Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

West Lindsey / Surveys · Design advice · Planning

Bat surveys in West Lindsey

West Lindsey includes the Trent valley, the approaches to the Wolds and large arable holdings around Gainsborough. The Tillbridge Solar assessment illustrates why a seemingly uniform field layout can conceal important differences between a woodland edge, a reservoir and a clipped hedge.

See the local planning examples

Discuss your West Lindsey project

  • Local planning and ecological evidence
  • Council map and practical design diagram
  • Proportionate surveys and clear next steps

Tell us about your proposal

We use your details to respond to this enquiry. Read our Privacy Policy.

Local evidence / Practical design

West Lindsey: place the proposal in its local setting

West Lindsey council boundary
The inset locates West Lindsey in Lincolnshire. North is up. The scale bar applies to the main map.
Map keyCouncil boundaryScale bar · 10 km
Enlarge map · Lincolnshire locator
The inset locates West Lindsey in Lincolnshire. North is up. The scale bar applies to the main map.
West Lindsey council boundary. The inset shows its position in Lincolnshire. North is up. The scale bar applies to the main map.

The Trent valley, the limestone edge and the Wolds

West Lindsey District Council is the relevant local planning authority for most ordinary developments within its boundary. It shares the Central Lincolnshire Local Plan with the City of Lincoln and North Kesteven but operates its own planning register, validation decisions and conditions. A project described as near Lincoln might be in a neighbouring authority; confirm the correct map.

Local context · Gainsborough · Market Rasen · Trent / Ancholme context · Wolds / rural villages

Map scope ONS December 2025 council boundary with county-context inset. Settlement names provide orientation; they are not plotted coordinates. No bat records or inferred flight routes are mapped.
Map source ONS December 2025 boundary (20 m) · Contains OS data © Crown copyright and database right 2025. OGL v3.0.

Contains OS and National Statistics data © Crown copyright and database right 2025. Open Government Licence v3.0. ACP cartography.

Local evidence / Practical design

Adopted policy, changing plans and application evidence

Green corridors and trees under the 2023 plan

Current framework

West Lindsey applies the Central Lincolnshire Local Plan adopted 13 April 2023. Policies S59, S60, S61 and S66 address green and blue infrastructure, biodiversity, net gain and trees/hedges. Read the individual policy map for actual site effects: no rule says all roofs require the same number of emergence surveys. [9]

Central Lincolnshire’s replacement plan consultation · Checked 23 November 2026

Checked 23 November 2026

The Central Lincolnshire replacement plan is at scoping stage. According to the joint planning team, the deadline for this consultation is 17 December 2026. The adopted 2023 plan remains separate from the proposals and programme for its replacement. A new plan announcement does not grant consent for a site. [10]

West Lindsey’s revised validation lists

Supporting information

West Lindsey adopted revised validation lists on 16 November 2026. The current full-application list includes a Natural Environment Report / Ecological Impact Assessment where required, linked to policy S60. Use the current application-category list; the earlier 2024 download is superseded. [1; 16; 15]

What the Ryland Road condition covers

Site-specific decisions

Where a proposal could affect bats, provide evidence adequate to understand its effects before the planning decision. Validation is not a guarantee that the ecology is sufficient. Ask which uncertainty a survey will resolve, and consider whether design changes can avoid the impact. [6]

Local evidence / Practical design

Where a small patch of woodland changes the survey brief

The Tillbridge team identified pockets of woodland and irrigation reservoirs as feeding opportunities in a largely agricultural landscape. At Fiskerton Fen, wetland and sheltered water offer a different setting. Trace the connected features on the site plan before deciding which corners of a field merit recording.

Local evidence / Practical design

Lessons from local planning records

These are independent public records, not ACP projects. Committee recommendations, signed permissions, licence decisions and completed mitigation are different stages.

Ryland Road: read a survey condition in context

The historical 146645 officer report discusses a 2023 appraisal and a proposed further emergence survey before commencement. It explains the reasoning for that particular scheme. It is not a universal one-visit rule, proof of absence or verification of a subsequently issued licence. [4]

Tealby: enhancement needs a clear purpose

The 148165 officer report proposes details of integrated bat bricks and bird boxes alongside landscaping. Those recommendations concern ecological enhancement. They do not establish an occupied roost or prove that features were installed. Signed decisions and subsequent outcomes were not verified here. [5]

Local evidence / Practical design

Tillbridge Solar: why the team investigated Harpswell Wood separately

The applicant’s bat appendix reports at least nine species across the scheme and describes specialist survey work at Harpswell Wood. The team combined walked counts and static recordings with targeted investigation where calls alone left species identity uncertain. Results from the whole order area should not be attributed to every field in West Lindsey.

Tillbridge Solar environmental statement, bat survey appendix

Retain / Adapt / Assess the remaining effects

Explore design options before fixing the scope

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Enlarge the West Lindsey design example

Scroll across the enlarged diagram. Original conceptual illustration, not a measured site plan.

Conceptual plan with an existing building, retained trees and hedge, proposed access and shielded lighting. Three annotated design questions explain the assessment. No actual bat route or property is represented.
Original ACP conceptual illustration. It identifies design questions, not a measured site, verified roost or approved mitigation scheme.

Gainsborough town-centre roof conversion

Survey rooflines, chimneys, fascia and relevant inner spaces before stripping coverings. Consider retaining a functional entrance or changing insulation and scaffold location if the findings justify it.

Show the existing and proposed roof sections together. Include access for scaffold and any changes to external lights. The ecologist and designer can then identify which retained features remain functional throughout construction and occupation.

Market Rasen village-edge access

Map trees, hedge gaps, turning circles and temporary compounds; shift access/lighting rather than eliminating a useful dark connection without survey evidence.

Compare the original access with a layout that retains vegetation. Record clearance, sightlines and temporary works on the drawing. Any reduction in survey scope must follow a justified reduction in effects, rather than a deadline.

River Trent development

Assess waterside trees, bridges and proposed lighting, including during construction. Keep appropriately identified corridors dark where practicable and compare existing and future usage.

Wolds farm building

Distinguish historic fabric, protected landscape policy, bat roost evidence and BNG calculations. An architectural repair plan must accommodate lawful ecological measures without unwarranted boxes or survey visits.

Local evidence / Practical design

Does the cable route need the same evidence as the panel area?

A cable working strip can cross a mature hedge that the solar layout retains. Show the actual break, construction width and route back to cover. Give each affected crossing an identifier so results from the principal site can be kept apart from observations along the cable.

Survey guides: Preliminary Roost Assessments · Bat emergence surveys · Bats in trees · Bats and lighting · bat activity survey guide · bat mitigation licences

Local evidence / Practical design

Testing lighting at a woodland approach

Specify where a security camera needs illumination and whether it can use another setting. Compare the light at the tree line and the route leading to it. A measurement taken on a bright compound apron cannot describe the conditions inside an adjoining hedge corridor.

Local evidence / Practical design

Giving the installer a usable boundary schedule

Link the survey locations to the numbered hedge crossings and reservoir margins on the drawings. Record which lengths must stay dark, when gaps will be replanted and who will inspect them. This keeps evidence from several survey methods tied to an identifiable part of the design.

Further reading: survey season guidance · survey cost guide · survey methods, field forms and recording resources

Compact answers / Clear next steps

West Lindsey bat survey questions

Were nine species present in every Tillbridge field?

The appendix reports at least nine across the scheme. Individual survey stations sampled different habitats, seasons and levels of activity.

Why use specialist methods at Harpswell Wood?

The applicant sought to resolve questions about rarer or acoustically difficult species. A different site needs its own justification for that level of work.

Can two detectors be compared by their raw pass totals?

Check recording hours, dates, microphone position and habitat first. A longer deployment can accumulate more passes even at similar activity levels.

Where does the Tillbridge cable evidence apply?

Follow the order limits and the named survey locations. The wider route extends beyond the West Lindsey principal site.

Is a new bat box at Tealby evidence of a colony?

The purpose stated in the ecology documents matters. Enhancement alone does not demonstrate occupation or the loss of a roost.

What changed for West Lindsey validation in November 2026?

Revised local lists took effect on 16 November. Select the list for the application type and check whether the works trigger ecological information.

Local evidence / Practical design

Discuss your West Lindsey project

Send the details that shape the advice

Share your site boundary, drawings, photographs, previous reports and council comments. Include roof, demolition and tree works, access, temporary works, lighting and intended dates.

We will discuss the ecological questions and possible avoidance options before recommending the next step.

Discuss your proposal

Connected guidance

Connect local and national advice

See the Lincolnshire county guide for wider landscape context and the England hub for the national route.

Our main bat survey service explains the process. Planning permission, habitat BNG and protected-species licensing remain distinct matters.