Nottingham BNG advice
Biodiversity Net Gain in Nottingham
Plan your Nottingham development around local habitats, planning requirements and practical biodiversity gains.
ACP Consultants can help with habitat surveys, biodiversity metric calculations and a practical BNG delivery plan for your Nottingham site.
Local planning
Who decides development applications in Nottingham?
Nottingham City Council determines ordinary applications within the city’s administrative boundary. Nottinghamshire County Council leads the shared LNRS and jointly prepared Waste Local Plan, but does not decide ordinary City residential planning applications. Neighbouring Greater Nottingham districts use their own Local Plans, even where the postal address says Nottingham. The City Council’s Waterside guidance is relevant only where an actual proposal falls within that regeneration area.
Local planning
Adopted and emerging planning policy
Start with the adopted policies and the actual site boundary. Then establish the evidence needed for the proposal and its planning stage.
Which adopted biodiversity policies apply in Nottingham?
The operative City Local Plan comprises the Aligned Core Strategy adopted 8 September 2014, with Core Policy 17 on biodiversity, and the Land and Planning Policies Document adopted 13 January 2020. Policy EN6 Biodiversity in Part 2 expects development to protect and promote city ecology, including local wildlife sites and habitat connectivity. The Nottinghamshire and Nottingham Waste Local Plan was adopted in September/October 2025; that waste framework does not replace the ordinary city development-management policies.
| Adopted policy or document | What it covers | Practical implication for the application |
|---|---|---|
| Core Policy 17 — Biodiversity | What it coversAligned Core Strategy adopted 2014 | Practical implication for the applicationRetain and enhance appropriate habitat networks; test loss of connected green space and priority habitat before considering replacement. |
| EN6 — Biodiversity | What it coversNottingham City Local Plan Part 2 adopted January 2020 | Practical implication for the applicationExplain habitat retention, local wildlife-site effects, mitigation and possible onsite/offsite biodiversity improvements. |
| Waterside SPD — Sustainable residential regeneration | What it coversAdopted June 2019 for identified waterside area | Practical implication for the applicationFor an actual Waterside parcel, test green/blue infrastructure connections, Trent and canal impacts and the approved public-realm setting. |
The requirements above are separate from the later national statutory BNG condition. A project should not achieve numerical gains by damaging priority habitats, designated land or protected species. Existing trees, water bodies, wetlands, wildlife corridors and high-value grassland must be assessed under their own applicable protections.
Which proposed plans should applicants monitor?
Nottingham City started a different new Local Plan process with a formal notice on 30 June 2026, and its scoping consultation closed 28 October 2026. A Gateway 1 self-assessment was published on 31 October. Separately, the Greater Nottingham strategic plan review, involving neighbouring districts, was submitted for examination in December 2025 with hearings in July 2026. Neither workstream means a new Nottingham City replacement plan has already been adopted; use the 2014/2020 adopted plans for current applications.
A consultation or Gateway stage is not an adopted Local Plan. Therefore, the plan currently in force, any relevant made neighbourhood plan and the 2026 National Planning Policy Framework continue to guide decisions.
Nature recovery
How does the Local Nature Recovery Strategy apply to Nottingham?
Nottinghamshire County Council’s final Nottinghamshire and Nottingham LNRS was approved by Cabinet on 10 September 2025 and published 10 November 2025. The official Local Habitat Map covers Nottingham City as well as the county districts. City projects should identify location-specific measures that suit urban open spaces, river corridors, trees, wetlands, green roofs or connected habitats, rather than assigning an uplift from county-level mapping without an exact parcel/action match.
An ecologist must test whether a proposed enhancement genuinely matches the relevant mapped measure. An LNRS opportunity polygon cannot replace a field survey, create units automatically or make a habitat gain site legally registered. Download the current map and retain its source/date when justifying strategic significance.
Local ecology
Local habitats and site considerations
Use habitats within and connected to your site to scope surveys and retain important ecological connections.
Habitats and ecological connections
The River Trent and its floodplain, the Nottingham and Beeston Canal and the River Leen provide green and blue corridors where watercourse condition, banks, trees and access may matter. Former railway, industrial and canal-side land can also contain habitats that are easy to miss in a generic garden-led design. Urban parkland and retained mature trees can support bat commuting routes and birds, but habitat value must be surveyed for the actual development site.
Nottingham’s locally designated wildlife sites, priority habitats and riverside ecology deserve careful retention and impact assessment under adopted EN6. Internationally designated-site or species effects depend on a particular proposal and cannot be inferred simply from being close to the Trent. For river engineering, the metric's watercourse module and a competent river condition assessment may be relevant, while tree/roost and lighting measures remain separate legal issues.
Protected-species licensing, statutory site impact assessment, woodland or tree protection and any relevant watercourse assessment remain separate from BNG. A development exempt from the statutory condition may still need to avoid or mitigate ecological harm.
Development and habitat design
The City Council’s Waterside SPD, adopted June 2019, guides regeneration between Meadow Lane/Daleside Road, Trent Lane, the River Trent and Nottingham/Beeston Canal. It is an actual planning guidance area, not a statement that all Trent land has the same policy requirements. For development within its boundary, retain existing riparian habitat, design green routes and ensure new drainage and habitat creation complement the adopted public realm and flood strategy.
For a constrained scheme, first map existing vegetation, watercourses and habitats, then compare the proposed layout with avoidance and retention options. Habitat creation must suit soils, drainage, shading, public access and achievable long-term management. Do not infer biodiversity condition from the former industrial or agricultural land use.
Planning evidence
What can applicants learn from local evidence?
Nottingham City Council’s published Waterside SPD describes a planned mixed-use to residential transition of former industrial land with connections to the Trent and canal. The SPD is dated planning guidance, not an approved statutory BNG unit result or proof that an individual developer has completed habitat creation. It demonstrates why biodiversity layout, waterfront access and drainage should be considered before fixing detailed housing plots.
Planning evidence
What BNG evidence does Nottingham City Council expect?
For development subject to statutory BNG, the national application-stage information normally includes:
- Whether the applicant considers the biodiversity gain condition applicable, with reason if exempt.
- The pre-development biodiversity value, completed appropriate published statutory metric, and version/publication date.
- Any earlier baseline date and reasons where relevant.
- Details of habitat degradation and earlier calculations where applicable.
- Any irreplaceable habitat on the red-line site.
- A scaled map showing current onsite habitats and a north point.
Nottingham City’s dedicated BNG applicant guidance confirms the Article 7 minimum information, but also explains why it may seek a BNG Assessment and Report and feasible pre/post-development habitats at the initial application stage. Where significant onsite/offsite habitats are planned, the Council looks for realistic long-term legal security. Check the current application category and the council’s Nottingham-specific validation list; do not treat the later final Gain Plan as always required with the first application.
Additional ecology or landscape reports may be necessary and proportionate for specific impacts. Confirm the current council validation checklist and application type rather than assuming one universal report package. The final Biodiversity Gain Plan is normally approved after planning permission, before commencement, rather than being required universally with the first application.
For help commissioning evidence, see our BNG assessment service and habitat surveys.
National requirements
What are the current statutory rules?
Qualifying development in England normally needs 10% statutory BNG. From 6 August 2026, a new application on a whole development site of 0.2 hectares or less can be exempt where no onsite priority habitat is adversely affected. Certain wholly temporary schemes lasting five years or less may also qualify; the former dedicated self/custom-build exemption no longer applies to new applications. Older cases and section 73 permissions require their own transitional assessment.
The 29 September 2026 NPPF, policies N1(2) and N2(3), restricts mandatory local BNG requirements above the statutory level to specific, justified and deliverable allocations. A general aspiration to improve biodiversity should not be misrepresented as an adopted blanket 20% requirement.
The latest government statutory metric, as at 10 November 2026, is v1.1.1, updated 10 November 2026. GOV.UK permits any published statutory metric version where appropriate; pre-statutory Metric 4.0 is not an accepted mandatory tool. An eligible smaller scheme may instead use the separate Small Sites Metric.
For decision criteria, see our BNG exemptions guide and statutory biodiversity metric service.
Habitat delivery
What if suitable biodiversity gains cannot be delivered onsite?
The City Council’s BNG page discusses Section 106 and conservation-covenant routes for significant onsite or offsite gains. It historically said it was not itself a Responsible Body; that historic organisational statement is not a live register of current local unit suppliers. Developers should independently verify the actual gain site, legally secured habitat units and spatial risk through the government register before entering a purchase.
For major development, appropriate onsite creation/enhancement normally has priority under the national gain hierarchy. For qualifying non-major applications made from 6 August 2026, onsite and registered offsite gains may be considered at an equivalent hierarchy level. Statutory biodiversity credits remain the last resort.
Any proposed offsite units must meet habitat-trading, spatial-risk, legal agreement, government gain-site registration and allocation rules. A local supplier's brochure, LNRS opportunity map or projected bank cannot demonstrate current saleable units. Significant onsite and registered offsite gains generally require at least 30 years of secure habitat management.
Our offsite biodiversity units guide and Habitat Management and Monitoring Plan service explain the respective stages.
Your site checklist
Seven checks before commissioning a BNG calculation
Use these seven checks to prepare a proportionate brief for your site assessment and planning submission.
| Check | Site evidence | Why it matters |
|---|---|---|
| Planning authority | Site evidenceConfirm the red-line boundary and the actual decision-maker: Nottingham City Council; check any separately identified planning geography. | Why it mattersSelect the correct adopted plan, map and application validation list. |
| BNG applicability | Site evidenceRecord the application date, whole site hectares, onsite priority habitats, development type and any earlier or section 73 permission. | Why it mattersTest the legally correct exemption, transition and delivery hierarchy. |
| Surveyed habitat | Site evidenceObtain UKHab parcels, habitat conditions, hedgerows, watercourses, trees, photographs and protected-species evidence. | Why it mattersDetermine survey scope, habitat condition and appropriate statutory metric modules. |
| Published LNRS | Site evidenceCheck the Nottinghamshire and Nottingham LNRS current Local Habitat Map and the exact matching habitat measure, not just an opportunity colour. | Why it mattersJustify the proposed measure against the published LNRS map and site location. |
| Protected sites | Site evidenceNottingham City EN6 / local wildlife sites; River Trent, Leen or canal corridor impacts and any bats, roosts or river condition need evidence if actually affected. | Why it mattersIdentify HRA, protected species, watercourse or other separate safeguards. |
| Gain-delivery route | Site evidenceTest viable onsite habitat, current habitat trading, genuine government-registered off-site allocation and significant enhancement management. | Why it mattersCheck actual habitat trading, registered allocations, spatial risk and feasible habitat creation. |
| Application and stewardship | Site evidenceUse the appropriate council's application documents and prepare final gain-plan and long-term management at the right stage. | Why it mattersAlign initial evidence, postpermission gain-plan approval and long-term stewardship. |
Project delivery
Project planning and delivery
Build the planning evidence around a consistent habitat baseline, site layout and metric. The steps below connect the application documents with practical habitat delivery.
Budget and long-term delivery
Nottingham’s BNG guidance identifies legal security and monitoring obligations for significant habitat enhancements. For a riverside redevelopment, allow separate work for UKHab and condition, potential river and protected species surveys, design of onsite gains, legal agreements and any approved monitoring arrangement.
Keep the costs of UKHab and condition surveys, the statutory metric, targeted protected-species work, registered offsite biodiversity units, legal obligations, and long-term habitat monitoring separate. These are not interchangeable fees. No generic market price can replace an actual quotation, and a council fee documented for a protected-site scheme is not the price of statutory BNG units.
A final Biodiversity Gain Plan for qualifying permission normally comes after consent and before commencement. Significant gains need realistic legal stewardship and a suitable habitat management/monitoring plan, often for at least 30 years.
Read our Biodiversity Gain Plan guide and BNG cost categories.
Three assessment stages
First — establish the planning context. Supply the development boundary, proposals, expected application date and known planning authority. Identify current adopted policy, national BNG applicability, LNRS territory and any important constraints.
Next — survey and calculate. Scope UKHab, habitat condition, area/hedgerow/watercourse modules and, where justified, protected-species or Habitats Regulations work. Record metric version and survey assumptions transparently.
Then — plan realistic delivery. Seek habitat retention and appropriate onsite design. Assess any registered offsite shortfall and long-term management needs, without promising units or planning permission before a defensible assessment.
Local planning guidance
Frequently asked questions
These answers cover common planning, habitat and delivery questions for projects in Nottingham.
Does Nottingham have a current adopted biodiversity policy?
Yes. Nottingham City’s 2020 Part 2 Local Plan Policy EN6 works alongside its adopted 2014 Core Policy 17. These continue to inform habitat protection and green infrastructure even though a replacement city plan is in preparation.
Is the Nottinghamshire LNRS the same as the City's Local Plan?
No. The 2025 published Nottinghamshire and Nottingham LNRS is a strategic nature-recovery map led by the County Council. Nottingham City Council remains the planning decision-maker in the city and applies its own adopted development plan and validation requirements.
Does the Waterside SPD apply to all Nottingham riverfront development?
No. The June 2019 Waterside SPD applies to the defined regeneration area between the Trent, canal and identified roads. Check the actual policies map and whether the red-line site lies inside it before relying on that local guidance.
Can former industrial land in Nottingham be valued as zero biodiversity?
No. Urban brownfield sites can contain open-mosaic habitats, trees, scrub, grassland and water features. An appropriate UKHab survey and condition assessment must determine the actual baseline; previous land use alone is not the metric.
Does Nottingham City Council require a draft BNG assessment?
Its published BNG guidance explains local expectations for a BNG Assessment and Report on applicable schemes. The exact documents depend on application type and site effects; the statutory final Biodiversity Gain Plan is ordinarily approved after permission.
Are Nottingham and Nottinghamshire Council planning requirements interchangeable?
No. The City Council determines ordinary city applications, while surrounding districts and the County Council have different planning roles. Shared waste planning and the LNRS do not make one joint application-validation list for every scheme.
Does every Nottingham development need 10% Biodiversity Net Gain?
No. Qualifying development normally needs 10%, but the legal exemptions and transitions are important. New applications from 6 August 2026 can qualify for the conditional exemption on a site of 0.2 hectares or less where no onsite priority habitat is adversely affected. Protected species and habitats can require separate evidence.
Can a small site in Nottingham use the Small Sites Metric?
Only if the development and habitats meet the government's Small Sites Metric eligibility rules. Site area or number of dwellings alone does not decide this. The main statutory metric may be required instead, particularly where sensitive habitats or other exclusions apply.
When is the final Biodiversity Gain Plan approved in Nottingham?
For eligible permissions the final Biodiversity Gain Plan is normally submitted and approved after planning permission and before development starts. The original application needs the national baseline information plus any necessary and proportionate evidence required under the correct authority's current validation list.
Can I purchase off-site biodiversity units for a Nottingham project?
Potentially, provided the units meet the relevant habitat-trading, registration, legal allocation and spatial-risk rules. Availability, unit classes and prices have to be checked for the actual scheme. A supplier's website or nature-recovery map is not proof of available allocated units.
Project support
How ACP can help with your Nottingham project
ACP can help you plan the surveys, calculations and documents your site needs. We agree the scope around your proposal, its planning stage and the habitats affected.
Survey, design and planning support
- Habitat surveys and condition assessments.
- Statutory metric calculations and design options.
- BNG reports and planning submission support.
- Gain plans and habitat management documents.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Nottingham BNG
Sources and references
Reviewed 10 November 2026.
Official planning and nature recovery sources
- Nottinghamshire and Nottingham LNRS
- The Adopted Local Plan
- Adopted LAPP Part 2 policy text
- Biodiversity Net Gain planning guidance
- Nottingham City Local Plan Review
- Nottingham Local Plan Review Consultation News
- Waterside SPD
- LNRS Cabinet approval
- Current national BNG guidance
- Updated statutory metric tools
- National Planning Policy Framework: biodiversity policies N1 and N2