Regional field guide · North East England
Biodiversity Net Gain in North East England
Find your planning authority, choose the right nature recovery map and trace a phased development’s habitat units from permission to allocation.
Planning for biodiversity net gain in North East England can mean retaining limestone grassland near Sunderland or finding space for a beck to flood on Teesside. At Cambois, the council’s decisions show how a former power station site accounted for both land and watercourse habitats.
Regional atlas
Who decides the application?
Select one of the four Local Nature Recovery Strategy (LNRS) areas, or use the text index. The directory identifies all twelve councils, the two national park exceptions and the Tees Valley development corporations.
Simplified Natural England LNRS boundaries. Contains OS data © Crown copyright and database right 2024. Boundary data · Open Government Licence v3.0.
County Durham
Durham, Bishop Auckland, Seaham, Consett, Barnard Castle and Chester-le-Street
The county council is the unitary authority. For a Darlington or Hartlepool address, use the Tees Valley entry instead. The ceremonial county spans several planning areas.
Published LNRS · Publication confirmed by Defra, May 2026
Durham County Council
From upper Weardale to the coast, check peat hydrology, former colliery grassland and the Magnesian Limestone network. On a limestone site, establish the existing grassland condition before agreeing to plant trees.
Planning council directory (1)
County Durham.
North of Tyne
Newcastle upon Tyne, North Shields, Ashington, Blyth, Alnwick, Hexham and Berwick-upon-Tweed
Northumberland, Newcastle and North Tyneside share a strategy. First locate the site in its council or national park planning area. Then use the local plan for that authority.
Published LNRS · March 2026
North East Combined Authority
Compare the upland headwaters and woodland connections with the very different opportunities along the lower Tyne and Blyth. On former industrial land, check mosaics of bare ground, ponds and early successional vegetation.
Planning council directory (3)
Newcastle upon Tyne · North Tyneside · Northumberland.
South of Tyne and Wear
Gateshead, South Shields, Jarrow, Hebburn, Sunderland and Washington
Each of the three metropolitan councils uses its own development plan. Gateshead leads the recovery strategy. At the Sunderland and South Tyneside boundary, also check the International Advanced Manufacturing Park policy area.
Published LNRS · Publication confirmed by Defra, October 2026
Gateshead Council
Track habitat links along the Don, Wear and Tyne and across the limestone plateau. For coastal development, map high-tide roosts, access routes and feeding areas alongside the site survey.
Planning council directory (3)
Gateshead · South Tyneside · Sunderland.
Tees Valley
Darlington, Hartlepool, Middlesbrough, Stockton-on-Tees, Yarm, Redcar and Saltburn
Five unitary councils share the draft strategy. Parts of Hartlepool, Middlesbrough and the North York Moors have special planning arrangements. Check the boundary before choosing an application portal.
Consultation draft · Consultation closed October 2026
Tees Valley Combined Authority
Around the estuary, check saltmarsh, intertidal flats, waterbird use and the nitrogen catchment. Upstream, look for floodplain reconnection, viable riparian buffers and links between meadows and hedgerows.
Planning council directory (5)
Darlington · Hartlepool · Middlesbrough · Redcar and Cleveland · Stockton-on-Tees.
Two national parks
Northumberland National Park Authority normally decides applications within its boundary. For a rural address near Hadrian’s Wall or the Cheviots, check the park map before selecting the county’s Local Plan. The park adopted its own plan in July 2020.
Farther south, the North York Moors National Park extends into Redcar and Cleveland. Parts of the borough therefore need park planning advice. The North Pennines National Landscape has a different status and crosses council boundaries.
Northumberland National Park planning policy · Tees Valley strategy area and park partners.
Development corporation areas
Hartlepool and Middlesbrough have development corporation planning areas within their boroughs. For a town-centre or waterfront scheme, use the corporation boundary and its submission guidance. The borough-wide recovery strategy still applies.
On the south bank of the Tees, Redcar and Cleveland retains local planning functions within the South Tees Development Corporation area. A Teesworks address alone does not determine the statutory consent route.
Check Hartlepool and Middlesbrough boundaries · South Tees planning arrangements.
England framework
Which national rules apply to a North East proposal?
Record the application date, type of consent and complete red-line area before commissioning a metric. For qualifying planning permissions, the statutory objective is at least 10% net gain against the pre-development biodiversity value.
Small sites and temporary works
For applications made from 6 August 2026, a site of 0.2 hectares or less can qualify for an exemption. A separate exemption covers wholly temporary development permitted for five years or less. Both have a priority-habitat test. A self-build description alone no longer exempts a new application.
Include access and compounds when measuring the red line. Then check habitat impacts and the transitional provisions, especially for a variation to an earlier permission. Defra exemption tests · BNG exemptions explained.
The gain hierarchy
First avoid or mitigate impacts on medium, high and very high distinctiveness habitats. For major development, next prioritise on-site enhancement, on-site creation and registered off-site gains in that order where possible. For qualifying non-major applications made from 6 August 2026, those three options have equal preference.
Statutory credits remain the last resort. Explain the alternative layouts and delivery options considered, especially where local policy also sets geographical preferences. National planning practice guidance.
Local permission or DCO
Normally, the planning authority must approve the Biodiversity Gain Plan before works start. Significant on-site enhancements and registered off-site gains require at least 30 years of management. Phasing also affects which plans must be approved before each start.
Nationally significant infrastructure applications submitted from 2 November 2026 follow the development consent route and applicable gain statement. For a new data centre, check which regime applies before using Cambois as a precedent. National infrastructure rules · Data centre gain statement.
Development plans
Where local policy changes the design
North East England spans two mayoral areas. Seven councils form the North East Combined Authority area and five form Tees Valley. They share some evidence and mapping, while individual authorities retain distinct planning functions. Start with the adopted development plan for the red line.
Northumberland · ENV 1 and ENV 2
The county adopted its Local Plan on 31 March 2022. ENV 1 provides the environmental assessment framework. ENV 2 covers biodiversity and geodiversity. A former colliery, rail siding or ash deposit can support species-rich open mosaic habitat, even where the mapping records industrial land.
At application stage, compare the survey with the layout and the authority’s validation notes. Note 6 concerns BNG, Note 14 the gain strategy and Note 19 ecological surveys. Inside Northumberland National Park, consult its own DM10 policy. County Local Plan · Application requirements · Park Local Plan.
Newcastle and Gateshead · the cross-Tyne network
The joint Core Strategy and Urban Core Plan addresses green infrastructure under CS18. Newcastle’s Development and Allocations Plan adds its own detailed policies. For a quayside project, consider the full bank corridor, access, shade, lighting and links to open space on adjoining land.
Newcastle gave notice of a replacement joint plan on 30 June 2026, with a revised timetable effective 30 October. Keep the emerging plan separate from the adopted documents. The shared Tyneside validation checklist also covers North Tyneside and South Tyneside. Adopted plans · NewcastleGateshead timetable · Four-authority checklist.
County Durham · Policy 41 and the biodiversity SPD
Policy 41 in the October 2020 County Durham Plan covers biodiversity and geodiversity. The council adopted its biodiversity supplementary planning document on 4 April 2025. It sets out how to identify and respond to ecological constraints when designing and documenting development.
For a Durham coast or former coalfield site, mark designated sites, grassland condition, woodland and corridors before siting access and drainage. Then explain how retained and proposed habitats can connect to the surrounding network. Adopted County Durham Plan · Biodiversity SPD and adoption record.
South Tyneside · Policies 33 to 36
The Local Plan adopted in July 2026 separates ecological networks (33), designated sites (34), measurable gain (35), and trees, woodland and hedgerows (36). For a scheme near Jarrow or Hebburn, one habitat drawing can show where these tests overlap. Each policy still needs its own response.
Policy 35 asks for evidence of reasonable efforts to secure a preferable off-site location. Check its sequence before reserving units across the Tyne. A geographically close offer may sit outside a preferred network. Read adopted Policies 33–36 · Follow the off-site sequence.
Darlington · ENV4, ENV7 and ENV8
Darlington’s February 2022 Local Plan identifies green and blue infrastructure under ENV4. ENV7 covers biodiversity, geodiversity and designated sites. ENV8 addresses the assessment of development impacts. The council asks applicants to illustrate how alternative layouts change biodiversity outcomes.
For a river corridor or urban extension, show the baseline and options at matching scale. Identify which trees, lengths of hedge and riparian margins each option retains. National exemptions and local biodiversity policy need separate checks. Darlington adopted plan · Council guidance for applicants.
Nature recovery evidence
How to read the priorities and habitat maps
Three of the four strategies have published final documents. The Tees Valley consultation closed in October 2026. Its responsible authority anticipates publication in December, subject to cabinet approval. Use the current status when completing a statutory metric.
Locate the feature
The North of Tyne strategy covers Northumberland, Newcastle and North Tyneside. Its map can reveal a corridor that continues into the neighbouring authority. Meanwhile, County Durham has a single unitary council and its own statement of priorities and local habitat map.
Save the map layer, date and scale used. Then identify the feature or measure relevant to the parcel. A broad opportunity area can contain buildings, incompatible land uses and habitats already in good condition. North of Tyne strategy · County Durham documents.
Test the intervention
South of Tyne and Wear brings together Gateshead, Sunderland and South Tyneside. Compare the mapped measure with the habitat proposed. For example, connecting two limestone grassland patches may require scrub management, while tree planting could frustrate the same objective. Use our Tyne and Wear guide for the five boroughs and their local planning context.
In the statutory biodiversity metric, justify strategic significance for each affected parcel. Keep that justification separate from the spatial-risk calculation, which concerns the relationship between the impact and the off-site location. South of Tyne and Wear priorities · Metric guidance.
Use the right strategy version
The Tees Valley draft brings together the five boroughs and the North York Moors National Park. It can help a project team test early design choices. Before using an emerging measure to assign a score, establish what evidence the metric guidance and planning ecologist accept at the assessment date.
Check the responsible authority again before submitting the gain plan. Keep a dated extract and the reason for selecting the habitat, especially near the Teesmouth wetlands. Consultation documents and draft map · National publication record.
Finding off-site land
South Tyneside’s search sequence
Policy 35 gives applicants a location sequence for off-site delivery. It matters when, for example, a South Shields developer has an offer in County Durham but has yet to check land in the borough’s recovery network.
Start with the borough
Look first within the strategic nature recovery network in South Tyneside. Next consider other land in South Tyneside. Record the habitat type, condition target, legal security and species or network benefit offered at each site.
Keep dated enquiries and responses, including why a parcel could not meet the habitat trading rules. A price quotation alone will rarely explain why a higher-priority location could not work. Policy 35 location sequence.
Widen the search in order
The policy then points to the wider South of Tyne and Wear strategy area, followed by Gateshead or Sunderland outside the strategic network. After that, consider a neighbouring recovery area, preferably in its strategic network, then a neighbouring National Character Area.
Explain any departure with ecological evidence. Test the applicable national hierarchy and metric spatial factor separately. For example, membership of the same recovery strategy is only one part of a unit-purchase decision. Local Plan requirements · National hierarchy.
Worked planning example
How Cambois accounted for area and ditch losses
At the former power station at Cambois, enabling works for a data centre affected open mosaic habitat, ponds and ditches. The signed condition decision, Phase A gain plan and public register let an applicant trace exactly what the first phase counted.
| Reserved matters | Area units | Watercourse units |
|---|---|---|
| Phase A · 25/01725/REM | 170.80 | 1.44 |
| Phase B · 26/01760/REM | 113.88 | 1.63 |
| Phase C · 26/01894/REM | 51.61 | 7.99 |
Follow the permission
Northumberland permitted the Phase A enabling works on 20 August 2025 under 25/01725/REM, pursuant to outline permission 24/04112/OUTES. Condition 3 required the final metric, the overall gain plan and a phase gain plan before commencement.
On 14 November 2025 the council accepted the submitted details and discharged the condition under 25/03382/DISCON. Use the planning reference for the phase as well as the separate discharge reference when searching the documents. Phase A permission · Condition 3 decision.
Reconcile the habitat types
Section 9.2 of the Phase A gain plan lists 105.32 grassland, 42.58 scrub and 22.89 pond units. Those rounded figures total 170.79 area units. The register displays 170.80. It also lists 1.44 watercourse units separately for ditches.
The plan records why the project used metric Rule 4 for high-distinctiveness ponds and open mosaic habitat in these exceptional circumstances. A different brownfield proposal needs its own survey and justification. Open the approved gain plan and notice · Potland Burn allocation entries.
Keep phase and overall totals apart
The approved plan identifies 408.76 area units and 12.01 watercourse units as the overall off-site requirement at that stage. That is a different figure from the units allocated to Phase A. Retain a phase ledger so later applications can reconcile commitments.
The council permitted Phase B on 17 August 2026 and Phase C on 26 August. The register records those allocations under their own references. Read each column separately before assessing cumulative delivery. Phase B decision · Phase C decision.
Registered gain sites
Where can a developer look for North East units?
Start with the shortfall by unit type, then look for a location that meets local policy and metric trading rules. Natural England’s register records allocations. A provider or marketplace can confirm which matching parcels are still available and on what terms.
Potland Burn and Netherton Park · Northumberland
The Potland Burn register covers 274.67 hectares near Ashington. Alongside the Cambois entries, it records 7.62 area units for Portland Park Cinema, 24/04452/FUL. The listed parcels include a pond, grassland and scrub. Site area and allocated units measure different things.
Netherton Park covers 11.14 hectares. Its register records 4.76 area units for Castle Leazes in Newcastle, 2024/0999/01/EIA, using meadow and other neutral grassland. Keep the allocation for the main scheme distinct from the separate footpath reference. Potland Burn · Netherton Park · Council bank directory.
Fir Tree Farm · County Durham
The register covers 8.72 hectares in the Durham Coalfield Pennine Fringe. Entries include 5.84 area units for Fieldon Bridge Phase 2, DM/25/00153/FPA, using 1.3258 hectares of other neutral grassland targeting good condition. A smaller allocation for Quarryheads Lane relates to mixed scrub.
Ask for the specific habitat parcel, condition and delivery timetable. Two offers with the same number of area units can meet different trading requirements. Fir Tree Farm allocations · Provider’s habitat-specific listings.
Heighington · Darlington
Heighington covers 19.86 hectares and its recorded enhancement start date is 9 December 2022. One register entry allocates 0.32 area units to a scheme on Blue House Point Road, Portrack Industrial Estate, Stockton, under 24/1368/FUL. It identifies grassland targeting good condition.
The same bank lists 20.81 area units for the Pennywell scheme in Sunderland, 25/00057/FUL. Check the spatial factor for the new permission before reserving units. A previous cross-boundary allocation establishes a precedent for enquiry only. Heighington register · North East marketplace.
Budgets and long-term responsibility
What do the published North East figures cover?
Separate the supplier’s unit price, the authority’s agreement and monitoring costs, and the cost of delivering habitat over time. A nutrient credit for housing in the Tees catchment belongs in a separate budget line.
An advertised unit price · Fir Tree Farm
On 5 November 2026, BioMark’s listing on Gaia showed £19,500 per unit for other neutral grassland, £22,500 for mixed scrub and £25,000 for a rural tree. These are provider figures for named habitat types at one bank.
Request a current written offer covering VAT, quantity, availability, spatial adjustment, legal costs and allocation. For example, two grassland units at the listed rate would cost £39,000 before any other applicable items. They cannot fill a watercourse deficit. Fir Tree listing by habitat · Check the registered site.
Council monitoring · a Seaham example
The March 2025 officer report for 33 affordable homes at Malvern Crescent, Seaham, DM/24/03202/FPA, recommended £2,485 for checking reports under the Habitat Management and Monitoring Plan. The same recommendation identified £21,846 for visitor mitigation. The two amounts served different obligations.
Use the example to establish what to ask for, then obtain a current case-specific figure. Separately allow for ecological surveys, management visits, remedial works and legal review. Northumberland’s section 106 protocol explains its approach to proportionate monitoring. Seaham committee report · Northumberland obligations protocol.
Nitrogen, biodiversity units and statutory credits
Natural England’s Tees guidance lists £2,700 for a credit covering one kilogram of nitrogen. The nutrient budget calculator determines the relevant quantity for an eligible housing project. This addresses nutrient pollution affecting protected habitats at Teesmouth.
For BNG, assess the habitat shortfall in the statutory metric. Government biodiversity credits follow their own national tier prices and are available as a last resort. Check the current route before allowing for either purchase. Tees nutrient rules and price · Statutory biodiversity credit prices · BNG costs explained.
Regional habitats and evidence
What can the survey change?
Use regional evidence to ask better site questions. The presence of a priority habitat elsewhere on the coast or coalfield cannot establish the condition of an individual parcel.
Brownfield land and limestone
On the lower Blyth and Tyne, former industrial sites can retain pools, bare substrates and pioneer vegetation. Along the Magnesian Limestone belt, grasslands can be small and fragmented. An aerial photograph alone will rarely reveal their full interest.
Survey before clearance. Compare the retained mosaic, the installation footprint and the planting target. If the proposal could affect irreplaceable habitat, establish the bespoke treatment required. Cambois evidence · Irreplaceable habitats guidance.
River Breamish · give the channel room
At Old Bewick near Wooler, the Environment Agency reports 1.5 km of restored, remeandering gravel river and 20 hectares of reconnected floodplain. The project involved the Tweed Forum, Harehope Estate, Natural England and Newcastle University.
For a Northumberland crossing or riverside scheme, test floodplain access, bank reinforcement and sediment movement before drawing the new channel. The project report gives measurable outcomes to compare with a proposed design. River Breamish case study · River Condition Assessment.
Greatham Marsh and Killhope Head
In August 2026 the Environment Agency reported removing a tidal barrier and restoring the course of Greatham Beck. The works enable 21.3 hectares of saltmarsh, mudflat and high-tide roost habitat to develop. At inland Killhope Head, the North Pennines partnership reports restoring 80 hectares of bare, eroding peat.
For wetland and peat targets, first establish how water enters, moves across and leaves the site. Identify who controls drains and embankments. Both projects document restoration undertaken for specific purposes. Neither figure is an offer of BNG units. Greatham restoration · Killhope Head peat work.
Planning submissions
What to send the ecologist and the council
A usable brief gives the red line, current layout, planning reference and intended start date. Mark any earlier clearance and areas outside the red line that might be available for habitat delivery.
Application, discharge and management
Use dated survey plans, condition sheets and the statutory workbook to explain the baseline and design response. Keep area, hedgerow and watercourse units in separate accounts. Next confirm the permission, registered allocations and any planning agreement before finalising the gain plan.
Name the party responsible for each significant enhancement, the target condition, monitoring dates and triggers for corrective work. BNG assessment and baseline survey · Biodiversity Gain Plan · Habitat Management and Monitoring Plan.
Projects near the regional boundary
For Tees-side sites near North Yorkshire, check the red line on both the authority and recovery maps. For Pennine or border catchments, trace the habitat connection across the county line. A postal address is only a starting point.
Use the neighbouring guides when the impact site or a proposed off-site parcel crosses the regional boundary. Yorkshire and the Humber · North West England · BNG in England · ACP location directory.
Get project-specific advice
Share the latest drawings and local authority correspondence. If an off-site offer already exists, include its habitat, price basis, register number and expiry. This lets the ecologist check the match before the project commits to a purchase.
For the overall process, use the BNG planning steps. For the scope of a site assessment, speak to our BNG consultants or send your project details.
Regional questions
North East BNG questions
For advice on a particular site, share the location and planning reference.
Is Darlington part of the County Durham recovery strategy?
Darlington has its own unitary planning authority and shares the Tees Valley strategy with Hartlepool, Middlesbrough, Redcar and Cleveland, and Stockton-on-Tees. Durham County Council’s strategy covers its own administrative area.
Does South Tyneside accept off-site units elsewhere?
Policy 35 sets a location sequence. Check the strategic network in the borough first and document why earlier locations cannot deliver an appropriate outcome. Then test the proposed bank against the national trading rules and spatial factor.
Which Cambois figures apply to a particular phase?
Use the phase permission reference to locate the corresponding public allocation. Phase A records 170.80 area units and 1.44 watercourse units. The approved gain plan also deals with future phases and the overall campus objective.
Who handles an application inside a development corporation boundary?
Check the corporation’s current boundary and the guidance for the application type. Hartlepool and Middlesbrough have corporation planning areas. At South Tees, Redcar and Cleveland retains ordinary local planning functions.
Can a Tees nitrogen credit satisfy a biodiversity unit shortfall?
The nitrogen scheme accounts for nutrient loading in the protected catchment. The biodiversity metric assesses changes to habitat value. Where both obligations apply, calculate, secure and document each through its own route.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Field guide / source notes
Regional evidence
Reviewed by ACP Consultants