Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Rushcliffe / Surveys · Design advice · Planning

Bat surveys in Rushcliffe

At Ratcliffe-on-Soar, the power station redevelopment documents show how lighting, green corridors and airport safeguarding can meet in one design brief. Nearby, the Thrumpton minerals case concerns survey evidence and the county planning process. They give different starting points for a Rushcliffe development team.

See the local planning examples

Discuss your Rushcliffe project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Rushcliffe: place the proposal in its local setting

Rushcliffe council boundary
The inset locates Rushcliffe in Nottinghamshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km
Enlarge map · Nottinghamshire locator
The inset locates Rushcliffe in Nottinghamshire. North is up. The scale bar applies to the main map.
Rushcliffe council boundary. The inset shows its position in Nottinghamshire. North is up. The scale bar applies to the main map.

Where the Soar meets the Trent and former industrial land

Rushcliffe Borough Council includes West Bridgford, Ruddington, Keyworth, Bingham, Radcliffe-on-Trent, East Leake and the Ratcliffe-on-Soar area. Nottingham City, Broxtowe, Gedling and neighbouring districts are separate planning authorities. A 'Nottingham' postal address does not determine the applicable validation list.

Local context · West Bridgford · Ruddington · Bingham · Keyworth · East Leake · Trent / Soar · Ratcliffe context

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Rushcliffe’s Policy 17 and Policy 38

Current framework

Rushcliffe’s adopted framework includes the 2014 Core Strategy, with Policy 17 Biodiversity, and the 2019 Local Plan Part 2, including Policy 38 on non-designated biodiversity assets and the wider ecological network. Read these with the site’s allocation and policies map. [1; 4]

Rushcliffe’s own plan and the joint strategic plan

Reviewed 26 November 2026

Two processes need to be distinguished. The Greater Nottingham Strategic Plan was submitted in December 2025 and had hearings in July 2026. Rushcliffe’s separate new Local Plan passed Gateway 1 on 31 October 2026. Its scoping consultation has closed; the Call for Sites runs until 8 January 2027. Neither is an adopted replacement. [2; 3]

Roof and eaves triggers in the validation scheme

Supporting information

Rushcliffe revised its Local Scheme of Validation in January 2026. Its roof and building triggers include roof removal or raising, poor-condition eaves and unused buildings. In some circumstances, suitable internal and external photographs can support a reasoned justification that a roost survey is unnecessary. Photographs alone are not ecological clearance. [4]

How to read the Thrumpton consultation response

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [7]

Local evidence / Practical design

What a green corridor requires on a working site

A route shown in green between development plots may have to pass a service yard, an access road and separate occupiers’ security lights. Around Ratcliffe, test each interface in section. Along a Ruddington roofline, by contrast, it may be one opening and its immediate dark approach that determine the advice.

Local evidence / Practical design

Thrumpton gypsum works: the borough’s ecology response

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Thrumpton: read activity evidence at the right scale

The 9 January 2025 committee pack describes six bat species reported from activity and static-detector surveys for a gypsum extraction proposal. It also discusses tree-roost potential and woodland habitat. Six species is not six animals, and the original identifications were not independently reanalysed. [6]

A consultation response is not the minerals decision

Rushcliffe’s ecology response concerns a proposal in the county minerals-planning process. It discusses retention, construction and bat-sensitive lighting. Keep that response distinct from a signed minerals permission or protected-species licence, and check the evidence against the final access and lighting design. [6]

Local evidence / Practical design

Ratcliffe-on-Soar: the lighting design crosses several responsibilities

The Local Development Order design material in Rushcliffe’s council papers calls for directed and shielded lighting, attention to woodland and green corridors, and liaison with the council and East Midlands Airport on safeguarding. A lighting plan for one plot can meet its own operational brief while leaving effects at the adjoining plot boundary unresolved.

Rushcliffe council papers, Ratcliffe-on-Soar Local Development Order design material

Retain / Adapt / Assess the remaining effects

Design options for Rushcliffe roofs and the Trent–Soar corridor

Rushcliffe conceptual guide distinguishing roof assessment, habitat impacts and review of evidence. No automatic exemption or fixed survey package is implied.
Enlarge the Rushcliffe design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Rushcliffe conceptual guide distinguishing roof assessment, habitat impacts and review of evidence. No automatic exemption or fixed survey package is implied.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Ruddington roof replacement

Send roof/eaves photos and existing/PRA reports early. If an assessed entrance can be retained, redesign roof work and construction access rather than assuming a box will replace an occupied roost.

Keep photographs tied to the application drawings and explain any inaccessible spaces. Show the extent of stripping and temporary access. Where uncertainty remains, agree the necessary evidence rather than assuming the photographic exception will cover the entire proposal.

West Bridgford conversion

Check mortar joints, tile gaps and loft access that will be disturbed. Keep the borough validation checklist and any previous reports together with new plans.

Review the survey date against any intervening roof repairs or new lighting. The council’s advice on report age is a prompt to assess validity. It is not a single national legal expiry date for all bat evidence.

Thrumpton or Ratcliffe landscape works

Protect viable wooded/hedgerow connections with evidence-based layout, lower need for night lighting and construction phasing; keep minerals and district planning roles distinct.

Trent and Soar development

Assess bridge and bankside vegetation, drainage works and evening lighting where the proposal reaches water margins; do not assume a bat population from waterside location alone.

Local evidence / Practical design

Which evidence answers a phased redevelopment question?

For an existing industrial site, map light reaching the retained habitat before demolition and at each new phase. At Thrumpton, the minerals evidence instead considered use of woodland, trees and the wider extraction site. Record who determines the application and which survey supports each individual effect.

Survey guides: Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Designing the join between two lighting schemes

Show light from both plots at a shared green corridor. Agree a common calculation surface and which operating settings will be tested. An operator assessing only its own contribution may miss combined spill where a retained route crosses the service road.

Local evidence / Practical design

What the first occupier should hand to the second

Keep the approved fitting schedule, operating times and checks at the habitat edge. Mark which assumptions depend on a neighbouring phase or an operator’s controls. If later plots need brighter security lighting, return to the agreed ecological limits and safeguarding requirements at that boundary.

Further reading: survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

Rushcliffe bat survey questions

Does the Ratcliffe design material prove bats use every green corridor?

No. It establishes design considerations for the site. Surveys are needed to identify which features bats use and how proposed changes could affect them.

Why is East Midlands Airport relevant at Ratcliffe?

The council papers require liaison on aerodrome safeguarding for lighting schemes. The lighting designer must also address ecological spill and the operator’s needs.

Who decides a mineral extraction proposal at Thrumpton?

The county undertakes the minerals planning function. Rushcliffe’s consultation response is evidence in that process and is separate from an issued minerals decision.

Do six bat species in a report mean six individual bats?

No. Species richness counts the different taxa reported. Detector passes and individual animals are different measures.

What if a new path approaches a power station green corridor?

Show the path alignment and lighting through the full operating period. Test the crossing and its approaches rather than relying on an average for the plot.

How does Rockley Park box monitoring help?

A check can tell you about the inspected boxes at the time of the visit. It cannot establish how many bats occupy all suitable features in Rushcliffe.

Local evidence / Practical design

Discuss your Rushcliffe project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal