan, biodiversity planning advice and Dark Skies Supplementary Planning Document where relevant. Neither document automatically establishes that a bat roost exists on the proposal site.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography. This orientation map does not replace the council’s policies map.

National Park boundary: Natural England designated-area data, Open Government Licence v3.0. Simplified to 35 metres for this orientation map; check the official boundary for your site.

Sources: Planning and biodiversity advice · Redcar and Cleveland adopted Local Plan, May 2018

Local evidence / Practical design

Why local landscape context shapes the survey question

Redcar and Cleveland joins an industrial and coastal landscape to inland woods, villages, agricultural land and moorland edges. A steelworks redevelopment, a Saltburn roof conversion and a Guisborough farm-building change are not variations of the same ecological problem.

Guisborough: agricultural buildings and mature trees

Barns, outbuildings, roof timbers, older walls and farmyard trees may contain features that need checking. A proposed change of use might preserve the shell while altering soffits, roof linings, ventilation and access points. The assessment should show which features will be disturbed and what could be kept.

Where an access road or parking layout affects trees, an arboricultural survey and a bat assessment answer different questions. Coordinate them, rather than assuming a protected tree is necessarily a roost or an unprotected tree is ecologically irrelevant.

Saltburn and Skelton: wooded valley and town edges

The Saltburn Valley woodland along Skelton Beck provides habitat context for neighbouring development. A nearby garden or commercial scheme could change edge lighting or tree connections, but proximity alone is not evidence of a roost. Assess the real exposure of the features involved.

Redcar, South Bank and Eston: industrial sites and redevelopment

Large buildings, workshops, service corridors and illuminated yards can raise multiple questions. Some might have negligible roost potential but still affect flight routes or nearby retained habitats. Others might have relevant gaps, plant-room structures or roof crevices. Do not dismiss potential because the site is industrial; equally, do not prescribe repeated emergence surveys without justified impact pathways.

Sources: Bats: advice for making planning decisions · Bat Surveys for Professional Ecologists: Good Practice Guidelines, fourth edition · Street lighting disturbs commuting bats

Local evidence / Practical design

Which bat survey answers which question?

Carry the station identifier into the design review

For a beck crossing, compare the final clearance width and lighting with the northern station and its connected hedge. Use the deployment dates and effort when interpreting the counts. Avoid converting higher activity into a claim about the number of individual bats.

Affected elementStarting evidenceWhat may be needed next
Roof stripping, demolition or conversionBuilding preliminary roost assessmentSeasonal emergence evidence where features and impacts justify it
Trees with potential cavities, splits or lifted barkTree-specific bat assessmentTargeted closer inspection or justified emergence work
New streetlights, access and habitat clearanceEcological appraisal of routes and light exposureTargeted commuting/activity surveys and a lighting design
Existing report from an earlier projectReview methods, site changes and limitationsUpdate survey or revised mitigation where needed

A preliminary roost assessment is often a sensible first stage. It can record features and signs, but inaccessible spaces must be clearly marked as such. A later emergence survey may investigate roost use. A detector pass documents activity and should not be converted into an exact number of animals.

Use the active season intelligently

Some preliminary inspections can take place throughout the year if safe access permits. Where emergence or landscape activity surveys are required, seasonal timing, night-vision coverage, weather and survey effort matter. Scope this early in the design programme to avoid making a planning application with missing information.

Record uncertainty rather than inventing confidence

A 'potential roost feature' is not a confirmed roost. Likewise, an acoustic identification of a species group may be less certain than a clear observed emergence. Reports should retain original dates and methods; older surveys are not automatically current proof of a site's condition.

Sources: Bats: advice for making planning decisions · Bat Surveys for Professional Ecologists: Good Practice Guidelines, fourth edition · Street lighting disturbs commuting bats

Local evidence / Practical design

What does adopted policy N4 require?

The Redcar and Cleveland Local Plan 2015–2032, adopted 24 May 2018, remains the operative borough development-plan document outside the National Park, alongside other relevant adopted policies. Policy N4: Biodiversity and Geological Conservation provides a key basis for considering biodiversity and protected-species impacts. N2 covers green infrastructure; N1 addresses landscape. Other policies may apply according to the location and project.

For a proposal that could affect bats, demonstrate how survey evidence informs avoidance, mitigation and connected habitat treatment. Show retained features and protection measures on drawings. BNG accounting is a different requirement from assessing a protected roost; one does not substitute for the other.

Redcar and Cleveland's 2026 new-plan timetable has changed significantly from the January 2025 Local Development Scheme. Following the Council's autumn 2026 decision to begin preparation under the new plan-making process, an initial scoping consultation runs from 16 November to 18 December 2026. This is emerging work, not a new adopted Local Plan. Do not quote the superseded 2025 plan timetable as the current position.

The joint Tees Valley minerals and waste plan has its own plan-making programme, not interchangeable with the borough's full Local Plan. Verify who handles a minerals/waste application before applying ordinary household validation assumptions.

Sources: Redcar and Cleveland adopted Local Plan, May 2018 · Local Plan scoping consultation

Local evidence / Practical design

A real New Marske example: activity is not the same as emergence

An ecological impact assessment dated 23 February 2026, prepared by Lucion for land north of Longbeck Lane, New Marske, accompanies R/2026/0271/OOM. It describes a preliminary survey in November 2024 and building emergence work during May and June 2025. The applicant's ecologist assessed one building as having moderate roost potential and another low potential. No bat emergence was recorded from the examined structures during those visits.

Nevertheless, surveyors recorded common pipistrelle commuting/foraging, with noctule also recorded in the site context. The report noted hedgerows as potential flight and feeding habitat. That is a useful distinction: activity around buildings can occur without a confirmed roost within those buildings. It does not prove that a later or nearby property is bat-free, and call recordings must not be treated as a census.

As of the planning register check, the application is a valid outline application with no issued decision recorded. Its environmental report is the applicant's evidence, not the Council's final conclusion or a Natural England licence. The correct lesson is to preserve the survey dates and results, identify connections and judge the likely impacts of the actual proposed development.

A Guisborough conversion under consideration

The register for R/2026/0022/FF, Church Lane Farm, concerns conversion of agricultural buildings to offices. Its published bat report describes August–September 2020 fieldwork for an earlier residential proposal, rather than new surveys undertaken in 2026. The report records brown long-eared roost use and common pipistrelle activity, and proposes a licensing and mitigation approach.

That is valuable historical evidence, but neither the report’s appearance in a 2026 file nor its proposed licence route proves present occupancy, an issued licence or approval of the changed scheme. On 23 November 2026 the register displayed a valid application with no decision entered. The next question is whether updated evidence and the actual office-conversion design address the known historical roost. [7] [8]

Sources: Ecological Impact Assessment: land north of Longbeck Lane New Marske · R/2026/0271/OOM Land north of Longbeck Lane, New Marske · Church Lane Farm: historical 2020 bat report · R/2026/0022/FF Church Lane Farm, Guisborough

Two detectors gave different results at Campion Drive

The applicant’s survey recorded markedly higher activity at the northern hedgerow H3 beside Hutton Beck than at H8 on the south-eastern woodland edge. The report also describes proposed culverting at the existing bridge. A site-wide average would obscure the difference between those two monitored locations and make the crossing harder to assess.

Campion Drive bat report on the council planning register

Local evidence / Practical design

Can you avoid impacts through design?

Original ACP evidence guide based on two public Redcar and Cleveland reports. No roost coordinates or population estimates are displayed.
Enlarge the Redcar and Cleveland design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Original ACP evidence guide based on two public Redcar and Cleveland reports. No roost coordinates or population estimates are displayed.
Original ACP evidence guide interpreting the dated sources linked on this page. It is not a site plan, licence or approval for your project.

Start with avoidance

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Bring the disciplines together

Use the same drawing revision for ecology, architecture, arboriculture and lighting. Include temporary access, roof opening and construction lighting, then record the advice in a form contractors can use.

Avoidance should be considered before committing to compensation or installation of boxes. A designer might retain a section of roof, keep mature trees away from new access, limit the hours of floodlighting or shift a building away from a dark habitat edge. Whether these steps remove a survey or licensing need depends on competent, project-specific assessment.

Roof fabric and working methods

Mark the affected tiles, soffits, brick gaps, roof voids and ventilation points. Include the temporary works, scaffolding and any night construction. If a roost feature may be affected, assess whether the function and access can be retained in a practical building detail.

Rural access and tree features

A ground-level tree inspection may identify cavities that need closer evaluation. Tree protection needs to survive changes in service trenches, road geometry and working space. The presence of a woodland designation does not replace inspection of individual affected features.

Lighting and habitat links

Designers should consider whether lighting is necessary, where it falls, how long it operates and what vegetation or water it reaches. The 2009 Stone, Jones and Harris experimental study illustrates behavioural effects of street lighting on commuting bats; it is not a Redcar-specific species record or a universal lighting limit.

Sources: Bats: advice for making planning decisions · Bat Surveys for Professional Ecologists: Good Practice Guidelines, fourth edition · Street lighting disturbs commuting bats

Local evidence / Practical design

Local nature recovery and records

The Tees Valley Local Nature Recovery Strategy was under consultation in September–October 2026. The Tees Valley Combined Authority's site described December 2026 publication as anticipated subject to approval. It is therefore inappropriate to call the strategy adopted in this research dated 23 November. When approved, its mapped priorities can inform landscape design, but do not show exact bat roosts.

Regional records held by biodiversity organisations can provide relevant context. However, no current Redcar-and-Cleveland bat population estimate was verified in this pack. Published species records, detector calls, individual animals and occupied roosts must remain separate evidence categories.

Sources: Tees Valley Local Nature Recovery Strategy

Local evidence / Practical design

What should the survey report tell your team?

A well-written report identifies the site and proposal, competence, fieldwork dates, survey methods, equipment and conditions. It records inspected and inaccessible features, distinguishes confirmed roost evidence from activity, evaluates impacts and explains residual uncertainty.

It should then say who must act: the architect, contractor, tree consultant, lighting designer or planning agent. Record any needed further seasonal work, design changes, relevant conditions and potential licence route. Planning permission, a Natural England mitigation licence and discharge of a planning condition are separate decisions.

Where evidence is incomplete, the report should say which additional information would change the conclusion. A generic bat-box paragraph cannot replace this explanation.

Sources: Bats: advice for making planning decisions · Bat Surveys for Professional Ecologists: Good Practice Guidelines, fourth edition · Street lighting disturbs commuting bats

Local evidence / Practical design

Redcar and Cleveland bat survey questions

Does my Guisborough barn conversion need a bat survey?

Possibly. A targeted assessment should examine affected roof or wall features and the conversion design; location alone does not decide.

Does the borough council decide applications inside the North York Moors National Park?

For ordinary development there, the National Park Authority generally acts as planning authority. Confirm the site's actual boundary and application type.

Is Policy N4 still relevant?

Yes. It belongs to the adopted 2018 Redcar and Cleveland Local Plan outside the Park, subject to the site's complete development-plan context.

Has the replacement Local Plan been adopted?

No. A new scoping consultation was running in November–December 2026, not an adopted plan.

Can bat calls in a field prove a nearby building is a roost?

No. Commuting and foraging activity are different from evidence of emergence or occupation of a structure.

Can the quieter Campion Drive detector represent the Hutton Beck crossing?

The report found different activity at the two stations. Identify which station sampled habitat relevant to the crossing and explain any mismatch. Averaging across both stations could hide the effect on the more frequently used edge.

Local evidence / Practical design

Prepare the right application information

The council publishes a 2015 local validation list. Treat its date honestly and confirm the current submission checklist before applying. Inside the National Park, use the Park Authority’s application and biodiversity guidance. A county boundary is not a substitute for identifying the correct decision-maker.

Sources: Redcar published local validation list, 2015 · Planning and biodiversity advice

Local evidence / Practical design

Survey methods and practical next steps

Local evidence / Practical design

Discuss your Redcar and Cleveland project

Revising a layout beside Hutton Beck

Send the crossing section and revised hedgerow clearance. Include original station locations and survey effort with any earlier activity report, so differences between northern and southern positions remain visible.

Discuss your proposal