Bat surveys in South Tyneside

Bat evidence in South Tyneside can turn on which side of a building is being altered. A Cleadon house assessment distinguished the affected roof from crevices elsewhere, while the college redevelopment needed evidence across an entire campus.

See the local planning examples

Discuss your South Tyneside project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

Check the actual planning authority and what the work affects

South Tyneside council boundary
The inset locates South Tyneside in Tyne and Wear. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 2 km
Enlarge map · Tyne and Wear locator
The inset locates South Tyneside in Tyne and Wear. North is up. The scale bar applies to the main map.
South Tyneside council boundary. The inset shows its position in Tyne and Wear. North is up. The scale bar applies to the main map.

Understand the setting

Cleadon Hills, South Shields and the college campus

South Tyneside Council is the planning authority for South Shields, Jarrow, Hebburn, Cleadon and the Boldons. It is separate from North Tyneside on the other side of the Tyne and from Sunderland to the south. A project near an administrative boundary must use the correct planning register and adopted map. [1] [2]

Local context · South Shields · Jarrow · Hebburn · Cleadon · Boldon · Whitburn

Map scope ONS December 2025 council boundary with Tyne and Wear context. County context is geographic and does not determine the planning authority. Names provide orientation, not plotted locations. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography. This orientation map does not replace the council’s policies map.

Local evidence / Practical design

Shelter matters on an exposed site

Local setting

The River Tyne estuary, South Shields coastal townscape, mature green spaces around Cleadon and built-up roof and industrial heritage across Jarrow and Hebburn raise different issues for roost use, commuting and associated lighting. International coastal designations can trigger their own ecological tests without proving bats are present in a particular building. [2] [3]

What to check in the field

On Cleadon Hills a detector on the crest samples different conditions from one beside sheltered vegetation. For work at a path junction, mark the leeward approach and changes in ground level. Record wind direction alongside the observations so quieter spells on the exposed side can be interpreted.

Local evidence / Practical design

South Tyneside’s adopted 2023–2040 Local Plan

Adopted plan and policies

The South Tyneside Local Plan 2023–2040 was adopted July 2026 and is the planning starting point, not an emerging proposal. Policy 33 Biodiversity, Geodiversity and Ecological Networks concerns avoidance and mitigation, Policy 34 Internationally, Nationally and Locally Important Sites covers designated sites, Policy 35 Delivering Biodiversity Net Gain concerns the statutory biodiversity framework, and Policy 36 Protecting Trees, Woodland and Hedgerows is relevant where features are affected. Apply policy wording and site allocations together. [2]

Trees and the biodiversity metric

The site's ecology must be assessed separately from a habitat metric: Policy 35 does not provide permission to disturb an occupied roost. A mature tree protected under Policy 36 may also warrant specific roost-feature assessment, but a tree designation is not a record of bat occupancy. [2] [7] [3]

Subregional habitat strategy

The South of Tyne and Wear Local Nature Recovery Strategy was formally adopted in September 2026 and covers the Sunderland–Gateshead–South Tyneside area. It offers strategic guidance about habitats, not a distribution map of bats at individual properties. The shared Tyneside validation checklist explicitly includes South Tyneside; section 16 concerns biodiversity surveys and reports. Check its application-specific triggers. East Boldon’s neighbourhood plan was made in December 2021 and Whitburn’s in September 2022; each applies within its own boundary. [8] [2] [9] [10]

Local evidence / Practical design

How the college allocation affects the tree plan

The adopted plan lists the former South Shields campus as allocation H.7 and calls for mature trees to be retained in line with Policy 36. Overlay the numbered arboricultural survey on the lighting and construction plan. Mark any tree whose access, roots or shelter would be affected even where the stem is retained. Read the H.7 allocation.

Local evidence / Practical design

What the college campus and Cleadon House surveys recorded

ST/0676/23/FUL — South Tyneside College campus — Campus ecological appraisal and bat activity survey

Date and record: 2022 bat surveys; OS Ecology report December 2023.

Evidence actually described: Bat activity transects and static detectors, 37 monitoring nights, 36,513 acoustic records; mostly common pipistrelle calls, uncertain 50 kHz group and other pipistrelle records; seven potential roost trees not seven occupied roosts. [4]

Decision status: Applicant ecology report and methodology examined; application signed decision, ecology conditions and any protected species licence not independently established.

Cleadon House survey — 2025 survey-file index 250074 — Cleadon building roost assessment

Date and record: Site visit 24 February 2025; report dated March 2025.

Evidence actually described: The report found no signs in the inspected areas and assessed negligible potential in the affected roof and conservatory. It identified potential crevices elsewhere on the gable, outside the proposed works, and recommended no emergence surveys for that scheme. [5]

Decision status: Consultant survey PDF located; the original report’s findings have been checked; no issued planning decision or licence outcome is asserted.

ST/0357/24/FUL — Academy of Light solar — Energy project and revised ecological assessment

Date and record: Initial PRA 16 November 2022, ecology update March 2025, addendum June 2025.

Evidence actually described: Ecological Impact Assessment addendum describes updated survey context for a solar proposal, distinct from roost mitigation or a general roof inspection. [11]

Decision status: Ecology addendum reviewed as applicant evidence; signed permission, licence and implementation unverified.

Local evidence / Practical design

What the college appraisal adds to its acoustic totals

The amended December 2023 appraisal for South Tyneside College covers a campus with buildings, scrub, woodland and three ponds. Of 13 buildings, the authors rated seven moderately suitable for roosting, three low and three negligible. Those ratings describe suitability. It reports no roosts recorded in the assessed trees. A reader can therefore ask which tree and survey method support a proposed removal without treating a campus-wide call total as tree-roost evidence.

South Tyneside College amended ecological appraisal, December 2023

Local evidence / Practical design

Specifying a roof survey in Cleadon

The Cleadon House survey described potential crevices elsewhere on a gable but judged the affected roof and conservatory negligible for the particular works. Before reusing that advice, mark the gable on the tender elevation and check flashing, scaffold fixings and access. An apparently minor extension of repointing can change the survey question.

Local evidence / Practical design

Four practical ways to avoid or reduce impacts through design

Original interpretation diagram distinguishing acoustic records, suitable trees and roost evidence, based on the publicly submitted OS Ecology College report.
Enlarge the South Tyneside design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Original interpretation diagram distinguishing acoustic records, suitable trees and roost evidence, based on the publicly submitted OS Ecology College report.
Original ACP conceptual illustration. It shows design questions, not a measured property, verified roost or approved mitigation scheme.

South Shields roof or heritage conversion

Start with roof void and exterior junctions in the affected parts; explain inaccessible areas. Preserve any demonstrated roost entrances through careful roof detailing and lawful sequencing, rather than assuming a replacement box is equivalent.

Jarrow or Hebburn industrial regeneration

Separate the demolition risk to older buildings from the value of trees, woodland fragments and river-edge corridors. Put temporary construction lighting in the ecological drawings.

Cleadon and Boldon mature-tree setting

Assess potential roost features and dark links before locating new access or lighting. Tree retention reduces a potential impact, but cannot be claimed to eliminate all bat effects without evidence.

South Tyneside College-type campus redevelopment

Inspect each affected structure, distinguish building suitability classes and detector methodology, retain landscape connections where feasible, and avoid reporting detector records as individual counts.

Local evidence / Practical design

Locating lights around campus housing

Start at the boundary where a tree belt meets a sheltered gap between buildings. Check the view from each end before fixing paths or car-park lighting. If layouts are phased, record when screening is removed and when replacement planting will actually provide cover.

Local evidence / Practical design

Research, conservation and local nature recovery

South Tyneside's 2026 adopted Policy 33 and site policy map frame the avoidance and ecological network question. The South of Tyne and Wear LNRS provides a separate strategic evidence layer; some ecological opportunities cross the boundary into Gateshead and Sunderland, but a South Tyneside applicant must still apply the correct local authority's plan and protected species requirements. The College bat report demonstrates why rigorously stating methods and acoustic confidence is more authoritative than a superficially impressive bat-count figure. [2] [9] [4]

Local evidence / Practical design

When an updated scheme needs new observations

For the Academy of Light solar proposal, the public addendum followed earlier assessment work. Track the date of each drawing beside the survey it relies on. If the construction access shifts, recheck that strip for affected habitat even where the array itself has barely moved.

Local evidence / Practical design

South Tyneside bat survey questions

What did the 36,513 records at the college measure?

They were acoustic records across the monitoring programme. Use the recorded effort and detector positions to interpret activity. They do not give a count of individual bats living on campus.

Why did the Cleadon House survey distinguish the gable?

The report treated features beyond the affected roof differently from the roof and conservatory themselves. A change in the works needs review against that boundary.

Does an exposed coastal site always have little bat activity?

A crest and a sheltered approach can give different results. Identify where the proposal alters shelter and put observation points where they can test that change.

Should every potential tree feature be treated as occupied?

Potential identifies a feature needing consideration. Record what inspectors could see, any signs found and whether the works affect the feature before determining further action.

Can I use solar-array survey results for a new access?

Check whether the access and temporary working width were included in the survey. A cable trench or construction road may cross habitat outside the assessed panel layout.

What should be marked on a phased campus plan?

Identify tree retention, demolition, new luminaires and temporary compounds for each phase. Show how the sheltered route functions before replacement landscaping matures.

Local evidence / Practical design

Survey methods and practical next steps

Local evidence / Practical design

Discuss your South Tyneside project

Send the details that shape the advice

Share your site boundary, drawings, photographs, earlier reports and council comments. Include roof, tree and demolition works, temporary access, lighting and intended dates.