Regional field guide · East Midlands
Biodiversity Net Gain in the East Midlands
Find the right council, test your habitat baseline and plan how to deliver the gain.
Biodiversity net gain in the East Midlands takes different forms on a former airfield, a Trent floodplain or a Peak District hillside. Start with the site boundary. Then compare the adopted plan, the local recovery map and the habitats your survey actually finds.
Regional atlas
Which authority covers your East Midlands site?
Choose an area on the map or use the alphabetical index. The directory names 35 district, borough, city and unitary councils. The Peak District National Park Authority also decides applications within its boundary.
Simplified Natural England LNRS boundaries. Lincolnshire uses the ONS county boundary to show the East Midlands portion of the strategy. Contains OS data © Crown copyright and database right 2024 and ONS data. Strategy boundaries · County boundary · Open Government Licence v3.0.
Derbyshire and Derby
Derby, Chesterfield, Buxton, Matlock and Ilkeston
Derby City handles its own applications. Elsewhere, find the district or borough and check whether the red line falls inside the Peak District National Park.
Published LNRS · September 2025
Derbyshire County Council
The Dark Peak headwaters, White Peak limestone and urban Derwent call for different surveys. Record links between the site and the wider habitat network.
Planning council directory (9)
Amber Valley · Bolsover · Chesterfield · Derby · Derbyshire Dales · Erewash · High Peak · North East Derbyshire · South Derbyshire.
Leicestershire, Leicester and Rutland
Leicester, Loughborough, Hinckley, Melton Mowbray and Oakham
Leicester City and Rutland are unitary authorities. The seven Leicestershire districts use their own development plans, even though they share a recovery map.
Published LNRS · November 2025
Leicestershire County Council
Trace connections between Charnwood Forest, the Soar valley and isolated grasslands. In Rutland, check watercourses and the protected wetland interests of Rutland Water.
Planning council directory (9)
Blaby · Charnwood · Harborough · Hinckley and Bosworth · Leicester · Melton · North West Leicestershire · Oadby and Wigston · Rutland.
Lincolnshire
Lincoln, Boston, Grantham, Skegness, Spalding and Gainsborough
The seven districts shown are in the East Midlands. The Greater Lincolnshire LNRS also covers North Lincolnshire and North East Lincolnshire, both in Yorkshire and the Humber.
Published LNRS · July 2026
Lincolnshire County Council
Consider chalk streams in the Wolds, fen drains and the Wash coast. Groundwater, flood management and tidal influence can determine which habitats will persist.
Planning council directory (7)
Boston · East Lindsey · City of Lincoln · North Kesteven · South Holland · South Kesteven · West Lindsey.
North Northamptonshire
Corby, Kettering, Wellingborough, Rushden and Oundle
The unitary council handles these applications. Former districts still matter when selecting the relevant Part 2 local plan and policies map.
Published LNRS · 5 March 2025
North Northamptonshire Council
Rockingham Forest and the Nene valley offer different opportunities. Check whether a proposal affects woodland links, former gravel pits or habitat used by wetland birds.
Planning council directory (1)
North Northamptonshire.
Nottinghamshire and Nottingham
Nottingham, Mansfield, Worksop, Newark and West Bridgford
Nottingham City is separate from the county's seven districts. A Nottingham postal address can fall within Broxtowe, Gedling or Rushcliffe.
Published LNRS · 10 November 2025
Nottinghamshire County Council
Look for links between Sherwood heath and woodland, the Trent floodplain and former industrial sites. Check brownfield mosaics before allocating apparently vacant land.
Planning council directory (8)
Ashfield · Bassetlaw · Broxtowe · Gedling · Mansfield · Newark and Sherwood · Nottingham · Rushcliffe.
West Northamptonshire
Northampton, Daventry, Towcester and Brackley
One unitary council now covers the former Northampton, Daventry and South Northamptonshire areas. Check the relevant area-specific policies alongside the Joint Core Strategy.
Published LNRS · September 2026
West Northamptonshire Council
Use the September 2026 strategy to test opportunities in the Northamptonshire Uplands, Nene wetlands, and the Yardley and Whittlewood woodland network.
Planning council directory (1)
West Northamptonshire.
Planning geography
Start with the red line, then check who decides
A recovery strategy may span several planning authorities. In a two-tier area, the county often leads the strategy while the district decides an ordinary housing or commercial application.
District, unitary or national park?
Locate the complete red-line boundary, including access and drainage works. In Derbyshire, a High Peak or Derbyshire Dales address can lie inside or outside the national park.
Inside the park, use the park authority’s development plan and application requirements. For a boundary-crossing proposal, agree the route with both authorities. Peak District development policies.
County applications and growth corridors
A school extension, mineral extraction or waste facility can have a different decision-maker from a nearby housing site. The Swanwick case below illustrates a county education scheme in Amber Valley.
For proposals around the A46, the M1 or the Derby–Nottingham corridor, trace the actual boundary and affected watercourses. Find the local council · See the school case.
Council reorganisation
On 29 October 2026 ministers withdrew the July decisions for Derbyshire and Derby, Leicestershire with Leicester and Rutland, Greater Lincolnshire, and Nottinghamshire with Nottingham. The proposals remain under review.
Use the existing authorities for current submissions. A proposed successor boundary provides no basis for choosing an off-site spatial multiplier. Read the ministerial statement.
National rules
Does the statutory gain condition apply?
For an in-scope planning permission, the statutory objective is at least 10% biodiversity gain. Determine the application date, consent route and any exemption before choosing a survey or promising a unit total.
Test the whole site
For applications made from 6 August 2026, a site of 0.2 hectares or less may qualify for exemption if the development does not affect on-site priority habitat. The temporary-development exemption has its own five-year and priority-habitat tests.
A narrow field margin or native hedge can change the answer. Record the red-line area, habitat evidence and basis for the exemption. The previous custom/self-build exemption no longer applies to new applications. Defra exemption tests · BNG exemptions guide.
Choose the delivery sequence
First avoid or mitigate adverse effects on medium, high and very high distinctiveness on-site habitats. For major development, prioritise on-site enhancement, then on-site creation, then registered off-site gains where possible.
For qualifying non-major applications made from 6 August 2026, those three compensation options have equal preference. Government statutory credits come last. Check the relevant transition rules for earlier or varied permissions. National planning practice guidance.
Before starting work
The deciding authority normally approves the Biodiversity Gain Plan after permission and before commencement. Secure significant on-site enhancements and registered off-site gains for at least 30 years. Phased development needs an overall and a phase-specific approach.
Nationally significant infrastructure applications submitted from 2 November 2026 follow the development consent route and applicable biodiversity gain statement. Establish the consent route early for major energy and transport proposals. Infrastructure and planning routes · Biodiversity Gain Plan support.
Development plans
What do adopted East Midlands policies ask for?
Record the title, policy number and date for the plan covering your parcel. Then show where the design responds. The selected comparisons below illustrate why a city-centre scheme and a rural allocation need different evidence.
Leicester · policies NE01 and NE02
Leicester adopted its 2020–2036 Local Plan in June 2026. NE01 addresses biodiversity and geodiversity protection. NE02 addresses biodiversity gain and follows the statutory minimum. The plan also considers how major schemes can contribute to the wider ecological network.
Show retained habitat and the links between it, open space and proposed planting. For an allocated site, read its individual requirements alongside NE01 and NE02. Read Leicester’s adopted plan.
Central Lincolnshire · S59, S61 and Appendix 4
The April 2023 plan covers Lincoln, North Kesteven and West Lindsey. S59 deals with green and blue infrastructure. S61 and Appendix 4 use biodiversity opportunity mapping to guide development within the ecological network.
Check both the policy map and the Greater Lincolnshire LNRS. The councils’ post-August guidance asks for a completed metric where a site falls in the opportunity or LNRS mapping. Keep this local evidence request distinct from the national exemption decision. Adopted plan and maps · Current council BNG guidance.
Nottingham · Core Strategy 17 and LAPP EN6
Policy EN6 in the January 2020 Land and Planning Policies Document links site-level biodiversity to Nottingham’s ecological network. It sets expectations for proposals affecting designated sites and supports multifunctional enhancements.
Show how retained trees, watercourses, rail corridors or greenspace connect across the site boundary. The replacement Greater Nottingham Strategic Plan went to examination; the council reports hearings in July 2026. Record its status separately. Read EN6 · Check plan progress.
Derby and the Peak District · CP19 and DMC11
Within Derby City, Core Strategy CP19 addresses biodiversity. Inside the national park, DMC11 requires applicants to address nature conservation interests, including safeguards, alternatives and enhancement. The two policies serve different areas.
Test options while the layout can still move. In the park, explain how survey work, avoidance and protection address each affected feature; a positive spreadsheet result alone cannot demonstrate this. Derby’s adopted and emerging plans · Read DMC11.
North and West Northamptonshire · Policy 4 and BN2
North Northamptonshire’s 2016 Joint Core Strategy Policy 4 addresses biodiversity, geodiversity and restoring ecological networks, including the Nene Valley. In West Northamptonshire, the 2014 Joint Core Strategy covers a different area and BN2 addresses biodiversity.
On each side, identify the relevant Part 2 policies and maps. The North’s replacement plan is in preparation; its scoping consultation closed on 1 July 2026. North Joint Core Strategy · West Joint Core Strategy · North plan timetable.
Rutland · check which plan has weight
Rutland’s 2021–2041 plan is under examination. On 30 October 2026 the council reported that representations on housing supply had gone to the inspector. A separate 2026–2046 scoping exercise closed on 14 October.
For an Oakham or Uppingham proposal, list the adopted policies used for the decision. Identify any relevant emerging policy and explain the weight you attach to it. Examination updates · Separate scoping consultation.
Local nature recovery
How to use the six published strategies
The six strategies in the area directory are all published. Use their individual maps when scoring strategic significance in the statutory metric. Defra’s national register is the starting point for checking the responsible authority and current status.
Locate the parcel
Overlay the red line and any off-site land on the correct local habitat map. Distinguish existing areas important for biodiversity from places where a specific recovery action could help.
Keep a dated extract, map legend and parcel reference. For Lincolnshire, follow the full Greater Lincolnshire strategy even though this guide shows only the part inside the East Midlands. Check published strategies.
Match habitat to measure
A mapped opportunity can identify a useful direction: for example, connecting woodland fragments or restoring a riparian corridor. It still needs a feasible habitat type, condition and management prescription.
Read the measure against the metric user guide before selecting strategic significance. The same map designation can lead to different answers for two proposed habitat types. Statutory metric tools and user guide.
Check the off-site parcel separately
A developer in Northampton and a provider near Kettering may be working with different strategies and authorities. Check the provider parcel against its own map, then apply the relevant spatial rules.
Save the evidence alongside the metric, the site register entry and the unit offer. This makes later review possible if the delivery parcel or the offer changes. Compare registered sites.
Regional ecology
Which habitat constraints could change the layout?
Use designated-site and habitat records to scope fieldwork. The landscape helps explain what to look for; only site evidence can establish which habitats the development affects.
Peak peatlands and limestone grassland
On the Dark Peak, blanket bog can be an irreplaceable habitat. Hydrology matters beyond the peat surface: drainage, haul routes and cuttings can affect water movement. On limestone, surviving species-rich grassland can be difficult to recreate.
Map avoidance buffers early. Where an irreplaceable habitat meets the statutory definition, use its bespoke treatment and agree compensation for unavoidable loss. Defra irreplaceable habitat guidance.
Sherwood, Charnwood and former industrial land
Wood pasture, veteran trees, heath and ancient woodland can occur within a mosaic of less distinctive habitat. Former quarries, railway land or airfields may also support open mosaic habitat on previously developed land.
Commission the right seasonal survey before clearance. Record what makes each parcel distinctive; a hardstanding label or an apparently neglected surface may hide a more complex baseline. Habitat condition assessment.
The Trent, Soar and Nene corridors
Floodplain grassland, wet woodland, ditches and gravel-pit wetlands depend on water levels and connectivity. A landscape plan may show enough space while the drainage design prevents the proposed habitat condition.
Give the ecologist and drainage designer the same levels, outfalls and maintenance routes. Where a watercourse assessment is required, use appropriate river-condition expertise. River condition assessment.
Lincolnshire Wolds, fens and the Wash
Chalk streams depend on groundwater; fen drains support a different hydrological system. On the coast, protected estuarine habitats and internationally important birds also require their own assessment.
Separate changes in habitat units from effects on protected sites, tidal function and disturbance. Freiston Shore shows why monitoring water and sediment can matter as much as recording vegetation. See the monitored restoration examples.
From permission to allocation
How a Derbyshire school secured off-site units
Two public records connect a school project in Swanwick with a gain site in Chesterfield. They show what a developer can check independently when off-site habitat forms part of a delivery strategy.
The permission
Derbyshire County Council approved CD6/0325/51 subject to conditions on 21 November 2025. The scheme at Swanwick School and Sports College includes a modular teaching building, excavation, landscaping and a retaining wall.
The decision-maker was the county council. Use its application reference to trace the project; a search confined to Amber Valley’s ordinary application list could miss it. Open the council decision record.
The allocation
Natural England records 0.30 area units for CD6/0325/51 at Wild Whittington, BGS-170624001. The entry identifies 0.022 hectares of mixed scrub and 0.034 hectares of other neutral grassland, both targeting moderate condition.
The area in hectares describes land; the units describe biodiversity value. Keep both figures and the habitat conditions in the evidence trail. Open the allocation tab.
What the next applicant can learn
Match the development reference, all habitat types and the provider parcel before committing to a supply agreement. Then reconcile the allocated value with the development metric and the gain plan.
The register records a named allocation. It does not establish a price or give another development a claim on those units. How the national register works.
Off-site delivery
Where can a developer look for biodiversity units?
Start with the habitat shortfall after design changes. Identify area, hedgerow and watercourse requirements separately. Then check the trading rules, spatial multiplier, legal agreement and current availability for each offer.
Wild Whittington · Chesterfield
Derbyshire Wildlife Trust describes the former arable site on the edge of Old Whittington. The register records 24.19 hectares, an enhancement start date of 28 May 2024 and an obligation end date of 27 May 2055.
Its register entry links individual developments to allocated habitat. Ask the operator for a current written offer covering the specific habitat and condition your metric requires. Trust site profile · Natural England entry.
Sherwood Habitat Bank · Bassetlaw
BGS-231025001 covers 16.52 hectares at grid reference SK6286685090. Its baseline includes cereal crops, modified grassland and woodland. One recorded allocation is 8.56 area units of other neutral grassland for Sheffield application 26/00510/FUL.
A cross-boundary allocation is possible. Test proximity using the statutory metric’s rules for that module; an address in the same broad region does not establish the spatial multiplier. Bassetlaw site and allocations.
Polebrook Airfield · North Northamptonshire
Broadbent Habitats identifies this former airfield near Oundle as BGS-241025001. The 28.68-hectare register entry includes open mosaic habitat. For land south of Lamport Way at Stanton Cross, it records 4.86 area units under 25/01254/NMA.
At another Wellingborough project, the same site records an allocation of 0.11 area units. Those are separate reservations against different proposals. Check the allocation tab and match the precise reference. Polebrook register entry · Operator information.
For area and hedgerow units, check local planning authority and National Character Area relationships. Watercourses use catchment-based rules. Government statutory credits are purchased through the national service as a last resort. Compare units and statutory credits · Government credit prices.
Cost and delivery
What belongs in an East Midlands BNG budget?
Keep the assessment, habitat delivery, legal work and monitoring as separate lines. For an off-site purchase, compare written offers on the same habitat, condition, spatial basis, tax treatment and allocation terms.
Habitat units · an advertised price
Gaia’s East Midlands marketplace lists a £25,500 area-unit price for its Peak District Habitat Bank listing. Other entries, including Polebrook, are listed as price on application. The advert is a dated market example, checked on 5 November 2026.
Ask the seller to confirm the location, registration, applicable habitat, stock, VAT and fees before using a price in an appraisal. For example, a nominal two-unit shortfall can require more than two purchased units after spatial adjustment. See the marketplace listings.
Council monitoring · size and difficulty
North Northamptonshire’s published off-site calculator uses site area, the most difficult habitat and the manager’s experience. Its standard table illustrates £8,002.65 for the lowest difficulty band on a 0–10 hectare site. Sites above 40 hectares need a bespoke fee.
This is an illustration from a published calculator. Ask the council for the current indexed figure and terms for the actual agreement. Legal drafting, registration, land management and remedial work have separate costs. Read the council fee calculator · Gain-site registration and fees.
Nene Valley housing · a separate contribution
North Northamptonshire publishes a £371.17-per-dwelling mitigation rate as of 10 June 2026. The council identifies residential net increases within 5.9 km of the Upper Nene Valley Gravel Pits SPA for assessment of recreational effects.
For ten qualifying additional dwellings, that rate gives £3,711.70. This funds access management and monitoring of recreation; a scheme can still have its own habitat-unit shortfall. Check the zone and applicable rate when applying. Council application and SPA guidance.
On-site management and statutory credits
Allow for establishment, replacements, ecological monitoring and corrective work across the management period. A wetland may require water-level monitoring; a meadow may need an agreed cutting regime and removal of arisings.
If the final route is statutory credits, use the relevant government habitat tier and the statutory multiplier. Record the evidence for using credits; their published prices do not value every local private unit. Statutory credit schedule · BNG costs and pricing.
Planning evidence
What to submit, and when
Ask the deciding authority which local validation list and mapping formats it uses. The information needed to validate an application differs from the detail needed to discharge a gain condition.
Before application
Prepare a scaled red-line plan, dated habitat survey, baseline metric and condition evidence. Record any irreplaceable habitat, clearance history and relevant degradation date. Compare at least one layout that avoids the principal loss.
Chesterfield publishes a baseline survey requirement and asks for information about affected designations. Lincolnshire County Council sets out what it expects for applications it determines. Chesterfield evidence · Lincolnshire county submissions.
While developing the design
Reconcile landscape, drainage, access and utilities against the same parcel plan. Check trading rules for every module; a surplus of area units cannot remedy a hedgerow deficit. Put habitat assumptions and borrowed land under change control.
West Northamptonshire asks applicants to identify proposed off-site enhancement arrangements. Include any locally required evidence and explain what remains to be secured. West Northamptonshire guidance · Statutory metric guidance.
After permission
Submit the gain plan with the final metric, drawings and relevant allocations. Set out who will implement each management action, when it is due, how condition will be tested and who pays to put failures right.
Keep the permission reference with the register allocation and the signed legal documents. Habitat management and monitoring plans · Section 106 agreements and conservation covenants · Planning validation checklist.
Restoration evidence
What do regional projects tell us about monitoring?
A target habitat and year are only credible if the site processes support them. These two projects provide evidence for designing monitoring objectives; their reported outcomes belong to their own sites.
Kinder Scout · measure water as well as plants
A five-year study of degraded headwater catchments compared restored and control sites. Researchers examined re-vegetation and gully blocking, measuring water tables and storm runoff as well as surface condition.
For a scheme relying on peatland hydrology, specify where and when water levels will be read, what change triggers a review and who can alter management. Do not transfer a catchment-level flood benefit into a biodiversity unit calculation. Read the monitoring study.
Freiston Shore · test the coastal processes
At Freiston, east of Boston, three breaches in the outer sea bank allowed tidal water onto 78 hectares of former farmland in August 2002. The monitoring programme tracked sediment as well as the developing saltmarsh.
For a proposed wetland, agree measurable physical conditions and a route for corrective work before assigning a target condition. This historic flood-defence project is a restoration example rather than a registered unit offer. Defra and Environment Agency case study.
ACP guidance
Plan the assessment or compare a neighbouring area
For a specific site, send your drawings, the planning authority and any condition or validation request. These details help an ecologist identify the evidence needed and whether seasonal surveys affect the programme.
Scope a site assessment
Use the assessment guide to check the survey, baseline and metric deliverables. For a multi-phase scheme, identify which approval controls the first site works.
Check the planning sequence
Use the national guide for common legal and metric requirements. For an off-site purchase, check who is responsible for registering and allocating the units.
England BNG guide · BNG planning process · Off-site biodiversity units.
Crossing the regional edge
For land around the Fens, compare the Lincolnshire and neighbouring East of England strategies. A shared catchment can cross a regional or planning boundary.
Regional questions
East Midlands BNG questions
Have a planning condition or an off-site offer to check? Send the project details.
Is North Lincolnshire part of this East Midlands guide?
The Greater Lincolnshire nature recovery strategy includes North Lincolnshire and North East Lincolnshire. Both are in Yorkshire and the Humber for regional geography. Our map therefore shows only the seven Lincolnshire districts in the East Midlands. Use the full strategy when checking habitat connectivity.
Where do I apply for a site near Buxton?
Check the red line against the Peak District National Park boundary. Within the park, the national park authority normally decides the application. Outside it, start with High Peak Borough Council for ordinary development. County matters can follow a different route.
Does a small site in Central Lincolnshire still need a metric?
First test the national exemption against the application date, site area and priority habitat. Then check the council’s published guidance on biodiversity opportunity and LNRS mapping. The authority may still request ecological evidence for its local policy assessment.
Can a Northampton site buy units in North Northamptonshire?
Potentially. West and North Northamptonshire are separate planning authorities and have separate nature recovery strategies. Test the specific habitats, the trading rules and the applicable spatial relationship. Ask for a written, parcel-specific offer and check the register before allocation.
Can a school use a habitat bank outside its district?
The Swanwick school record gives a real example in Derbyshire. The county permission and Wild Whittington allocation share an application reference. For another school, compare the local baseline, habitat shortfall, spatial calculation and council requirements afresh.
What should I send to an East Midlands BNG consultant?
Send a site address, red-line plan, drawings, application stage and any council correspondence. Include earlier habitat surveys, vegetation clearance dates and proposed drainage or access changes. For an off-site option, include the operator’s parcel details and current offer.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Field guide / source notes
Regional evidence
Reviewed by ACP Consultants