Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Stockton-on-Tees / Surveys · Design advice · Planning

Bat surveys in Stockton-on-Tees

At Thorpe Wood, council records identify the year and extent of earlier pond restoration. That gives a useful starting point for a new maintenance job. Check what open water, bank vegetation and access routes exist today before treating a historical project boundary as the survey area.

Understand Stockton’s own planning framework, habitat connections and the difference between observations, survey findings and decisions.

Discuss your Stockton-on-Tees project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

One borough, several development settings

Stockton-on-Tees council boundary
The inset locates Stockton-on-Tees in Tees Valley. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 5 km
Enlarge map · Tees Valley locator
The inset locates Stockton-on-Tees in Tees Valley. North is up. The scale bar applies to the main map.
Stockton-on-Tees council boundary. The inset shows its position in Tees Valley. North is up. The scale bar applies to the main map.

Understand the setting

Your local planning area

Stockton-on-Tees is a unitary local planning authority. Its area includes Stockton, Thornaby, Billingham, Eaglescliffe, Yarm and more rural areas. It extends across the Tees corridor and is not simply the built-up centre of Stockton. Although neighbouring Tees Valley authorities share some regional strategies, each normally makes its own local planning decisions.

Local context · Stockton · Thornaby · Billingham · Eaglescliffe · Yarm · River Tees

Map scope ONS December 2025 council boundary. Tees Valley context: Stockton spans both sides of the River Tees. Place names are an orientation list, not plotted locations. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

River Tees and urban green links

The Tees, its tributaries, connected parks and remaining riverside vegetation are potential landscape contexts for bat feeding or movement. Yet a planning map of ecological networks does not demonstrate which bats use a particular site. The ecologist must distinguish suitable habitat, observed activity and actual roost evidence.

Yarm, Eaglescliffe and mature residential plots

Roof renovations, older masonry, sheltered gardens and mature tree lines can raise both building and tree questions. A new driveway may remove a tree with a cavity even if no roof work is planned. Conversely, a roof extension can affect an otherwise inconspicuous crevice. The first visit should be aligned with the architect's complete scheme.

Billingham, Thornaby and industrial development

Industrial roofs, warehouses, bridge structures and illuminated yards are not exempt from protected-species law because they are urban. Equally, the presence of green land nearby does not force a standard package of bat surveys. Assess the structures affected, night work, lighting, demolition and the actual habitat link that may change.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography. This orientation map does not replace the council’s policies map.

Local evidence / Practical design

What evidence should a Stockton bat survey provide?

Scope the temporary works alongside the pond

Identify the access width, night working and any branch removal needed to reach the bank. If the aim is to retain a sheltered flight line, show which cover will remain while machinery is on site, as well as after reinstatement.

Proposal questionInitial evidencePossible follow-up
Could roof replacement or demolition disturb a roost?Building preliminary roost assessment (PRA)Targeted seasonal emergence survey or design avoidance
Will tree clearance affect suitable roost features?Tree-specific bat assessment with arboricultural contextCloser inspection or appropriate observation
Will lighting or access alter a dark habitat connection?Habitat impact appraisal and lighting reviewProportionate commuting or activity data
Is an existing bat report appropriate for a changed scheme?Revisit evidence dates, features and limitationsUpdated survey only where needed

A PRA should record internal and external observations, accessibility and any signs. The absence of droppings in one part of a loft is not proof that all possible features were checked. Where a feature is suitable and the works could affect it, later survey work may be required at appropriate dates.

Emergence surveys versus activity surveys

An emergence observation looks for bats leaving a particular structure or feature. An activity survey addresses bats moving or feeding in habitat. These questions are related but not interchangeable. Detectors record acoustic events, not reliable numbers of individual bats, and some sound identifications are qualified.

Get the timing into the programme

A preliminary visit may be achievable outside the main bat-active season, but some emergence evidence cannot be safely or scientifically collected at arbitrary times. Buildings may become inaccessible as construction begins, so scope work before stripping roofs or clearing vegetation. Keep weather, surveyor positions, night-vision aids and limitations documented.

Sources: Bats: advice for making planning decisions · Bat Surveys for Professional Ecologists: Good Practice Guidelines, fourth edition · Street lighting disturbs commuting bats

Local evidence / Practical design

Stockton's adopted Local Plan and ENV5

Stockton-on-Tees adopted its Local Plan in 2019. It guides planning decisions across the borough to 2032, alongside the adopted policies map and other applicable documents. Its Policy ENV5: Preserve, Protect and Enhance Ecological Networks, Biodiversity and Geodiversity is especially important for species and connected-habitat effects. The policy addresses ecological networks and wildlife corridors, including the River Tees Corridor, Teesmouth and Central Farmland landscape contexts.

This does not establish that a site in one of those areas has a bat roost. It means the proposal should consider effects on relevant features and connectivity. In particular, a route can be functionally harmed by lighting, fragmentation or clearance even when the nearby trees remain standing.

Stockton is preparing a replacement Local Plan. The Council published its notice of intention to commence on 5 August 2026. Its Regulation 20 scoping consultation runs 23 October–4 December 2026. The current timetable forecasts later preparation stages through 2029, but future milestones are projections, not completed decisions. The adopted 2019 plan remains the operative reference until a lawful replacement takes effect.

A proposed joint Tees Valley minerals and waste plan is a separate process; it is not a joint Stockton housing/development Local Plan. Check which authority and policy stack apply to an individual scheme.

Obtain the up-to-date local validation checklist, including whether protected-species survey information is needed before determination. Do not copy another Tees Valley authority's submission rules.

Sources: Stockton adopted Local Plan, ENV5 · Local Plan scoping consultation

Local evidence / Practical design

Two Stockton planning cases that demand careful interpretation

A roof conversion and residents' bat observations

The public Planning Committee minutes for 25/1945/FUL, 74A Darlington Road, Stockton, dated 10 June 2026, record a proposal to alter the roof height for a loft conversion, install rooflights and cladding, and build extensions. During committee representations, concerns were raised that bats flew over the property and that a bat survey should be requested.

That was a representation by participants. It is not evidence that an ecologist confirmed a roost, or that planning officers accepted every assertion. The source demonstrates why complaints and scientific findings must be separated. The issued decision and underlying bat evidence were not verified in this research pack, so no outcome is claimed here.

The same June committee record resolved to refuse 25/1945/FUL for effects on neighbouring residential amenity. The recorded bat representation was not the stated refusal reason. [6]

A conditional delegation with a protected-species informative

For 25/0865/FUL, 2 The Willows, the 4 March 2026 committee record contains a general informative about bats and nesting birds. The committee delegated approval subject to the applicant changing a rear roof design; its resolution provided for refusal if that change was not agreed. This is not an unconditional permission or a verified issued decision.

The informative explains continuing wildlife responsibilities. It does not establish that a bat roost was recorded, that a particular survey was completed or that a Natural England licence exists. Check the issued notice and approved drawings before relying on the final planning outcome. [7]

Sources: Planning Committee 25/1945/FUL, 74A Darlington Road · Planning Committee 25/0865/FUL, 2 The Willows

What the Thorpe Wood pond record measures

A Stockton council scrutiny report records dredging and silt removal at Thorpe Wood in 2010/11, with 0.15 hectares of pond habitat restored. That figure describes the footprint of the work. It gives neither a bat count nor evidence of improved foraging. For a repeat operation, check both the water margin and any wooded route needed to move plant or spoil.

Read the Thorpe Wood project entry in the council scrutiny report

Local evidence / Practical design

Practical avoidance: roofs, trees and lighting

Original ACP interpretation diagram distinguishing reported sightings, planning informatives and site survey evidence.
Enlarge the Stockton-on-Tees design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Original ACP interpretation diagram distinguishing reported sightings, planning informatives and site survey evidence.
Original ACP evidence guide interpreting the dated sources linked on this page. It is not a site plan, licence or approval for your project.

Start with avoidance

We proactively discuss whether changing roof works, access, lighting or retained habitat could reduce impacts. Any reduction in survey work needs a sound ecological basis. A changed design does not automatically remove legal duties.

Bring the disciplines together

Use the same drawing revision for ecology, architecture, arboriculture and lighting. Include temporary access, roof opening and construction lighting, then record the advice in a form contractors can use.

Keep useful fabric where evidence supports it

A roof detail can often be studied before the specification is final. If a potentially occupied feature would be sealed, ask whether the design can retain access or avoid that part of the structure. A drawing should show the change, not simply promise to follow ecological advice later.

Keep the right trees and habitat edges

Work with the arboricultural drawing so the ecologist knows which tree features are affected by pruning, road access, foundations or temporary works. Tree retention is only meaningful if later contractor actions protect the feature and its function.

Light where necessary, not everywhere

A lighting assessment should record spill onto hedges, water, woodland edges and any relevant roost access. Consider fitting position, direction, switching, operating hours and construction lights. Experimental science shows that some bats alter commuting behaviour in response to street lighting, but no universal distance or illuminance level clears every scheme.

Plan for an unexpected discovery

Contractors should know whom to contact if a bat or potential roost is discovered during affected work. Stop the activity where necessary and obtain competent advice before disturbing the feature. Planning permission cannot make an unlawful disturbance lawful by itself.

Sources: Bats: advice for making planning decisions · Bat Surveys for Professional Ecologists: Good Practice Guidelines, fourth edition · Street lighting disturbs commuting bats

Local evidence / Practical design

Tees Valley nature recovery and usable records

The Tees Valley Combined Authority is the responsible authority for the region's Local Nature Recovery Strategy. A draft was consulted on in autumn 2026, and official publication was expected in December subject to approval. As at 23 November 2026, the website had not established final publication. A strategy opportunity map will help guide habitat proposals but is not a record of bat occupation.

A reliable desk study can use current environmental records appropriate to the site and records authority. However, this research did not obtain a Stockton-wide 2026 bat population census. Counts of detector passes, observed bats, occupied roosts and wider species records must not be added together as if interchangeable.

The environmental management literature supports considering feeding and commuting routes rather than focusing on roosts alone. Yet science from another part of England is not automatically a local Stockton species observation.

Sources: Tees Valley Local Nature Recovery Strategy

Local evidence / Practical design

What makes a bat report useful to Stockton's planning process?

A report should identify the project, site boundary, competence, survey dates, method, effort and conditions. It should describe affected features, signs, identification confidence and inaccessible areas. Where older reports exist, explain whether the building, habitat or development scope has changed.

It should then assess the impacts: loss of a roost, disturbance, obstruction of access, habitat fragmentation or artificial lighting. Recommendations should be practical and timed to the decisions: survey follow-up, layout revision, contractor instructions, mitigation, planning conditions or licensing where legally appropriate.

Separate avoidance, mitigation, compensation and enhancement. An integrated roost feature or bat box may be beneficial, but it cannot by itself replace the evidence for a damaged occupied roost.

Sources: Bats: advice for making planning decisions · Bat Surveys for Professional Ecologists: Good Practice Guidelines, fourth edition · Street lighting disturbs commuting bats

Local evidence / Practical design

Stockton-on-Tees bat survey questions

Is ENV5 a bat survey policy?

ENV5 is an adopted biodiversity and ecological-network planning policy. Survey need follows the likely impacts and protected-species guidance.

Does being near the River Tees prove bats are present?

No. It provides habitat context. The site-specific assessment must distinguish potential, observed activity and a confirmed roost.

Has Stockton adopted its replacement Local Plan?

No. A new scoping consultation was under way in November 2026; the 2019 plan remains adopted.

What if someone saw a bat flying over my garden?

A sighting may be relevant context, but it is not automatically evidence of a roost in the roof or of population size.

Does a planning informative mean I have a licence?

No. Informative wording, planning conditions and Natural England licensing are separate matters.

Does the Thorpe Wood restoration figure measure a benefit to bats?

The area records the extent restored. Evidence of bat use would need dated observations or recordings with known effort. A repeat survey can compare use of the same bank if its position, vegetation and working conditions are documented.

Local evidence / Practical design

Prepare the right application information

Stockton’s planning-advice gateway links its national and local validation checklist, with a 2025 filename. Check the ecology information against the particular development and affected features. Keep protected-species evidence separate from any BNG statement; one does not replace the other.

Sources: ST-VALID — official source · Stockton national and local validation checklist, 2025

Local evidence / Practical design

Survey methods and practical next steps

Local evidence / Practical design

Discuss your Stockton-on-Tees project

Show how machinery would reach the pond

Send the footprint of dredging or bank works, the route for plant and spoil and the vegetation to be retained. Identify whether the area would be lit during or after construction.

Discuss your proposal