Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Loughborough BNG advice

Biodiversity Net Gain in Loughborough

Plan your Loughborough development around local habitats, planning requirements and practical biodiversity gains.

ACP Consultants can help with habitat surveys, biodiversity metric calculations and a practical BNG delivery plan for your Loughborough site.

Local planning

Who decides development applications in Loughborough?

Charnwood Borough Council is the local planning authority for Loughborough, including most ordinary residential and commercial proposals within the town. Leicester City Council has separate planning powers to the south and Leicestershire County Council exercises county planning functions for appropriate minerals, waste and certain county development. The county ecology advisory team specifically tells Charnwood applicants to consult the borough directly for ecology advice.

Local planning

Adopted and emerging planning policy

Start with the adopted policies and the actual site boundary. Then establish the evidence needed for the proposal and its planning stage.

Which adopted biodiversity policies apply in Loughborough?

The Charnwood Local Plan 2021–2037 was formally adopted on 19 January 2026. Its adopted EV6 Biodiversity and Geodiversity policy seeks statutory BNG and ecological network protection, while EV4 relates to the National Forest/Charnwood Forest landscape, EV5 addresses the River Soar/Grand Union Canal corridor and EV7 covers trees. Those policies are now operative in the borough; pre-2026 plan references and withdrawn old drafts should not be used as though still adopted.

Loughborough planning and biodiversity evidence
Adopted policy or documentWhat it coversPractical implication for the application
EV6 — Conserving and Enhancing Biodiversity and GeodiversityCharnwood Local Plan adopted 19 January 2026Provide a suitable 10% statutory BNG route on in-scope schemes and protect important sites, species and habitat connectivity.
EV5 — River Soar and Grand Union Canal Corridor2026 adopted Local PlanConsider waterways, banks, riparian buffers and corridor continuity for relevant Loughborough parcels.
EV7 — Trees2026 adopted Local PlanAssess mature trees, canopies, root zones and future planting management alongside habitat calculations.
EV4 — National Forest and Charnwood Forest Regional Park2026 adopted Local PlanCheck landscape/ecological priorities where the actual site lies within the appropriate mapped area.

The requirements above are separate from the later national statutory BNG condition. A project should not achieve numerical gains by damaging priority habitats, designated land or protected species. Existing trees, water bodies, wetlands, wildlife corridors and high-value grassland must be assessed under their own applicable protections.

Which proposed plans should applicants monitor?

Charnwood's replacement Local Plan has already been adopted on 19 January 2026. Earlier references to the 2015 plan or an emerging 2021–2037 plan at examination are now historic. The council has discussed supplementary documents following adoption, but a proposed or consulted SPD is not automatically an adopted requirement. Check the actual adopted plan, relevant neighbourhood plans and current council validation list instead of inventing a separate Loughborough town plan with independent planning powers.

A consultation or Gateway stage is not an adopted Local Plan. Therefore, the plan currently in force, any relevant made neighbourhood plan and the 2026 National Planning Policy Framework continue to guide decisions.

Nature recovery

How does the Local Nature Recovery Strategy apply to Loughborough?

The published August 2025 LLR LNRS covers Loughborough and Charnwood Borough alongside Leicester City, Rutland and other Leicestershire districts. Its mapped opportunities can help prioritise appropriate river-edge, woodland and urban green-space habitat enhancements, but they do not supersede Charnwood's adopted EV6 or site surveys. Charnwood and Leicester are separate LPAs even where their ecological corridors connect; inspect the actual official mapped intervention when scoring strategic significance.

An ecologist must test whether a proposed enhancement genuinely matches the relevant mapped measure. An LNRS opportunity polygon cannot replace a field survey, create units automatically or make a habitat gain site legally registered. Download the current map and retain its source/date when justifying strategic significance.

Official Local Nature Recovery Strategy and map.

Local ecology

Local habitats and site considerations

Use habitats within and connected to your site to scope surveys and retain important ecological connections.

Habitats and ecological connections

Loughborough lies in the wider River Soar catchment, with canal links, urban watercourses and green corridors. Tree-lined routes, public open space and older gardens can contribute to habitat networks, but their ecological condition and legal status need actual UKHab and tree evidence. River and ditch improvements may require a specialist condition assessment and hydrological compatibility. Protect existing important trees and hedges before relying on new replacement planting.

Charnwood Borough contains protected wildlife sites and species and, in parts of the district, ancient woodland, veteran trees and the National Forest landscape. A Loughborough plot should not automatically be classified as Charnwood Forest or a National Forest woodland site solely because of its borough. Appropriate protected-species survey work, conservation of local wildlife sites and any direct River Soar impact are assessed separately from the statutory BNG percentage.

Protected-species licensing, statutory site impact assessment, woodland or tree protection and any relevant watercourse assessment remain separate from BNG. A development exempt from the statutory condition may still need to avoid or mitigate ecological harm.

Development and habitat design

Proposals in Loughborough town centre, university/industrial campus estates or neighbourhood housing areas can have very different habitat baselines. Some urban sites may contain scrub, grassland or trees on previously developed land. A future university or employment scheme might benefit from nature-based SuDS and connected tree cover, but its exact design needs the site's adopted allocation, red-line survey, access demands and council preapplication guidance.

If space is tight, first map the plants, rivers and other habitats already on the site. Then test layouts that avoid harm and keep valuable features. New habitats must suit the soil, drainage, shade, public access and long-term care. A site's former use as a factory or farm does not establish its habitat condition.

Planning evidence

What can applicants learn from local evidence?

A Charnwood Borough Council March 2026 Plans Committee report recorded an indicative habitat-unit shortfall of 3.97 area units and 2.07 hedgerow units for one assessed proposal, with wider ecological mitigation and planning obligations discussed. This is a real published committee example of why habitat and hedgerow metrics are separately important.

Planning evidence

What BNG evidence does Charnwood Borough Council expect?

For development subject to statutory BNG, the national application-stage information normally includes:

  1. Whether the applicant considers the biodiversity gain condition applicable, with reason if exempt.
  2. The pre-development biodiversity value, completed appropriate published statutory metric, and version/publication date.
  3. Any earlier baseline date and reasons where relevant.
  4. Details of habitat degradation and earlier calculations where applicable.
  5. Any irreplaceable habitat on the red-line site.
  6. A scaled map showing current onsite habitats and a north point.

Applicants should use Charnwood Borough Council's current planning validation list and adopted EV6. Leicestershire County Council's ecology-advice webpage expressly states that Charnwood provides its own ecology guidance, so applying a county ecology advisory list for a different district can lead to mistakes. Where justified, a Preliminary Ecological Appraisal, UKHab condition sheets, statutory metric, tree/hedgerow records and species surveys may be necessary. The national final Gain Plan remains a later planning-condition stage.

Some sites need extra ecology or landscape reports because of their likely impacts. First check the council’s current validation list for your type of application. The council normally approves the final Biodiversity Gain Plan after planning permission, before work starts. This final plan is not a standard requirement with every initial application.

For help commissioning evidence, see our BNG assessment service and habitat surveys.

National requirements

What are the current statutory rules?

Qualifying development in England normally needs 10% statutory BNG. From 6 August 2026, a new application on a whole development site of 0.2 hectares or less can be exempt where no onsite priority habitat is adversely affected. Certain wholly temporary schemes lasting five years or less may also qualify; the former dedicated self/custom-build exemption no longer applies to new applications. Older cases and section 73 permissions require their own transitional assessment.

The 29 September 2026 NPPF, policies N1(2) and N2(3), restricts mandatory local BNG requirements above the statutory level to specific, justified and deliverable allocations. A general aspiration to improve biodiversity should not be misrepresented as an adopted blanket 20% requirement.

The latest government statutory metric, as at 10 November 2026, is v1.1.1, updated 10 November 2026. GOV.UK permits any published statutory metric version where appropriate; pre-statutory Metric 4.0 is not an accepted mandatory tool. An eligible smaller scheme may instead use the separate Small Sites Metric.

For decision criteria, see our BNG exemptions guide and statutory biodiversity metric service.

Habitat delivery

What if suitable biodiversity gains cannot be delivered onsite?

Charnwood policy EV6 and the published LNRS can help select suitable biodiversity delivery opportunities but do not create an automatic local habitat bank. Where legal registered offsite units are appropriate for the particular application class, confirm trading, available habitat types and actual allocated stock via the government's register. A development's urban constraints do not excuse impacts on priority habitat or the separate legal duties for bats and watercourses.

For major development, appropriate onsite creation/enhancement normally has priority under the national gain hierarchy. For qualifying non-major applications made from 6 August 2026, onsite and registered offsite gains may be considered at an equivalent hierarchy level. Statutory biodiversity credits remain the last resort.

Any proposed offsite units must meet habitat-trading, spatial-risk, legal agreement, government gain-site registration and allocation rules. A local supplier's brochure, LNRS opportunity map or projected bank cannot demonstrate current saleable units. Significant onsite and registered offsite gains generally require at least 30 years of secure habitat management.

Our offsite biodiversity units guide and Habitat Management and Monitoring Plan service explain the respective stages.

Your site checklist

Seven checks before commissioning a BNG calculation

Use these seven checks to plan the surveys and evidence your site needs before you apply.

Loughborough planning and biodiversity evidence
CheckSite evidenceWhy it matters
Planning authorityConfirm the red-line boundary and the actual decision-maker: Charnwood Borough Council; check any separately identified planning geography.Select the correct adopted plan, map and application validation list.
BNG applicabilityRecord the application date, whole site hectares, onsite priority habitats, development type and any earlier or section 73 permission.Test the legally correct exemption, transition and delivery hierarchy.
Surveyed habitatObtain UKHab parcels, habitat conditions, hedgerows, watercourses, trees, photographs and protected-species evidence.Determine survey scope, habitat condition and appropriate statutory metric modules.
Published LNRSCheck the Leicestershire, Leicester and Rutland LNRS current Local Habitat Map and the exact matching habitat measure, not just an opportunity colour.Justify the proposed measure against the published LNRS map and site location.
Protected sitesCharnwood adopted EV6 and River Soar EV5, protected trees EV7 and mapped local wildlife sites. Confirm exact plot; do not conflate wider Charnwood Forest with central Loughborough.Identify HRA, protected species, watercourse or other separate safeguards.
Gain-delivery routeTest viable onsite habitat, current habitat trading, genuine government-registered off-site allocation and significant enhancement management.Check actual habitat trading, registered allocations, spatial risk and feasible habitat creation.
Application and stewardshipUse the appropriate council's application documents and prepare final gain-plan and long-term management at the right stage.Align initial evidence, postpermission gain-plan approval and long-term stewardship.

Discuss your site evidence with ACP →

Project delivery

Project planning and delivery

Build the planning evidence around a consistent habitat baseline, site layout and metric. The steps below connect the application documents with practical habitat delivery.

Budget and long-term delivery

Project costs depend on whether the Loughborough site has a simple garden/modified grassland baseline or needs woodland, bat, tree/hedgerow, river or habitat-condition assessment. The Council may require management/security for significant onsite enhancements. Request the current applicable council schedule and project-specific habitat quotation.

Keep each cost clear: UKHab and condition surveys, the metric, species surveys, offsite units, legal fees and long-term monitoring. Each pays for a different task. Ask for a quote for your site. A fee for work affecting a protected site does not tell you the price of BNG units.

A final Biodiversity Gain Plan for qualifying permission normally comes after consent and before commencement. Significant gains need realistic legal stewardship and a suitable habitat management/monitoring plan, often for at least 30 years.

Read our Biodiversity Gain Plan guide and BNG cost categories.

Three assessment stages

First — check the planning context. Send the site boundary, plans, likely application date and council name. Then check the adopted policies, whether BNG applies, the LNRS area and any key site constraints.

Next — survey and calculate. Scope UKHab, habitat condition, area/hedgerow/watercourse modules and, where justified, protected-species or Habitats Regulations work. Record metric version and survey assumptions transparently.

Then — plan how to deliver the gains. Keep valuable habitats and test suitable onsite designs. If a shortfall remains, check suitable registered offsite gains. Also plan who will manage the habitats in the long term. Confirm the evidence before making any claim about units or planning approval.

Request a Loughborough BNG quotation →

Local planning guidance

Frequently asked questions

These answers cover common planning, habitat and delivery questions for projects in Loughborough.

Is Loughborough in Leicester City for BNG planning?

No. Loughborough is within Charnwood Borough Council. Leicester City has a separate unitary Local Plan and policy NE02. Loughborough applications should use Charnwood's adopted January 2026 Local Plan and current validation procedures.

Has Charnwood's replacement Local Plan been adopted?

Yes. The Charnwood Local Plan 2021–2037 was formally adopted on 19 January 2026. Its EV6 biodiversity policy and other adopted environmental policies are operative.

Does Charnwood's EV6 mean a higher local 20% BNG target?

EV6 seeks biodiversity enhancement and the statutory 10% framework. No unsupported blanket Loughborough 20% requirement should be assumed. National September 2026 policy also limits generally compulsory higher local standards.

Are River Soar and canal habitats important to Loughborough development?

They can be, where the actual site affects a watercourse, bank, tree or ecological corridor. Adopted EV5 and the statutory metric's watercourse module may be relevant. Survey the plot and water features before assigning a baseline or mitigation.

Does Leicestershire County Council determine Loughborough ecology requirements?

No. Charnwood Borough is the ordinary local planning authority and maintains its own ecology advice. County-level LNRS responsibility and some specialist functions do not replace Charnwood planning validation.

Does the March 2026 committee case prove that BNG units are available?

No. It is a public planning-report discussion of an indicative habitat and hedgerow shortfall. Use the actual scheme documents to establish its registered unit allocation and long-term habitat commitments.

Does Charnwood policy EV5 matter beside Loughborough's River Soar corridor?

EV5 in Charnwood's adopted January 2026 Local Plan protects and seeks to enhance the River Soar and Grand Union Canal corridor. For an actual waterside plot, the applicant should assess riparian habitat, banks, tree continuity and any relevant watercourse metric.

Does every Loughborough development need 10% Biodiversity Net Gain?

No. Qualifying development normally needs 10%, but the legal exemptions and transitions are important. New applications from 6 August 2026 can qualify for the conditional exemption on a site of 0.2 hectares or less where no onsite priority habitat is adversely affected. Protected species and habitats can require separate evidence.

Can a small site in Loughborough use the Small Sites Metric?

Only if the development and habitats meet the government's Small Sites Metric eligibility rules. Site area or number of dwellings alone does not decide this. The main statutory metric may be required instead, particularly where sensitive habitats or other exclusions apply.

When is the final Biodiversity Gain Plan approved in Loughborough?

For eligible permissions the final Biodiversity Gain Plan is normally submitted and approved after planning permission and before development starts. The original application needs the national baseline information plus any necessary and proportionate evidence required under the correct authority's current validation list.

Can I purchase off-site biodiversity units for a Loughborough project?

Potentially, provided the units meet the relevant habitat-trading, registration, legal allocation and spatial-risk rules. Availability, unit classes and prices have to be checked for the actual scheme. A supplier's website or nature-recovery map is not proof of available allocated units.

Project support

How ACP can help with your Loughborough project

ACP can help you plan the surveys, calculations and documents your site needs. We agree the scope around your proposal, its planning stage and the habitats affected.

Survey, design and planning support

  • Habitat surveys and condition assessments.
  • Statutory metric calculations and design options.
  • BNG reports and planning submission support.
  • Gain plans and habitat management documents.

Discuss your site with ACP →

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.