Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Regional field guide · East of England

Biodiversity Net Gain in the East of England

Find the planning authority, habitat evidence and delivery options for your site.

Biodiversity net gain in the East of England can mean restoring a fen ditch, retaining chalk grassland or finding suitable off-site units. Start with the red-line boundary. Then use the local plan, recovery map and field survey to test what the site can deliver.

Regional atlas

Which council and nature recovery map cover your site?

The six published Local Nature Recovery Strategies (LNRS) cover 45 district, city, borough and unitary councils. Select an area on the map or use the text index. Inside the Broads, there is a separate planning authority.

Simplified strategy boundaries © Natural England 2024. Contains OS data © Crown copyright and database right 2024. Boundary data · Open Government Licence v3.0.

AREA 01

Bedfordshire

Bedford, Luton, Dunstable, Leighton Buzzard and Sandy

Three unitary councils cover the county. Our Bedfordshire BNG guide compares their policies, application evidence and nature recovery priorities. A site near Bedford can fall in Central Bedfordshire. Check the address and the red line before relying on Bedford Borough policy.

Published LNRS · December 2025
Central Bedfordshire Council

The Great Ouse valley, Greensand Ridge, Marston Vale and Chiltern chalk support different habitat networks. On a former extraction or brickworking site, survey open ground, wet hollows and scrub before selecting woodland or grassland targets.

Planning council directory (3)

Bedford · Central Bedfordshire · Luton.

Strategy, priorities and maps · Open the habitat map

AREA 02

Cambridgeshire and Peterborough

Cambridge, Peterborough, Ely, Huntingdon, March and Wisbech

Greater Cambridge Shared Planning serves Cambridge and South Cambridgeshire. The two authorities retain separate adopted Local Plans. Peterborough is unitary, while county planning functions elsewhere sit with Cambridgeshire County Council.

Published LNRS · 23 December 2025
Cambridgeshire and Peterborough Combined Authority

Use the strategy’s proposed measures for the relevant landscape. Wetland opportunities around the Great Fen and Wicken Fen depend on water supply and soils. The chalk south-east of Cambridge calls for a different establishment and grazing plan.

Planning council directory (6)

Cambridge · East Cambridgeshire · Fenland · Huntingdonshire · South Cambridgeshire · Peterborough.

Cambridgeshire BNG guide · Strategy, priorities and maps · Open the habitat map

AREA 03

Greater Essex

Explore biodiversity net gain in Essex for council policies, habitat priorities and planning evidence.

Chelmsford, Colchester, Basildon, Harlow, Southend-on-Sea and Grays

The Greater Essex strategy includes the unitary authorities of Southend-on-Sea and Thurrock. Elsewhere, use the district or city for ordinary planning applications. Check county functions for minerals and waste.

Published LNRS · 10 July 2025
Essex County Council

Estuarine grazing marsh and saltmarsh, former industrial land in south Essex, ancient woodland and farm ponds need different survey methods. Compare the proposed measure with the published habitat map, then test hydrology and access on the ground.

Planning council directory (14)

Basildon · Braintree · Brentwood · Castle Point · Chelmsford · Colchester · Epping Forest · Harlow · Maldon · Rochford · Tendring · Uttlesford · Southend-on-Sea · Thurrock.

Strategy, priorities and maps

AREA 04

Hertfordshire

St Albans, Watford, Stevenage, Hertford and Hemel Hempstead

Ten district and borough councils handle ordinary planning applications. Hertfordshire County Council provides ecological advice and has separate county planning responsibilities. Check East Herts and the neighbouring Essex authorities around Gilston.

For council policies, LNRS scoring and application evidence, read our Hertfordshire Biodiversity Net Gain guide.

Published LNRS · 24 November 2025
Hertfordshire County Council

On a chalk stream, examine the banks, watercourse and surrounding floodplain separately. In the Lea and Colne valleys, test how habitat parcels connect across roads, extraction lakes and built-up land. Record the mapped action before scoring strategic significance.

Planning council directory (10)

Broxbourne · Dacorum · East Hertfordshire · Hertsmere · North Hertfordshire · St Albans · Stevenage · Three Rivers · Watford · Welwyn Hatfield.

Strategy, priorities and maps · Open the habitat map

AREA 05

Norfolk

Norwich, King’s Lynn, Great Yarmouth, Thetford and Dereham

Seven district-level councils cover Norfolk. The Broads Authority determines planning applications inside its executive area. In particular, Broadland District and the Broads Authority are different planning authorities.

Published LNRS · 31 October 2025
Norfolk County Council

The strategy’s Locations for Action help distinguish Broads wetlands, Breckland heath and grassland, and North Norfolk coastal sites. Check water levels, grazing and disturbance before promising an enhancement. A coastal intervention may also need to accommodate shoreline change.

Planning council directory (7)

Breckland · Broadland · Great Yarmouth · King’s Lynn and West Norfolk · North Norfolk · Norwich · South Norfolk.

Strategy, priorities and maps · Open the habitat map

AREA 06

Suffolk

Ipswich, Bury St Edmunds, Lowestoft, Felixstowe and Newmarket

East Suffolk has separate adopted plans for the former Waveney and Suffolk Coastal areas. In the Waveney valley, also check the Broads executive boundary. Babergh and Mid Suffolk share planning guidance but remain separate councils.

Published LNRS · 31 October 2025
Suffolk County Council

Compare Sandlings heathland, Brecks grassland, estuarine marsh and clayland ponds with the parish-scale map. A new pond needs a realistic water source. A restored hedge needs a suitable cutting regime and links to neighbouring habitat.

Planning council directory (5)

Babergh · East Suffolk · Ipswich · Mid Suffolk · West Suffolk.

Strategy, priorities and maps · Open the habitat map

If a boundary cuts through a site, identify the planning authority for each parcel and discuss the application route with the councils. Find a council by postcode · Check the national LNRS register.

Planning geography

Check the red line before selecting a policy

A postal county, a shared planning service and a nature recovery area can have different boundaries. Three examples show why that matters early in the design.

The Broads executive area

The Broads Authority decides applications within its planning area across parts of Norfolk and Suffolk. A riverside site with a Norwich or Lowestoft address can therefore follow a different route from nearby housing.

Check the park boundary, then use its submission requirements. Broads planning and BNG guidance.

Harlow and Gilston

Harlow, East Herts and Epping Forest work with Essex and Hertfordshire county councils on the Garden Town. The Stort valley links the landscape across the county boundary.

For a crossing, access road or phased development, map the relevant authorities and habitat corridors separately. Garden Town partnership.

Greater Cambridge

Cambridge and South Cambridgeshire share a planning service and supplementary biodiversity guidance. Peterborough and the other Cambridgeshire authorities use their own development plans.

Identify the deciding council and the permission type before choosing a validation checklist. Greater Cambridge full application checklist.

Council reorganisation. On 29 October 2026, the government listed Hertfordshire’s earlier decision as withdrawn for reconsideration. Essex, Norfolk and Suffolk remained under review following September withdrawals. Cambridgeshire and Peterborough awaited a decision. For a current submission, use the councils in the directory. Read the government’s dated update.

National framework

When does the statutory gain condition apply?

For ordinary planning permission within scope, Schedule 7A to the Town and Country Planning Act 1990 sets a minimum 10% increase against the pre-development biodiversity value. The application date, consent route and habitat affected determine how to proceed.

Check the application and habitat

From 6 August 2026, applications for sites of 0.2 hectares or less can qualify for exemption if the development does not affect on-site priority habitat. A separate test covers wholly temporary development permitted for five years or less. Measure the whole red-line site.

Record the reason and evidence for any exemption. New self-build applications no longer qualify solely through the former self-build category. For a variation, check the original permission and transitional provisions. Current exemption tests · BNG exemptions guide.

Choose the correct delivery route

First avoid or mitigate adverse effects on medium, high and very high distinctiveness on-site habitat. For major development, then prioritise on-site enhancement, on-site creation and registered off-site gains in that order, where possible.

For qualifying non-major applications made from 6 August 2026, on-site enhancement, creation and registered off-site gains have equal preference at the compensation stage. Government statutory credits remain the final option. Planning practice guidance.

Distinguish permission from commencement

The planning authority normally approves a Biodiversity Gain Plan after permission and before work begins. Significant on-site enhancements and registered off-site gains need at least 30 years of management. Phased development also requires an overall gain plan and phase plans.

Nationally significant infrastructure applications submitted from 2 November 2026 use the development consent route and relevant biodiversity gain statement. Check the scheme’s consent route before applying ordinary planning procedures. Defra’s BNG guidance · Biodiversity Gain Plan support.

Planning policy

East of England policies that change the design brief

Start with the adopted plan for the red line. Then check supplementary guidance, local validation requirements and the stage of any replacement plan. These examples identify what an applicant can put on a drawing or in a supporting statement.

Bedford Borough · protect, then enhance

In the adopted Local Plan 2030, 42S addresses impacts on biodiversity and geodiversity. Policy 43 deals with enhancement. Assess the site and surrounding habitat before laying out access, drainage and open space.

The council resolved to withdraw its Local Plan 2040 on 8 October 2025. Confirm the adopted plan and map for Bedford Borough. A site in Central Bedfordshire or Luton needs the relevant unitary council’s policies. Read 42S and 43 (PDF) · Current development plan.

Cambridge and South Cambridgeshire · adopted tests

Cambridge Local Plan policy 70 addresses priority species and habitats. South Cambridgeshire policy NH/4 covers biodiversity. The councils adopted their joint Biodiversity SPD in early 2022 and provide an interim off-site protocol.

Show how the layout retains and links habitat. Then explain how any residual shortfall will be delivered, using the checklist for the correct application type. Biodiversity SPD and off-site protocol · Full application requirements.

Greater Cambridge · proposed 20% for major development

The proposed submission plan’s BG/BG policy would require at least 20% BNG for qualifying major development. Consultation closed on 25 September 2026. On 5 November, the proposal was still before formal submission and examination.

If a scheme will run across the plan transition, compare viable 10% and 20% layouts and record the policy basis for each. The published programme schedules council consideration in November and December 2026. Read proposed BG/BG · Check the decision timetable.

Chelmsford · coastal recreation and BNG

DM16 in the adopted 2020 plan addresses ecology and biodiversity. For qualifying housing in the zone of influence, check the revised Essex Coast Recreational Disturbance Avoidance and Mitigation Strategy (RAMS). Chelmsford adopted it on 14 July 2026.

Treat the RAMS contribution as a separate protected-site cost. Use the council’s transitional dates and the appropriate plan map. The replacement Local Plan entered examination in June 2026. Adopted plan · Coastal mitigation and tariff · Plan review.

North Hertfordshire · networks and site protection

The 2022 Local Plan uses SP12 for green infrastructure, landscape and biodiversity. NE4 addresses biodiversity and geological sites. On the edge of a settlement, show where retained habitat connects to surrounding land.

Allow space for construction buffers, roots and realistic long-term habitat management. Use parcel references consistently in drawings and the metric. North Herts adopted plan · County ecology advice.

Greater Norwich and the Broads · two planning routes

Greater Norwich Local Plan policy 3 covers environmental protection and enhancement. The March 2024 strategy covers Norwich, Broadland and South Norfolk planning areas outside the Broads. Inside the Broads, the 2019 plan includes SP6 on biodiversity and DM13 on the natural environment.

Check the river valley, protected sites and green infrastructure together. The Broads plan review has its own examination documents, so record the version you use. Greater Norwich policy 3 · Adopted Broads plan (PDF) · Broads examination library.

Suffolk · use the applicable plan area

SCLP10.1 covers biodiversity and geodiversity in the former Suffolk Coastal area. In Babergh and Mid Suffolk, Joint Local Plan LP16 addresses biodiversity. Their September 2026 guidance explains evidence, legal agreements and monitoring.

For a housing layout near a hedge, pond or woodland edge, show how construction and later use affect the feature. Also identify which enhancements need long-term security. Suffolk Coastal Local Plan (PDF) · Babergh and Mid Suffolk guidance.

Local Nature Recovery Strategies

Turn a mapped priority into a defensible metric entry

All six strategies are published. They describe where action could help nature recover. For a planning application, relate the actual parcel, intervention and target condition to the strategy for that location.

Find the relevant measure

Open the local habitat map from the directory and read the associated measure. Note the strategy date, layer and location. A county-wide ambition to expand woodland gives less site-specific evidence than a mapped proposal for the parcel.

Keep a map extract and the measure reference alongside the statutory biodiversity metric calculation.

Check the habitat on site

A mapped opportunity may overlap an existing species-rich sward, a drainage easement or a priority habitat. For example, tree planting on suitable arable land can have a different outcome from planting on a valuable open grassland.

Check the baseline classification, condition, soils and water regime. Habitat condition assessment.

Explain strategic significance

Hertfordshire’s advisory service distinguishes baseline and post-development scoring after publication of its LNRS. It describes high post-development significance where the proposed intervention matches a mapped action. Unmapped actions can still have ecological value.

Apply the current statutory user guide and the local instructions for the relevant date. Hertfordshire’s worked guidance · National user guide.

Habitats and field evidence

Design for water, soils and the habitat that is already there

The East of England contains connected river valleys and estuaries, alongside fragmented heath, woodland and farmland habitat. These landscapes guide the survey questions. Field evidence establishes the baseline for a particular site.

Fenland peat, ditches and managed water levels

Around March, Ely and the Great Fen, an apparently dry parcel can sit within an actively drained landscape. Check water levels through the year, access for ditch maintenance, neighbouring land and any drainage approvals.

For wetland creation, demonstrate how the required water regime will persist. A habitat target without a water source or management agreement can overstate the gain. Great Fen wet-farming research.

Chalk streams, grassland and the Brecks

Hertfordshire’s chalk rivers and the chalk near Cambridge need different evidence from the dry sandy habitats of Breckland. Soil fertility, grazing, water supply and shade affect what habitat can develop.

Where a site includes a watercourse, check bank condition and riparian land separately from area and hedge units. For grassland, record species and condition before selecting a target. River condition assessment · Habitat condition evidence.

Coastal marsh, estuaries and urban brownfield

On the Essex and Suffolk coasts, separate habitat creation from effects on feeding or roosting birds. On previously developed land, check for open mosaic habitat, exposed substrates, ponds and scrub before categorising the parcel.

For a coastal scheme, assess water levels, disturbance and future shoreline change. Inland, check how lighting, access and drainage affect retained habitat connections. Essex Coast recreational mitigation.

Ancient woods, hedges and farm ponds

Woodland edges and hedge networks can link otherwise isolated habitats. A gap for a new access can affect that connection even where the footprint is small. Check ancient woodland, veteran trees, species records and breeding ponds early.

Show root protection, buffers and retained links on the same plan as the proposed development. Irreplaceable habitat requires its own assessment and compensation process. BNG baseline survey and assessment.

A public planning record

A Fenland solar permission and its 3.7-unit allocation

The public records for Marwick Road, March show three separate decisions in the life of one scheme. They give an applicant a practical way to check what each document proves.

1 · The planning permission

On 9 May 2025, Fenland District Council granted permission for a 622.16 kWp ground-mounted solar array east of 20–24 Marwick Road. Condition 2 required submission and approval of the gain plan before commencement.

The parent application reference is F/YR25/0209/F. Council decision notice (PDF).

2 · The gain plan

The council recorded the subsequent application as F/YR25/0712/BNGP. It validated it on 1 October 2025 and issued its approval on 3 June 2026. Use the decision-issued field when checking whether a condition has been discharged.

The application record links the discharge to condition 2 on the original permission. Fenland gain-plan decision.

3 · The off-site allocation

Natural England’s Fleam Dyke entry records 3.7 area units against F/YR25/0209/F. It identifies mixed scrub and other neutral grassland. The development is in Fenland, while the gain site is in South Cambridgeshire.

Match the application reference, habitat type and allocated value. Then keep the register record with the approved plan. View the allocation.

Off-site biodiversity units

Where can developers investigate registered habitat banks?

Use the register to verify a gain site’s boundary, planned habitat and allocations. Then ask the operator for a current quote for the right unit type and delivery date. Check the spatial adjustment before comparing offers.

Wilbraham Fields, Fleam Dyke · Cambridgeshire

Natural England records a 7.59-hectare site in South Cambridgeshire under BGS-050924001. The Wildlife Trust describes how former arable land can buffer the narrow Fleam Dyke reserve and make grazing more practical.

The project’s chalk landscape is its ecological context. For a purchase, use the register’s actual habitat descriptions and the development’s trading requirements. Registered habitat and allocations · Wildlife Trust project and enquiry route.

Wendling Beck · near Dereham, Norfolk

BGS-121224001 records 537.4 hectares. The wider nature recovery project extends beyond this registered parcel. The public record includes allocations to developments, while Norfolk Environmental Credits offers an enquiry route for this bank and Langley Abbey.

Send the completed shortfall by module, the application reference and both locations. The provider can then confirm stock, security and terms. Wendling Beck register record · Norfolk Environmental Credits enquiries.

Hall Wood · Brentwood, Essex

Hall Wood appears as BGS-240625001. Its 19.42-hectare gain site includes planned broadleaved woodland and pond interventions, alongside ditch improvements in the watercourse module. Different unit types meet different losses.

Check the specific improvement and condition in the register. Enhancement units at an existing woodland cannot justify loss of irreplaceable habitat elsewhere. Hall Wood register record · Provider information.

Looking across a boundary? The metric’s spatial-risk rules depend on the unit type. For area habitats, compare the planning authorities and National Character Areas. For watercourses, check the relevant catchments. A nearby bank can still require an adjustment. Current metric rules · How off-site biodiversity units work.

Costs and contracts

What belongs in the East of England BNG budget?

Keep council monitoring, legal work, habitat management and unit purchases on separate lines. The figures below refer to named schemes or authorities and have different payment triggers.

Babergh and Mid Suffolk · council monitoring

The 2026/27 schedule lists £11,983 for the minor category, £14,904 for 10–49 homes, £26,497 for 50–199 and £40,000 for 200 or more. The schedule also gives non-residential floor-area bands and local significance tests.

For example, 25 homes with qualifying significant on-site gains fall within the £14,904 housing band. Allow separately for the legal agreement, actual ecology surveys, management and remedial works. Check the fee bands, triggers and phased payments.

Wendling Beck · indicative unit prices

Carter Jonas lists £27,500 for other neutral grassland, £31,500 for mixed scrub and £35,000 for other mixed woodland. Its brochure identifies the indicative list as Q2 2025. The published figures exclude VAT and are subject to contract.

Use these as dated examples of why the habitat type matters. Request a current written quotation, adjusted quantity and allocation terms before committing a budget. Published indicative prices · Request a current quote.

Chelmsford · a separate coastal mitigation cost

For qualifying applications submitted from 1 August 2026, Chelmsford’s revised RAMS charge is £476 per net additional dwelling, index-linked annually. Earlier submissions and appeals have transitional arrangements.

For ten qualifying additional dwellings at that rate, the recreational mitigation contribution is £4,760. Any BNG shortfall still has its own solution and cost. Check the zone, tariff and dates.

Landowner fees · listing, registration and legal security

Hertfordshire’s site matching service introduces landowners and developers. Where its free-service criteria do not apply, listing costs £110 plus VAT. Developers can submit a site request without a fee. The national gain-site registration fee is £639.

Before offering units, allow for baseline surveys, the legal agreement, establishment and at least 30 years of management. Negotiate a private unit price directly with the provider. County matching service · Natural England registration terms.

Statutory credits · last resort

Government credit prices vary by habitat tier. The statutory route generally requires two credits per unit of shortfall. For example, an eligible A1 shortfall of one unit costs £84,000 at the published £42,000 credit price.

Keep evidence of the other delivery routes considered and confirm the credit tier in the current schedule. Government credit prices · Units and credits explained · BNG costs guide.

Application evidence

Documents to prepare from survey to delivery

A developer or planning consultant should be able to trace each metric entry to a parcel, drawing and management commitment. These checks cover the usual stages of a planning application.

Keep the project record consistent

The Broads Authority recommends a draft gain plan at application stage. Hertfordshire ecology advice asks for mapped parcel references, condition sheets and survey evidence. Check what the deciding authority expects for your site. Broads requirements · Hertfordshire survey guidance.

  1. 01

    Before the survey

    Bring the red-line plan, land ownership, proposed access and any clearance history. Survey at a suitable time and label area habitats, hedgerows and watercourses consistently. For a fenland or coastal parcel, agree what water-level evidence the design needs.

  2. 02

    At validation

    Explain whether the gain condition applies. Where required, submit the baseline metric, dated habitat plan, relevant baseline date and information on irreplaceable habitat or earlier degradation. A draft gain plan may help the authority assess a difficult scheme. Check the actual local list.

  3. 03

    Before starting work

    Reconcile the approved layout and final metric. Submit the Biodiversity Gain Plan, any required Habitat Management and Monitoring Plan, off-site registration and allocation evidence, and statutory credit evidence where applicable. Allow time for the authority to decide.

  4. 04

    Through the management period

    Identify the land manager, access rights, funding and reporting timetable. Specify the condition checks and corrective action for each parcel. Keep drainage, grazing and cutting obligations compatible with the habitat target through the secured period.

Use ACP’s planning validation checklist and habitat management and monitoring guidance for the supporting documents.

Restoration evidence

What Fenland projects tell us about delivery risk

Two published projects illustrate why the target habitat, time to establishment and future land use deserve separate checks in a BNG assessment.

Great Fen · wet farming on peat

The WaterWorks trials explored crops suited to wet peat, including common reed and bulrush. The research brought together the Wildlife Trust, University of East London, UKCEH and Cambridgeshire ACRE. It tested land use that keeps peat wet while retaining productive options.

For a development-led wetland, establish the water source and seasonal regime first. Then specify management and monitoring appropriate to the habitat claimed in the metric. Read the university project account.

Ouse Fen · restoration in phases

At Needingworth, mineral extraction and progressive restoration form part of a long-running reedbed creation partnership. The published Cambridgeshire strategy uses Ouse Fen as an example of landscape-scale habitat delivery.

For phased proposals, distinguish land secured today from habitat that can establish only after later works. Document the dates, substrate and aftercare assumptions for each phase. Read the Ouse Fen case study in the published strategy (PDF).

Technical support

Find the next document for your project

ACP’s BNG consultants can help with the baseline, statutory metric, planning evidence and management plan. The starting point depends on the site and its consent stage.

Testing the layout

Send the red line, current proposals and any previous habitat survey. A baseline assessment helps compare the effect of different access, drainage or housing layouts.

BNG assessment and UKHab survey.

Regional questions

East of England BNG questions

For advice on a specific planning condition or council request, include the wording when you discuss your site.

Does Greater Cambridge already require 20% BNG?

The proposed submission plan includes a 20% minimum for qualifying major development. As at 5 November 2026, it remains a proposal. Check the adopted development plan and national statutory requirement for the application. Record any emerging policy separately.

Is Broadland District Council the same as the Broads Authority?

They have different planning areas. The Broads Authority decides planning applications inside its executive boundary. Outside it, identify the relevant district or unitary authority. Check the red line on the official map before choosing forms or policy references.

Can a Fenland project buy units in South Cambridgeshire?

Yes, where the habitat, trading rules, spatial calculation and legal arrangements work. Fleam Dyke’s register entry records an allocation to a solar development in March. Check the adjusted requirement for your own parcels before requesting a price.

Do the Norfolk and Suffolk recovery maps use one strategy?

The counties prepared their strategies together and published both on 31 October 2025. Each county has its own written priorities and local habitat map. For a cross-boundary project, record the location and relevant measure for each parcel.

Does an Essex Coast RAMS payment count as biodiversity units?

RAMS funds mitigation of recreational disturbance at protected coastal sites. A development’s statutory BNG calculation measures habitat change and requires its own delivery evidence. A qualifying project may need to budget for both.

What should I send for a BNG assessment in the East of England?

Send the red-line plan, site address, application stage, drawings and any existing survey or council request. Include proposed drainage and access, habitat clearance history and the likely construction programme. These help define the fieldwork and evidence required.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.

Field guide / source notes

Regional evidence

Reviewed by ACP Consultants

National framework and council responsibilities

Adopted plans and local evidence

Nature recovery strategies and mapping

Gain sites, charges and project records