Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

South Kesteven / Surveys · Design advice · Planning

Bat surveys in South Kesteven

At Barrowby, residents’ footage and an arboricultural assessment raised different questions about bats and trees. Further south, the Mallard Pass solar assessment considered a hedge connection across the South Kesteven–Rutland boundary. Both examples show why an observation needs to be tied to a particular feature before a layout is fixed.

See the local planning examples

Discuss your South Kesteven project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

South Kesteven: place the proposal in its local setting

South Kesteven council boundary
The inset locates South Kesteven in Lincolnshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km
Enlarge map · Lincolnshire locator
The inset locates South Kesteven in Lincolnshire. North is up. The scale bar applies to the main map.
South Kesteven council boundary. The inset shows its position in Lincolnshire. North is up. The scale bar applies to the main map.

From Grantham and Belton to the Rutland boundary

South Kesteven District Council determines local applications across Grantham, Stamford, Bourne, Market Deeping and many rural parishes. The south-west edge has different landscape and building features from the fen margins near Bourne and the Welland corridor. Sites described as Stamford can also straddle wider planning contexts; identify the actual council boundary and any neighbouring authority separately.

Local context · Grantham · Stamford · Bourne · Market Deeping · Welland / village-edge context

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

EN2 and EN3 in South Kesteven

Current framework

The South Kesteven Local Plan 2011–2036 was adopted in January 2020. Policy EN2 addresses biodiversity and geodiversity, and EN3 green infrastructure; relevant tree, historic environment and design policies also depend on the actual site. Use the statutory plan and adopted policies map with national bat protection, rather than a one-size-fits-all bat survey rule. [11]

South Kesteven’s new plan timetable

Reviewed 26 November 2026

On 21 July 2026, the council resolved to cease its former Local Plan Review and move to the new plan-making framework. The current timetable took effect on 28 October 2026. The call for sites closes on 9 December 2026; scoping is scheduled for 6 January–3 February 2027. These are programme stages, not adoption. [1; 2]

Information for a South Kesteven application

Supporting information

Check the council’s application requirements for the actual development type. Roof changes, tree removal, access and night lighting can require ecological evidence before determination. Keep this species assessment separate from statutory BNG and its metric. [4]

Barrowby tree works and survey limitations

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [4]

Local evidence / Practical design

Why the two sides of a hedge gap matter

The Mallard Pass assessment considered the role of a parallel hedge when evaluating removal along a linear route. For a new South Kesteven scheme, check where an alternative hedge actually begins and ends. Two lines close together on a map can be separated by an exposed field entrance or a lit road.

Local evidence / Practical design

What the Barrowby committee heard about bats and trees

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Barrowby: different evidence can answer different questions

The 23 October 2025 minutes for S25/1679 record residents showing videos of bat activity and discussion of survey findings. The record distinguishes ground-level tree assessment from possible follow-up work. Public observations are useful leads, but the minutes do not independently verify species identification or a tree roost. [3]

Resolve uncertainty before irreversible tree work

Describe the exact pruning or removal and the affected potential roost features. Ask whether observations establish activity nearby or use of a specific feature. Survey timing, access and detection limitations should inform follow-up. Neither one non-detection nor an unverified video establishes a reliable population estimate. [3; 5]

Local evidence / Practical design

Mallard Pass: what the applicant assumed about the parallel hedge

The scheme-wide ecology chapter considered the loss of about 75 metres of species-rich hedgerow by the Macmillan Way at Essendine, in neighbouring Rutland. The applicant’s assessment relied in part on a parallel hedge continuing to provide a connection. This is a cross-boundary design example. It is neither a standard acceptable gap nor a measured crossing distance for bats.

Mallard Pass Solar Farm environmental statement, ecology chapter, paragraph 7.5.22

Retain / Adapt / Assess the remaining effects

Retaining Stamford roof features and Barrowby trees

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the South Kesteven design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Stamford listed-house roof repairs

Coordinate heritage fabric protection and bat survey access; investigate retaining a functional entry detail where evidence confirms use rather than replacing every crevice with a box.

Coordinate the conservation roof detail with the bat evidence. Show where insulation ends at the eaves and how scaffold sheeting would affect the approach.

Barrowby tree works

Record potential roost features in veteran or mature limes, the exact cut/prune actions, and any staged survey approach. Distinguish summer movement observations from tree-roost proof.

Put observer positions, sighting times and tree references on the same plan. Where an observation could relate to two neighbouring trees, record that uncertainty.

Uffington or village-edge housing

Retain hedgerows and scrub connecting to surrounding habitat, relocate an access if practical and specify lights to avoid unnecessary exposure of an assessed corridor.

Grantham commercial conversion

Inspect soffits, cladding gaps, roof interfaces and associated trees before demolition or a change to 24-hour security lighting.

Local evidence / Practical design

How can a Barrowby sighting help scope work on a tree?

Ask where the observer stood, the time, direction of travel and whether the bat was seen leaving the tree itself. Plot the sighting against the tree schedule. It may identify a useful viewpoint for further work even when it cannot identify an occupied feature.

Survey guides: Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Alders, field entrances and security lighting along a route

Test the narrowest point in the proposed dark connection. If a design relies on two parallel hedges, trace both approaches past any lights, access gates and breaks in cover. A diagram showing only the retained middle lengths can overstate the value of the diversion.

Local evidence / Practical design

Giving the planning team an auditable design assumption

State which lengths of hedge must remain for the predicted effect to hold. Include protection during excavations, lighting controls and a review point if access moves. On a cross-boundary scheme give the same feature the same identifier in both authorities’ drawings.

Further reading: survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

South Kesteven bat survey questions

Is 75 metres an acceptable hedge gap for a South Kesteven proposal?

There is no such allowance in the Mallard Pass example. Its assessment relied on the particular layout and adjacent cover on that scheme.

Was the Macmillan Way example in South Kesteven?

The cited hedge was at Essendine in Rutland. Mallard Pass spans both authorities, so use the survey plan to place each individual example.

Can residents’ bat videos identify a tree roost?

They can provide a good lead. The key question is whether they show emergence from a particular feature or a bat passing the canopy.

Why keep a Stamford roof detail with the survey evidence?

Insulation, flashing, scaffold and weather protection can affect an opening differently. A roof plan alone may not show which detail the contractor will disturb.

Can Belton Estate records be applied to a nearby garden?

They give local context. The habitat, connections and survey effort at the garden determine what conclusions can be drawn there.

Which plan applies while the replacement is being prepared?

South Kesteven Council identifies its adopted 2011–2036 Local Plan as the current framework. Check the relevant policies map and proposal-specific requirements.

Local evidence / Practical design

Discuss your South Kesteven project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal

Connected guidance

Connect local and national advice

See the Lincolnshire county guide for wider landscape context and the England hub for the national route.

Our main bat survey service explains the process. Planning permission, habitat BNG and protected-species licensing remain distinct matters.