Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Nottinghamshire BNG advice

Biodiversity Net Gain in Nottinghamshire

Plan your development around its habitats, local planning policies and biodiversity net gain requirements.

ACP Consultants can help with habitat surveys, biodiversity metric calculations and a practical BNG delivery plan for your Nottinghamshire site.

Local planning guidance

How does biodiversity net gain work in Nottinghamshire?

Most planning applications that fall within the statutory BNG framework must achieve at least a 10% improvement in biodiversity value.

First, an ecologist identifies the existing habitats within the red-line site boundary. A suitable UKHab survey, habitat condition assessment and statutory biodiversity metric help establish the baseline.

Next, the scheme is tested against proposed habitat retention, enhancement and creation. The calculation considers more than the percentage of land left green. Habitat type, size, condition, distinctiveness, strategic significance and the difficulty of establishing new habitats all matter.

Hedgerow and watercourse units are calculated separately from area habitat units. As a result, adding trees or grassland cannot simply offset every different habitat loss.

Early ecological input can help protect established trees, hedges, wetlands and woodland. It can also identify whether the proposed habitat gains are realistic and suitable for long-term management.

For further technical detail, see ACP's BNG assessment and habitat baseline surveys and statutory biodiversity metric calculations.

Local planning guidance

Which Nottinghamshire planning authority applies to your site?

There is no single planning authority for all developments in Nottinghamshire.

The seven district and borough councils normally decide housing and commercial applications in their areas. Nottingham City Council is a separate unitary planning authority. Meanwhile, Nottinghamshire County Council deals with minerals, waste and certain county development proposals.

The adopted planning framework can therefore change over a short distance, even when the same LNRS covers both sides of the boundary.

The difference between Nottinghamshire County Council and Nottingham City

Nottinghamshire County Council is the responsible authority for the shared county-and-city LNRS. However, that does not make it the planning authority for every Nottinghamshire project.

A housing scheme in Nottingham City normally follows the City's planning framework. A minerals proposal in the wider county may need the County Council's minerals planning policies and BNG guidance.

For each project, confirm the red-line boundary, application category and which authority will determine the planning application.

Your Nottinghamshire BNG planning worksheet

Find the planning authority for your site, then use the evidence checklist to prepare your project brief.

Step 1 — Where is the development?

Nottinghamshire's seven districts, Nottingham City and the county minerals/waste planning route — 7 November 2026
Site location or applicationAuthorityOperative policy and current change to check
Sutton-in-Ashfield, Kirkby-in-Ashfield, HucknallAshfield District CouncilSaved 2002 Local Plan policies; 2023–2040 replacement at examination, not yet adopted.
Worksop, Retford, HarworthBassetlaw District Council2024 Local Plan ST37/ST38; BNG SPD adopted December 2025.
Beeston, Stapleford, Eastwood, KimberleyBroxtowe Borough Council2014 Aligned Core Strategy and 2019 Part 2 Policy 31; joint Greater Nottingham replacement at examination.
Arnold, Carlton, Gedling, CalvertonGedling Borough Council2014 core and 2018 LPD18; separate emerging plan following withdrawal from joint GNSP.
Mansfield, Mansfield WoodhouseMansfield District Council2020 adopted Local Plan NE2; review latest local validation statement and 2026 national exemption changes.
Newark, Southwell, OllertonNewark and Sherwood District Council2019 Amended Core Strategy; updated Allocations/Development Management plan adopted 20 October 2026 (replaces 2013 version).
West Bridgford, Bingham, RuddingtonRushcliffe Borough Council2014 core and 2019 Part 2 Policy 38; joint Greater Nottingham strategic plan not adopted.
Nottingham CityNottingham City Council (separate unitary authority)2014 core and 2020 Land and Planning Policies EN6; detailed City BNG validation requirements.
Minerals, waste and certain county developmentNottinghamshire County Council; Nottingham City has relevant separate functionsMinerals Local Plan 2021, joint Waste Local Plan 2025 and County BNG SPD September 2025; 20% aspiration not a county-wide statutory mandate.

LNRS: all eight ordinary planning areas above fall within the published Nottinghamshire and Nottingham Local Nature Recovery Strategy, published 10 November 2025. A shared nature recovery map does not create a single planning authority.

Step 2 — Six decisions to check before you submit

Suggested evidence to identify before appointing a BNG consultant or applying for planning permission
QuestionWhy it mattersEvidence or action
1. When was the planning application made?The 6 August 2026 exemptions and non-major gain hierarchy differ from older applications and certain section 73 variations.Application date/permission chain and GOV.UK exemptions guidance.
2. Is the site actually exempt?A site no larger than 0.2 hectares can qualify under the new rule only if the date and onsite priority habitat impact conditions are met. Other exemption tests differ.Scaled red-line site plan, area calculation, habitat impact check and clear legal basis.
3. What habitat is already on the site?Woodland, hedgerows, grassland, river habitats and irreplaceable habitats require distinct surveys, condition information and mitigation.UKHab habitat plan, condition assessments, protected species/trees and site-designation screening.
4. Does the mapped LNRS measure match the proposal?Being in an ACB does not automatically award a strategic significance multiplier or authorise a habitat bank.Official Local Habitat Map, matching mapped potential measure and current statutory metric guidance.
5. Which adopted policy and validation list apply?Newark's 2026 adoption supersedes its 2013 DPD; Gedling is not in the current three-council joint GNSP. City and County have separate roles.Correct authority's adopted Local Plan and latest type-specific local validation list; note any emerging plan only as emerging.
6. How will habitat gains be delivered and secured?Major/non-major gain hierarchy, habitat trading, registration, allocation, and 30-year management affect feasible delivery.Current metric, outline landscape/HMMP and legal documents; check the national gain sites register for actual offsite entries.

Step 3 — Prepare a useful project enquiry

Share your site location or red-line plan, proposed development, current drawings, application stage and any ecological reports. These details help us scope the surveys, metric work and planning evidence your project needs.

Read about BNG assessment or contact ACP Consultants.

Local planning guidance

Nottinghamshire and Nottingham's published Local Nature Recovery Strategy

The Nottinghamshire and Nottingham Local Nature Recovery Strategy (LNRS) was published on 10 November 2025. Nottinghamshire County Council prepared it as the responsible authority, in partnership with district councils, Nottingham City and other organisations.

It applies across the seven Nottinghamshire district and borough areas and Nottingham City. Therefore, it provides one shared nature recovery framework, even though the councils retain separate planning responsibilities.

The strategy identifies priorities and mapped opportunities for protecting, connecting, restoring and creating habitats across the county and city.

The Local Habitat Map distinguishes:

  • Areas of Particular Importance for Biodiversity (APIBs): established important wildlife areas, including relevant designated sites, Local Wildlife Sites and mapped irreplaceable habitats.
  • Areas that Could Become of Particular Importance for Biodiversity (ACBs): places identified as opportunities for nature recovery.
  • Mapped potential measures: habitat actions intended to deliver the strategy's priorities in particular locations.

The map is useful during site selection, masterplanning and landscape design. It can also inform the strategic-significance component of the statutory biodiversity metric where the proposed intervention qualifies.

However, the map does not automatically require a landowner to carry out the proposed measures. It also does not establish the habitat condition on an individual site, guarantee a metric uplift or register a biodiversity gain site.

Official links: Nottinghamshire and Nottingham LNRS and official Local Habitat Map.

What does an LNRS opportunity mean for a BNG assessment?

An ecological consultant should compare the mapped habitat measure with the habitat proposed for the site. The location, intervention and metric eligibility need to align.

For example, a mapped opportunity for wetland restoration would not automatically justify a higher score for an unrelated planting scheme.

Likewise, a mapped opportunity is not permission to remove existing habitats. Any relevant protected site, priority habitat or irreplaceable habitat must still be assessed under the applicable legal framework.

Local planning guidance

Nottinghamshire's habitats and practical BNG constraints

Nottinghamshire includes river floodplains, mature woodland, heathland, grassland, wetland habitats, hedgerows and former mineral workings.

The River Trent and its floodplain provide one example of water-dependent habitats and ecological connectivity. Other rivers and drainage networks can raise watercourse-unit, flood-risk and habitat-management questions.

Around Sherwood Forest, ancient oak woodland, wood pasture, heathland and bird habitats may be important. However, a woodland or heathland planting proposal must suit its local ecological setting.

The LNRS also identifies ancient or veteran trees, ancient woodland and lowland fen as irreplaceable-habitat categories. These need careful treatment; they are not interchangeable with ordinary habitat units.

The baseline should follow the actual site. No county-level map can establish a parcel's habitat condition without appropriate evidence.

Sherwood Forest and the possible potential SPA

Some planning advice refers to the Sherwood Forest possible potential Special Protection Area (ppSPA), associated with nightjar and woodlark considerations.

This area has not been formally designated as an SPA. It should not be described as an existing international designation. Nevertheless, Natural England's updated December 2025 advice may be relevant when a scheme could affect suitable bird habitat.

A site-specific ecological assessment should establish the location, habitat and any potential impact pathway. The statutory BNG calculation does not remove these separate planning considerations.

Official source: Gedling's nature conservation and geological sites advice.

Local planning guidance

Does your Nottinghamshire development need statutory BNG?

Statutory BNG does not apply to every planning application. The correct exemption depends on the development category, timing and habitat impacts.

For qualifying new planning applications made on or after 6 August 2026, development on a red-line site of 0.2 hectares or less is exempt if it does not adversely affect onsite priority habitat.

Other exemptions include genuine householder applications, some developments with very small habitat impacts, and certain wholly temporary proposals permitted for five years or less. Each route has its own conditions.

The former specific exemption for self-build and custom-build development was removed for new planning applications made from 6 August 2026. Some older applications and section 73 variations have separate saved rules.

A site may therefore be small without being exempt. Similarly, a site might qualify for the Small Sites Metric without qualifying for an exemption.

An exemption from 10% statutory BNG does not mean an exemption from protected species law, designated-site requirements or other ecological planning policies.

For detailed eligibility examples and transitional routes, see ACP's BNG exemptions guide and the current government exemptions guidance.

Local planning guidance

Nottinghamshire planning policies: adopted requirements and emerging plans

A single county BNG percentage does not replace the adopted development plan for the actual site.

The statutory objective is generally at least 10% for in-scope applications. Local plans and supplementary guidance may add relevant ecological expectations, but they must be distinguished from draft proposals and national legislation.

Ashfield: saved 2002 policies and the proposed 2040 Local Plan

Ashfield's adopted policy framework still includes saved policies from its November 2002 Local Plan Review. Relevant environment policies include EV-series provisions, subject to their current status and consistency with national policy.

The Ashfield Local Plan 2023–2040 is at an advanced examination stage. Main Modifications were consulted on from 17 June to 30 July 2026.

The Council expected a final inspector report around November 2026. However, that timetable is not proof of adoption. The replacement plan was not verified as adopted on 7 November 2026.

As a result, applicants should confirm the applicable saved policy and current national BNG requirement, rather than presenting the emerging plan as operative.

Bassetlaw: the adopted 2024 plan and December 2025 BNG guidance

Bassetlaw adopted its Local Plan on 29 May 2024. Key ecological policies include ST37, Green and Blue Infrastructure, and ST38, Biodiversity and Geodiversity.

A dedicated Biodiversity Net Gain Supplementary Planning Document was adopted in December 2025. It gives additional advice on the BNG process and the district's planning expectations.

The council promotes a local-first approach to nature recovery. However, a local preference does not guarantee that suitable registered units are available or override the revised statutory hierarchy.

The BNG submission still needs the appropriate national baseline information, current metric and any additional local ecological evidence.

Broxtowe: adopted Policy 31 and the emerging Greater Nottingham plan

Broxtowe's adopted planning framework includes the 2014 Aligned Core Strategy and Part 2 Local Plan adopted on 16 October 2019.

Part 2 contains Policy 31, Biodiversity Assets, alongside relevant green infrastructure and landscape provisions.

Broxtowe is one of three councils preparing the Greater Nottingham Strategic Plan, together with Nottingham City and Rushcliffe. The plan was submitted for examination in December 2025, and hearings took place in July 2026.

It has not been verified as adopted. Therefore, its draft provisions must not be substituted for Broxtowe's current adopted policies.

Gedling: LPD18 and its separate emerging Local Development Plan

Gedling uses the 2014 Aligned Core Strategy and Local Planning Document adopted in July 2018. Policy LPD18, Protecting and Enhancing Biodiversity, is especially relevant.

Gedling withdrew from the Greater Nottingham Strategic Plan preparation in March 2025. It is now pursuing a separate replacement Local Development Plan.

Its Regulation 19 Publication Draft consultation ran from 22 June to 3 August 2026. Submission was expected in December, with further council decisions planned for late November and early December.

That draft is not an adopted replacement. Gedling also approved interim BNG guidance in April 2024; applicants should read it alongside the updated national legal position.

Mansfield: adopted 2020 plan and NE2

Mansfield adopted its Local Plan 2013–2033 on 8 September 2020. Policy NE2, Biodiversity and Geodiversity, supports habitat protection and measurable ecological improvement.

Mansfield's BNG guidance explains the role of the biodiversity metric, applicant statements and the formal Biodiversity Gain Plan.

However, parts of its public exemption list still include former self-build wording. That is not the current national rule for new applications from August 2026.

Therefore, confirm the adopted policy and local validation requirements, while using the latest government rules for exemption eligibility.

Newark and Sherwood: an important October 2026 plan adoption

Newark and Sherwood's Amended Core Strategy was adopted in March 2019 and includes Core Policy 12, Biodiversity and Green Infrastructure.

Importantly, the council adopted its Amended Allocations and Development Management Development Plan Document on 20 October 2026. This replaced the earlier 2013 allocations and development management document.

The updated document includes biodiversity and green infrastructure considerations, including DM7. For a specific proposal, its current adopted wording and policies map should be checked.

An application prepared from a pre-October 2026 policy summary may therefore rely on the wrong version of the development plan.

Rushcliffe: Policy 38 and the Greater Nottingham Strategic Plan

Rushcliffe's planning framework includes the 2014 Core Strategy and Part 2 Local Plan adopted on 8 October 2019.

Its detailed policies include Policy 36, Designated Nature Conservation Sites, Policy 37, Trees and Woodlands, and Policy 38, Non-Designated Biodiversity Assets and the Wider Ecological Network.

Rushcliffe also participates in the emerging Greater Nottingham Strategic Plan with Broxtowe and Nottingham City.

Its Developer Contributions SPD discusses BNG legal obligations and monitoring arrangements. However, fees and requirements for an actual project should be verified against current council information and statutory rules.

Nottingham City: adopted EN6 and separate plan-making processes

Nottingham City is a separate unitary planning authority. Its adopted framework includes the 2014 Aligned Core Strategy and the Land and Planning Policies Document adopted on 13 January 2020.

Policy EN6, Biodiversity, and the City's February 2020 Biodiversity SPD provide relevant local planning context.

The City is participating in the emerging Greater Nottingham Strategic Plan. Separately, it started a new-system Nottingham City Local Plan review in 2026. Its initial scoping consultation closed on 28 October 2026.

Neither process should be presented as a newly adopted replacement on this research date.

Local planning guidance

A county BNG Supplementary Planning Document does not create a blanket 20% rule

Nottinghamshire County Council adopted a BNG Supplementary Planning Document in September 2025. It supports applications under the County Council's planning responsibilities, especially minerals and waste.

The document refers to a shared aspiration for 20% biodiversity net gain where feasible. This is different from saying that all developments in Nottinghamshire must deliver 20%.

For ordinary housing and commercial planning applications, the relevant district or city plan must be considered. National guidance also requires higher local BNG targets to be justified through appropriate evidence.

Consequently, do not assume that a Nottinghamshire address automatically triggers 20% BNG. Identify the planning authority, the application type and any applicable adopted policy first.

Official source: Nottinghamshire County Council BNG SPD.

Local planning guidance

What BNG evidence should accompany a Nottinghamshire planning application?

The national minimum information generally includes a statement of whether BNG applies, a suitable baseline and pre-development biodiversity value, the completed metric and its version, and a scaled plan of existing habitats. Additional information may be needed about degradation or irreplaceable habitats.

The relevant council may also request further ecology evidence. The detailed local list varies by authority, application type and site constraints.

For example, Nottingham City asks for a BNG Statement, forecast post-development metric values and pre-development habitat condition assessments where BNG applies. The statement should explain the proposed gain route and any important onsite or off-site arrangements.

Bassetlaw provides its own minimum information guidance. Broxtowe's validation notes were updated in February 2024 to address BNG. Mansfield also describes a BNG Statement and the likely delivery strategy.

In Newark and Sherwood, the July 2024 local validation checklist includes a BNG assessment or strategy for in-scope applications. Its exact requirements must be checked against the correct current application type and the newly adopted 2026 plan.

Some older council lists still contain superseded exemption descriptions. Therefore, check national law first, then the latest council-specific supporting documents.

The formal Biodiversity Gain Plan is normally submitted after planning permission and before development begins. It is different from a preliminary BNG statement or strategy included with the initial application.

Local planning guidance

Six steps for a Nottinghamshire BNG assessment

1. Confirm the correct authority, site and application date

Check the red-line boundary, planning category and permission history. Establish whether the site is inside Nottingham City, a district or a county minerals/waste planning area.

2. Check legal exemptions and ecological constraints

Record whether statutory BNG applies and why. Consider protected sites, priority habitats, species, trees, hedgerows and watercourses separately.

3. Establish the habitat baseline

Undertake proportionate UKHab mapping and habitat condition assessment. Record a defensible baseline and identify significant ecological constraints before design decisions become fixed.

4. Consult the LNRS and use an appropriate metric

Check the Nottinghamshire and Nottingham Local Habitat Map for relevant potential measures. Use the statutory biodiversity metric or an eligible Small Sites Metric where appropriate.

The latest published statutory tool is version 1.1.1, updated on 10 November 2026. However, earlier published statutory editions remain permitted under current government guidance.

5. Test avoidance, design changes and delivery

Look for ways to avoid unnecessary habitat loss. Compare feasible onsite habitat retention, creation and enhancement. Where necessary, assess registered off-site gains against trading and spatial requirements.

6. Prepare the formal gain plan and secure management

For an in-scope permission, the Biodiversity Gain Plan generally needs approval before development starts. Significant onsite and registered off-site gains normally require legally secured management for at least 30 years.

Read about ACP's Biodiversity Gain Plan advice and Habitat Management and Monitoring Plans.

Local planning guidance

Delivering BNG onsite, offsite or through credits

The correct delivery route should follow the statutory gain hierarchy and the project's ecological evidence.

For major developments, avoiding adverse effects and suitable onsite habitat measures normally have priority before registered off-site gains. Statutory biodiversity credits are a final option.

For qualifying non-major applications made on or after 6 August 2026, onsite habitat creation, onsite enhancement and registered off-site gains have equal priority within the revised hierarchy. Statutory credits remain last. Earlier applications may follow saved rules.

Off-site biodiversity units must match the habitat types and trading requirements. Their legal security, registration and formal allocation to the development need verification.

For example, a site promoted as a possible habitat bank in Nottinghamshire does not automatically have units available for purchase. The same applies to land shown as an LNRS opportunity.

Where required, habitat creation or enhancement must be secured and managed for at least 30 years.

For related options, see ACP's off-site biodiversity units guide and the government biodiversity gain sites register.

Local planning guidance

Nottinghamshire BNG planning checklist

Need help preparing BNG evidence for your Nottinghamshire application?

Send ACP your site location, plans, proposed development and any existing ecological reports. We can help identify a proportionate assessment route.

Discuss your Nottinghamshire BNG assessment

Local planning guidance

How ACP Consultants can support your Nottinghamshire development

BNG should inform planning and design, rather than become a late-stage calculation exercise.

ACP can help identify the likely habitat surveys, interpret biodiversity metric requirements and assess practical habitat delivery options. Where protected sites, woodland or other ecological constraints matter, the work should also address the relevant separate planning duties.

A suitable scope will reflect the actual proposal, planning authority and project stage. It should not assume every Nottinghamshire site needs the same reports.

For more information, see ACP's BNG process guide and BNG consultant services.

Local planning guidance

Frequently asked questions about BNG in Nottinghamshire

Is Biodiversity Net Gain mandatory for every development in Nottinghamshire?

No. Statutory BNG generally applies to qualifying planning permissions, but exemptions and transitional arrangements apply. The development category, application date, site area and habitat impacts need checking.

Does Nottinghamshire require 20% BNG instead of 10%?

There is no verified blanket adopted 20% requirement across every district and city. Nottinghamshire County Council's BNG guidance refers to a shared 20% aspiration where feasible, particularly in its planning context. The statutory objective is normally 10% for in-scope schemes, subject to applicable adopted policy.

Does Nottingham City use the same Local Plan as Nottinghamshire's districts?

No. Nottingham City Council is a separate unitary planning authority. It has its own adopted 2014 core strategy and 2020 Land and Planning Policies, while the seven districts have separate adopted plans.

Does the Nottinghamshire Local Nature Recovery Strategy include Nottingham City?

Yes. The published strategy covers Nottinghamshire and Nottingham, including the city. It was published on 10 November 2025, with Nottinghamshire County Council acting as the responsible authority.

Does being inside a nature recovery opportunity area increase my biodiversity units automatically?

No. The proposed habitat action must match the relevant mapped potential measure, location and current metric criteria. An LNRS opportunity area is not a field survey or permission for habitat works.

Can a small development of 0.2 hectares or less be exempt?

For qualifying planning applications made on or after 6 August 2026, the new exemption can apply if the red-line site is no larger than 0.2 hectares and no onsite priority habitat is adversely affected. Earlier applications and variations require separate checks.

Are self-build homes automatically exempt from BNG?

No. The former specific self-build and custom-build exemption was removed for new planning applications made from 6 August 2026. A separate exemption may apply if its own conditions are met.

What is different about Bassetlaw's BNG requirements?

Bassetlaw adopted a new Local Plan in May 2024 and dedicated BNG Supplementary Planning Document in December 2025. Applicants should check the current ST37/ST38 policies and the district's submission advice.

Why does the October 2026 Newark and Sherwood Local Plan change matter?

Newark and Sherwood adopted an amended Allocations and Development Management Plan on 20 October 2026. It replaced the earlier 2013 version, so current planning policies and maps must be used.

Is Sherwood Forest already a designated Special Protection Area?

The Sherwood Forest possible potential SPA has not been formally designated. However, relevant nightjar and woodlark evidence may still need considering in suitable circumstances. Follow current Natural England advice and check actual ecological effects.

Can I purchase off-site biodiversity units for a Nottinghamshire site?

Potentially, where the statutory hierarchy and metric trading rules allow. Units must be suitable, legally secured, registered and allocated. An advertised habitat bank is not proof of available or compatible units.

What should I send ACP for a Nottinghamshire BNG quotation?

Provide a site location or red-line plan, proposed works, design drawings, application stage, planning authority if known and any existing ecology reports. These help identify the likely survey and calculation scope.

Local planning guidance

Discuss biodiversity net gain for your Nottinghamshire site

Whether you are preparing an application, reviewing existing habitat evidence or exploring ways to deliver biodiversity gain, the starting point is the site itself.

Tell ACP about your Nottinghamshire project. We can help explain the likely BNG assessment route, ecological constraints and next steps.

Request Nottinghamshire BNG advice

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.