Regional field guide · West Midlands
Biodiversity Net Gain in the West Midlands
Find your planning authority and see how local developments have delivered off-site gains.
Biodiversity net gain in the West Midlands can involve a canal-side site in Birmingham, an orchard in Herefordshire or an Avon flood meadow. Use the regional map to choose the right plan. Then follow the evidence from the site survey through to delivery.
Regional atlas
Which West Midlands authority covers your site?
The statistical region contains 30 district, borough, city and unitary councils. Seven form the West Midlands metropolitan area. Select a strategy area below to find its planning councils and habitat map.
Simplified Local Nature Recovery Strategy boundaries from Natural England. Contains OS data © Crown copyright and database right 2024. Boundary dataset · Open Government Licence v3.0.
Herefordshire
Hereford, Leominster, Ledbury and Ross-on-Wye
Herefordshire Council is the unitary planning authority. For land near the Welsh border, establish which side contains each parcel and whether activities affect the river downstream.
Published LNRS · August 2026
Herefordshire Council
The Wye, Lugg, traditional orchard belt and hedged farmland offer different recovery opportunities. Check both mapped habitat measures and any catchment-specific nutrient assessment.
Planning council directory (1)
Herefordshire.
Shropshire and Telford & Wrekin
Shrewsbury, Telford, Ludlow, Oswestry and Bridgnorth
The two unitary councils share one strategy. They determine applications under different development plans. Check which side of the Telford and Wrekin boundary the red line occupies.
Published LNRS · 22 April 2026
Shropshire Council
Use the habitat and opportunity map to trace river corridors, the meres and mosses, and connections between upland and lowland grasslands. Survey wetland hydrology before setting a target condition.
Planning council directory (2)
Shropshire · Telford and Wrekin.
Staffordshire and Stoke-on-Trent
Stoke-on-Trent, Stafford, Burton upon Trent, Lichfield, Tamworth and Leek
Stoke-on-Trent is unitary. Elsewhere, start with the district or borough for ordinary applications. The Peak District National Park Authority decides most applications inside its boundary, including parts of the Staffordshire Moorlands.
Draft LNRS · Consultation closed 27 July 2026
Staffordshire County Council
Use the draft map as emerging evidence. Cannock Chase heath, the Trent valley, lowland mosses and the Churnet catchment have different requirements for water, soil and management.
Planning council directory (9)
Cannock Chase · East Staffordshire · Lichfield · Newcastle-under-Lyme · South Staffordshire · Stafford · Staffordshire Moorlands · Stoke-on-Trent · Tamworth.
Warwickshire
Warwick, Leamington Spa, Rugby, Stratford-upon-Avon and Nuneaton
The five districts and boroughs determine most applications. Coventry and Solihull fall in the metropolitan strategy area. Check the correct local validation list even when the same county ecology service advises different councils.
Use our Warwickshire BNG guide for the five councils’ adopted plans, habitat map and submission checklist.
Published LNRS · May 2026
Warwickshire County Council
River Avon flood meadows, the Arden landscape and the Dunsmore and Feldon lowlands offer contrasting opportunities. Look for connections to nearby grassland and hedgerow networks.
Planning council directory (5)
North Warwickshire · Nuneaton and Bedworth · Rugby · Stratford-on-Avon · Warwick.
West Midlands metropolitan area
Birmingham, Coventry, Dudley, Sandwell, Solihull, Walsall and Wolverhampton
The combined authority leads this strategy. Each of its seven metropolitan councils has its own planning responsibilities. Use the relevant council’s policies and evidence list for a development application.
Published LNRS · 27 November 2025
West Midlands Combined Authority
Canals, rail corridors, former industrial land, urban trees and river valleys can connect fragmented habitats. The strategy sets out 62 actions; identify the one that fits the parcel.
Planning council directory (7)
Birmingham · Coventry · Dudley · Sandwell · Solihull · Walsall · Wolverhampton.
Worcestershire
Worcester, Redditch, Kidderminster, Evesham, Bromsgrove and Great Malvern
Six councils handle most development applications. Worcester, Wychavon and Malvern Hills share the South Worcestershire plan. Bromsgrove, Redditch and Wyre Forest have their own plans.
Published LNRS · Adopted February 2026
Worcestershire County Council
The Severn and Avon floodplains, ancient woodland, traditional orchards and lowland meadows need different survey and management methods. Compare the map’s existing sites with its potential measures.
Planning council directory (6)
Bromsgrove · Malvern Hills · Redditch · Worcester · Wychavon · Wyre Forest.
Planning authority
Start with the red line and the consent route
The West Midlands Combined Authority (WMCA) leads nature recovery across the seven metropolitan councils. Across the wider West Midlands region, different bodies write the strategies, decide applications and secure habitat management.
Choose the deciding council
A Coventry address belongs to the metropolitan strategy; a nearby Warwickshire parcel can belong to the county strategy. Likewise, Telford and Shrewsbury share a recovery map but have separate planning authorities.
Check the red line, including access and drainage. For cross-boundary proposals, contact the relevant councils before agreeing survey scope. Find a council · ONS regional geography.
Check special planning powers
In the Staffordshire Moorlands, Leek and the national park have different application routes. Inside the Peak District, the national park authority normally handles town and country planning applications. A National Landscape designation alone does not transfer that role.
Minerals, waste and certain county development can go to the county council in a two-tier area. Use the authority for the particular proposal. Peak District development policies.
Check proposed boundaries separately
On 29 October 2026 the government withdrew its July decision on Staffordshire and Stoke-on-Trent for further review. Warwickshire’s councils reported a proposed north/south split. Worcestershire’s leaders also reported plans for two unitary authorities.
These are future arrangements. Use today’s authorities and policies for a current application. Staffordshire update · Warwickshire update · Worcestershire update.
Development plans
Which local policies change the design brief?
The region has no single Local Plan. A 10% metric result answers one question. The deciding authority must also consider the habitats, designations and ecological networks protected by its adopted policies.
Birmingham · TP7 and TP8
The January 2017 Birmingham Development Plan addresses green infrastructure in TP7 and biodiversity and geodiversity in TP8. Its hierarchy includes Sites of Importance for Nature Conservation and Sites of Local Importance for Nature Conservation.
On a canal or rail-side regeneration site, show how lighting, access and building edges affect the adjoining corridor. Birmingham consulted on its replacement Publication Plan in August and September 2026. Record its emerging status separately. Adopted Birmingham policies · Publication Plan consultation.
Dudley · DLP32
Dudley adopted its Local Plan to 2041 on 13 July 2026. DLP32 addresses the Nature Recovery Network and requires qualifying development to deliver at least 10% biodiversity gain. The plan also addresses geological interest across the Black Country.
Overlay the development boundary on the local ecological network. For a former quarry or industrial plot, show how habitat retention, geological features and public access influence the layout. Dudley’s plan applies within the borough. Read DLP32 · Adopted plan and policies map.
South Worcestershire · SWDPR 29 and 30
The plan adopted on 26 March 2026 covers Worcester, Wychavon and Malvern Hills. SWDPR 29 protects biodiversity and geodiversity. SWDPR 30 addresses the statutory gain, management and monitoring, and asks for justification where the applicant proposes off-site delivery.
For a housing site near Worcester or Evesham, retain drawings of the on-site options and explain the constraints. For a qualifying minor scheme, also identify how the August 2026 national hierarchy applies. Read the adopted policies, pages 102–107.
Shropshire and Telford · different plans on the same map
Shropshire’s adopted SAMDev policy MD12 protects the natural environment alongside Core Strategy policies CS6 and CS17. The council keeps the withdrawn replacement plan in its archive. In Telford and Wrekin, a separate replacement plan has reached a later stage.
As at 5 November 2026, Telford’s inspectors had issued their report and Cabinet consideration was scheduled for 12 November. Check the adoption decision before relying on the emerging text. Read MD12 · Shropshire plan archive · Telford adoption timetable.
Herefordshire · LD2 and LD3
LD2 covers biodiversity and geodiversity; LD3 covers green infrastructure. The council identifies trees, hedgerows, watercourses and adjoining floodplain as features that can connect habitats. These policies matter even where a statutory BNG exemption applies.
For a Hereford edge-of-settlement site, show retained hedge links and the habitats receiving drainage outfalls. Where nutrient neutrality also applies, prepare a separate catchment assessment. Herefordshire policy extracts · Catchment mitigation guidance.
Stafford and Stratford · N4 and CS.6
Stafford Borough’s N4 addresses the natural environment and green infrastructure. Its biodiversity SPD helps applicants interpret the policy. In Stratford-on-Avon, Core Strategy CS.6 addresses the natural environment under a separate plan.
Check the relevant plan and local evidence before costing land near the M6, HS2 corridor or the Avon valley. The Warwickshire county ecology service can advise several councils, but the application still follows the deciding council’s list. Stafford biodiversity SPD · Stratford Core Strategy · Warwickshire validation routes.
National framework
When does an application need a biodiversity gain plan?
For a qualifying planning permission, the statutory objective is at least 10% biodiversity gain over the pre-development baseline. The application date matters. So do the red-line area, the habitats affected and the type of consent.
Small sites and temporary development
For applications made from 6 August 2026, the exemption for sites of 0.2 hectares or less uses the whole red-line area. An impact on on-site priority habitat prevents use of that exemption. Wholly temporary development permitted for five years or less has a separate test.
For a small infill plot, check the hedge and adjoining access before relying on the site-size exemption. New self-build or custom-build applications no longer qualify solely on that basis. Check the exemptions and dates · BNG exemptions guide.
Avoid loss before choosing a unit supplier
First avoid or mitigate adverse effects on medium, high and very high distinctiveness on-site habitats. For major development, then give priority, where possible, to enhancing on-site habitat, creating it on site and securing registered off-site gains, in that order.
For qualifying non-major applications made from 6 August 2026, those three compensation options have equal preference. Government credits are the final route. Planning practice guidance · Current delivery rules.
Gain plan, commencement and management
Ordinary planning permission and approval of the gain plan are separate decisions. The authority normally needs to approve the plan before works start. Secure significant on-site enhancements and registered off-site gains for at least 30 years.
For phased permission, check overall and phase-specific requirements. Nationally significant infrastructure applications submitted from 2 November 2026 use the development consent route and relevant biodiversity gain statement. Biodiversity Gain Plan support · National guidance on infrastructure.
Local Nature Recovery Strategies
Five published strategies and one draft
Use the six directory entries above to locate the responsible body. On 5 November 2026, Defra listed five published strategies in this region. Staffordshire and Stoke-on-Trent remained in preparation, with public consultation on the draft already closed.
Choose the correct map layer
The metropolitan strategy covers Birmingham and six neighbouring councils. The Warwickshire strategy covers the five county districts. Across either boundary, the relevant mapped opportunities can change even along the same river.
Find the parcel, identify the layer and read its legend. Existing habitat of particular importance and a proposed restoration measure answer different questions. Metropolitan strategy · Warwickshire strategy.
Connect the measure to a habitat
Strategic significance in the statutory metric depends on the location and proposed habitat or intervention. A mapped river corridor may support riparian habitat, for example, while an unrelated planting scheme at the same location needs a different justification.
Save the map version, date, parcel reference and exact measure. Check the baseline and proposed habitat separately. Carry the explanation into the gain plan and management prescriptions. Use the statutory metric guidance.
Handle the Staffordshire draft explicitly
The Staffordshire partnership consulted from 1 June to 27 July 2026. Its forward plan schedules Cabinet consideration for 18 November. A proposed publication date does not establish a final strategy.
Record the source and status used for the calculation. Where an LNRS is unpublished, agree the appropriate draft or alternative local strategy with the authority and use the current metric instructions. Read the draft and consultation status · Cabinet decision timetable · Defra guidance for habitat providers.
Public planning record
Cleeve Prior: from a housing permission to 3.03 off-site units
The planning decision and the national gain-site register explain different parts of the same Worcestershire project. The application reference connects them across a county boundary.
Read the permission
Wychavon approved 61 homes, public open space, landscaping and access off Evesham Road on 17 July 2025. The decision identifies the biodiversity gain condition and requires evidence securing management of off-site habitat.
The decision predates the March 2026 South Worcestershire plan. Read the conditions against the permission it actually received, then check the current plan for a new application. W/24/00632/FUL decision and documents.
Match the allocation
Avon Meadows in Stratford-on-Avon is registered as BGS-171125001. Its allocation tab names W/24/00632/FUL and records 3.03 area units against 0.351 hectares of other neutral grassland targeting good condition.
Hectares describe land area; biodiversity units describe the calculated value. Keep both numbers with the project reference when reconciling the development metric and provider offer. Open Avon Meadows and select Allocation.
Check the outstanding evidence
An allocation shows which off-site gain is assigned to that development. The signed agreement, habitat management plan and authority’s gain-plan decision answer separate questions about delivery and commencement.
For a similar scheme, cross-check the parcel, habitat, condition, units and dates. Obtain the relevant approval before starting works. The published records do not disclose the commercial price paid. What the register records · Prepare a Biodiversity Gain Plan.
Off-site delivery
Where are West Midlands habitat banks located?
These examples are identifiable on Natural England’s register. For a purchase, ask the operator about the exact habitat needed, current unallocated stock, timing and any spatial adjustment. Register totals are not sales quotations.
Avon Meadows · Warwickshire
This 17.43-hectare gain site sits beside the River Avon in Stratford-on-Avon district. The register gives grid reference SP2239356329 and an obligation end date of 12 November 2058. The Cleeve Prior entry is one of several named development allocations.
Ask for the parcel and habitat behind the proposed sale. The register also lists a Nuneaton and Bedworth retirement scheme and a Tewkesbury project; one provider can serve more than one authority. Operator’s site profile · Register entry.
Winnington · west of Shrewsbury
Winnington is in Shropshire and the Shropshire Hills National Character Area. Natural England records 33.89 hectares and an enhancement start date of 20 December 2022. The operator describes plans for lowland meadow, neutral grassland, scrub and woodland.
The allocation tab identifies Burford Church of England Primary School, reference 26/00085/FUL. Its 0.14 area units include lowland meadow and other neutral grassland. Check the habitat mix as well as the total. Winnington allocations · Provider and location.
Eccleshall · Stafford Borough
Environment Bank identifies this site within the Shropshire, Cheshire and Staffordshire Plain National Character Area. The register records 21.98 hectares at SJ8262426162, with enhancement works starting on 24 November 2025.
Its proximity to Cop Mere and other designated sites helps explain the operator’s habitat choices. For a Stafford or Stoke site, run the actual spatial calculation before comparing its offer with a more distant one. Eccleshall register entry · Operator’s delivery proposals.
For area and hedgerow units, check the relevant planning authority and National Character Area. Watercourses use catchment relationships. Neither a regional name nor straight-line distance settles the statutory calculation. Guide to off-site biodiversity units · Metric user guidance.
Regional habitats
What should the survey look for?
The regional landscape helps define the survey questions. It cannot establish what is present on a particular plot. Site history, field evidence and the works boundary come first.
Black Country brownfield and urban waterways
Former mine workings, rail sidings and vacant industrial land can support open mosaic habitat. A canal edge can also be a movement route through a built-up area. A land-use label will not distinguish bare concrete from sparsely vegetated, species-rich ground.
Survey the mosaic before remediation. Map seasonal interest, geological exposures, access and lighting. Where contaminated soils rule out a proposed habitat, revise the layout or target condition while options remain open. Dudley nature recovery policy.
Herefordshire orchards, the Wye and the Lugg
A traditional orchard can depend on the age structure of its trees, grassland management and standing deadwood. A new block of fruit trees cannot immediately replace those features. In the Lugg catchment, a development may also need to demonstrate phosphate neutrality.
Record veteran features and roots, then plan replacement planting and aftercare. Keep nutrient removal and statutory biodiversity units on separate schedules. Landscape and biodiversity policies · Herefordshire nutrient requirements.
Staffordshire heath and Shropshire wetlands
Cannock Chase has protected heathland and sensitive visitor routes. The meres and mosses of north Shropshire depend on water quality and levels. A development can affect either landscape beyond the footprint entered into the metric.
Consider recreation, drainage and hydrological links early. Where an irreplaceable habitat is present, follow its bespoke statutory treatment. For national park land, check the park authority’s evidence requirements too. Irreplaceable habitat guidance · Shropshire habitat opportunities.
The Severn, Tame and Avon
Watercourse condition, floodplain habitat and hedgerows use different evidence and metric modules. A positive area-unit result cannot remedy a watercourse deficit. A proposed wet meadow also needs the right flooding pattern, soil and long-term access.
Give the ecologist and drainage designer the same channel, buffer and outfall drawings. Then test delivery against land ownership and maintenance duties. River condition assessment · Habitat condition assessment.
Cost and management
Separate unit prices, council fees and protected-site mitigation
A budget for West Midlands BNG may include the baseline assessment, habitat works or private units, legal agreements, registration, monitoring and remedial work. Each sum pays for a different task.
Private units · compare like-for-like offers
The Malvern Hills Habitat Bank Number 1 listing gives a price on application. The public registers for the three examples above identify habitat and allocations; they do not publish a transaction price. A quote for neutral grassland gives little guidance on the price of a river or priority meadow unit.
Give each provider the module, habitat, target condition and development location. Ask for an adjusted quantity, VAT basis, allocation fee, legal costs and expiry date in writing. View the Malvern Hills listing · How sellers set unit prices.
Warwickshire · provider review and covenant fees
For a landowner seeking the county council’s review of a habitat bank, the published process starts with a free expression of interest. Its diagram gives approximate fees of £990 for initial review, £4,000–£9,000 for technical reviews and £4,000 for final review. VAT is excluded.
The final stage includes monitoring review fees and finalising the covenant. Size, complexity and additional advice can alter the quote. Budget separately for habitat works, long-term management and Natural England registration. Council fee diagram · Staged review process · National registration charges.
Worcestershire · monitoring over the agreement period
The county’s published framework relates monitoring effort to scheme scale and complexity. Its worked charges are labelled draft, indicative and for 2025/26. For a current application, ask the actual deciding council for its terms and indexation.
Identify who pays for condition surveys, who reviews the reports and who funds corrective work if a target fails. In Warwickshire, the county guidance suggests monitoring in years 1, 3, 5, 10, 20 and 30; agree the schedule for the particular site. Worcestershire fee framework · Warwickshire monitoring guidance.
Cannock Chase · visitor mitigation
East Staffordshire quotes £369.58 per dwelling for April 2026 to March 2027 for relevant development affecting the Cannock Chase Special Area of Conservation. The council refers to the 15 km zone of influence.
Ten qualifying dwellings at that rate give £3,695.80. This funds mitigation of recreation pressure. Prepare the biodiversity metric separately and check the appropriate route for the site. Check eligibility and the annual charge.
Government credits · last-resort cost
The government schedule lists tier A1 at £42,000 per credit. Where one residual unit falls wholly in that tier, the statutory spatial multiplier requires two credits, giving £84,000. The statutory metric calculates the applicable quantity.
This is a national credit calculation. To compare private offers, use the provider’s actual habitat, location, price and terms. Keep evidence of why the last-resort route is necessary. Check current statutory credit tiers · Understand units and credits · BNG costs guide.
Planning evidence
What to put in the application and the gain plan
Start by agreeing a baseline that the ecologist, architect and planning consultant can all trace back to a dated plan. A change to access, levels or drainage can change the metric even when the housing layout stays the same.
Baseline and validation
Submit the relevant BNG statement, dated pre-development metric and scaled habitat plan. Record survey dates, condition evidence, any earlier degradation and any irreplaceable habitat. If you claim an exemption, identify the test and supporting facts.
Use the correct district validation list. In Warwickshire the county’s progress chart links to the borough and district requirements. Find the relevant checklist · Scope a BNG assessment.
Design and off-site evidence
Keep retained, enhanced and created habitats identifiable on the drawing. Test deliverable target conditions and timing, including management access. Show area, hedgerow and watercourse balances separately.
Once you know the residual deficit, compare the proposed provider parcels. Check the spatial relationship, legal mechanism and allocation evidence before committing to a purchase. Use the statutory biodiversity metric · Follow the Cleeve Prior example.
Approval and long-term delivery
The gain plan should reconcile the approved drawings, final metric, allocations and legal security. A management plan should assign each action, monitoring date and corrective measure to a named responsible party.
Record funding, access rights and how the duty passes to successors. Keep a copy of the authority’s decision with the permission and the register reference. Habitat management and monitoring plans · Section 106 and conservation covenants.
Restoration evidence
What can monitored regional projects tell applicants?
Two West Midlands projects illustrate why a management plan needs a measurable outcome and a suitable way to test it. Each measures a different ecological process.
Diglis and the Severn · fish passage
Unlocking the Severn opened passage at Bevere in 2020 and Diglis in 2021. Natural England’s NECR503 study sampled environmental DNA at five Severn sites in 2022. It detected shad upstream of Lincomb Weir during the spawning run.
For a river proposal, define how barrier removal, flow and habitat condition will be assessed. A species detection helps establish access; demonstrating the target habitat condition requires its own evidence. Project monitoring record · Natural England eDNA study.
Luston · nutrient removal
Herefordshire’s constructed wetland takes treated water from the local treatment works. The council reports a 68% average reduction in total phosphorus concentration between inlet and outlet during independent monitoring from November 2023 to June 2024.
The council scheme supplies phosphate mitigation. A proposal in the Lugg catchment must still account for habitat losses and gains under the BNG framework. Keep each calculation, legal obligation and monitoring measure identifiable. Luston monitoring results · Herefordshire nutrient guidance.
ACP guidance
Plan the survey or continue to a neighbouring region
Choose the next guide to match your planning stage. For an enquiry, send the red-line drawing, local authority and any condition or validation request.
Application or condition?
For an application, start with the habitat baseline and design. If permission exists, read the conditions and identify what the authority needs before commencement.
BNG survey and assessment · Biodiversity Gain Plan · Discuss your project.
Provider or landowner?
For an off-site option, compare the metric, the draft agreement and the management plan before treating the proposal as secured. Establish which party will allocate the units.
Off-site unit guidance · Management and monitoring plans · ACP’s biodiversity net gain guide.
Near the regional boundary?
A site near Burton upon Trent may connect to habitats in Derbyshire. The planning boundary, the appropriate recovery map and the metric’s spatial rules each need a separate check.
East Midlands guide · England planning framework · BNG locations directory.
Regional questions
West Midlands BNG questions
For advice on a particular parcel or planning condition, send the site details.
Which nature recovery strategy covers Coventry or Solihull?
Both fall within the seven-council West Midlands metropolitan strategy led by WMCA. The Warwickshire strategy covers the five administrative county districts. For a scheme crossing the boundary, identify the appropriate strategy and measure for each parcel.
Can a Wychavon scheme use units from Warwickshire?
Yes, if the habitat, trading rules, spatial calculation and legal arrangements work. Natural England records an allocation of 3.03 area units from Avon Meadows for a Wychavon permission at Cleeve Prior. Another scheme must establish its own requirements and allocation.
Can I use the Staffordshire draft to score strategic significance?
Check the statutory metric guidance and agree the relevant local strategy with the determining authority. Record whether the mapped evidence is draft or published, which measure applies and how it fits the proposed habitat. Check again when finalising the metric.
Does a Cannock Chase contribution discharge the BNG condition?
The contribution addresses recreational pressure on the designated site. A qualifying development still needs to meet its statutory biodiversity gain objective and obtain gain-plan approval. The same separation applies to nutrient mitigation in an affected river catchment.
What should I ask a habitat bank before buying?
Ask for the gain-site reference, location, habitat type, target condition, available units, management security and current quote. Check the development-side spatial calculation. Ask when the provider will record the allocation against your planning reference and what the agreement requires if delivery changes.
What information helps a West Midlands BNG consultant scope a survey?
Send the red-line plan, location, application stage, earlier habitat information and any site clearance history. Mark proposed access, drainage, utilities and construction space. Include known survey constraints and deadlines so the ecologist can identify seasonal requirements.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Field guide / source notes
Regional evidence
Reviewed by ACP Consultants