Regional field guide · North West England
Biodiversity Net Gain in North West England
Find the right planning authority, work out which habitats matter and trace a real gain plan through to its off-site allocation.
Biodiversity net gain in North West England brings different challenges on a Bolton industrial estate, a Cheshire dairy farm or a Cumbrian riverbank. Start with the red line, the local plan and the water that feeds the site. Those checks can change the design long before you need a unit price.
Regional atlas
Which council and recovery map cover your site?
Select a map area or use the alphabetical index. The five Local Nature Recovery Strategy (LNRS) areas cover 35 district, borough, city and unitary councils. National park boundaries need a separate check.
Simplified Natural England Local Nature Recovery Strategy boundaries. Contains OS data © Crown copyright and database right 2024. Boundary dataset · Open Government Licence v3.0.
Cheshire and Warrington
Chester, Crewe, Macclesfield, Northwich and Warrington
Three unitary councils share this recovery strategy. Halton follows the Liverpool City Region strategy. In eastern Cheshire, test the red line against the Peak District National Park boundary. Our Cheshire BNG guide compares council policies, local application evidence and the two nature recovery maps.
Published LNRS · November 2025
Cheshire West and Chester Council
The Cheshire Plain’s ponds, meres and mosses, the Dee and Weaver floodplains and the sandstone ridge offer different connections. Retaining a pond works best when the design also protects its water supply and terrestrial habitat.
Planning council directory (3)
Cheshire East · Cheshire West and Chester · Warrington.
Cumbria
Carlisle, Barrow-in-Furness, Kendal, Penrith, Whitehaven and Workington
Cumberland and Westmorland and Furness replaced the former county and six districts in April 2023. The Lake District and Yorkshire Dales national park authorities decide most planning applications inside their boundaries.
Published LNRS · 7 November 2025
Westmorland and Furness Council
From upland headwaters to the Solway coast, water levels and sediment movement influence habitat condition. Use the habitat and opportunity map together with the parcel survey and any protected catchment assessment.
Planning council directory (2)
Cumberland · Westmorland and Furness.
Greater Manchester
Manchester, Salford, Bolton, Stockport, Wigan and Rochdale
All ten metropolitan boroughs use the recovery strategy. Nine participate in Places for Everyone; Stockport follows its own plan route. Check the national park boundary on the eastern fringe. Our Greater Manchester BNG guide compares council policies, local application evidence and Nature Network priorities.
Published LNRS · September 2025
Greater Manchester Combined Authority
The mosslands, Southern Pennine slopes, canals and former industrial land support different habitats. Test how drainage, remediation and lighting would affect retained parcels and links beyond the red line.
Planning council directory (10)
Bolton · Bury · Manchester · Oldham · Rochdale · Salford · Stockport · Tameside · Trafford · Wigan.
Lancashire
Preston, Lancaster, Blackburn, Blackpool, Burnley and Chorley
Blackburn with Darwen and Blackpool are unitary authorities. Twelve districts and boroughs cover the county council area. West Lancashire belongs here, despite sharing coastal issues with Merseyside.
Published LNRS · 16 January 2026
Lancashire County Council
Along the Fylde, Ribble estuary and Bowland uplands, similar-looking fields can have very different peat, water and species constraints. Near the Yorkshire Dales, also check which authority decides the application.
Planning council directory (14)
Blackburn with Darwen · Blackpool · Burnley · Chorley · Fylde · Hyndburn · Lancaster · Pendle · Preston · Ribble Valley · Rossendale · South Ribble · West Lancashire · Wyre.
Strategy and priorities · Open the habitat map
Lancashire BNG guide — local council policies, the LNRS map and planning evidence.
Liverpool City Region
Liverpool, Birkenhead, Southport, St Helens, Runcorn and Widnes
The five Merseyside boroughs and Halton share a recovery map. Each decides ordinary applications under its own development plan. A Liverpool or Warrington postal address alone can point to the wrong council.
Published LNRS · March 2026
Liverpool City Region Combined Authority
Map the links between the Mersey estuary, the Sefton Coast, inland wetlands and urban corridors. Separate disturbance of protected birds and coastal habitats from changes to the area-unit balance.
Planning council directory (6)
Halton · Knowsley · Liverpool · Sefton · St Helens · Wirral.
Inside a national park?
Parts of the North West fall within the Lake District, Yorkshire Dales and Peak District national parks. First locate the red line on the park boundary. A national park authority can determine the application even though the county-wide recovery strategy still covers the land.
In particular, the Yorkshire Dales overlaps Westmorland and Furness and a small part of Lancaster. The Peak District reaches into eastern Cheshire and Greater Manchester. A National Landscape designation alone does not transfer planning powers.
Lake District planning policy · Yorkshire Dales boundary statement · Peak District planning authority.
Planning geography
One address can point to several planning documents
Map the full works boundary, including access, drainage and compounds. Identify the deciding authority, the adopted policy area and the recovery strategy separately. These boundaries often differ.
Manchester and Liverpool city regions
Combined authorities lead their nature recovery strategies. Individual boroughs determine ordinary applications. Halton therefore uses the Liverpool City Region strategy, while a neighbouring Warrington site uses the Cheshire and Warrington strategy.
In Greater Manchester, check whether the borough participates in Places for Everyone. In Liverpool City Region, use the correct borough plan and validation list. Check the nine participating districts · Find the council.
Cumbria’s former districts
Cumberland inherited the former Allerdale, Carlisle and Copeland planning documents. Westmorland and Furness covers former Barrow, Eden and South Lakeland. Legacy policies can still apply to the particular area while replacement plans are prepared.
For a site near Kendal, distinguish a former South Lakeland policy from a Lake District National Park policy. Keep the map extract used to make that distinction. Cumberland’s current plans · Westmorland and Furness framework.
Lancashire reorganisation
Lancashire County Council reported on 29 October 2026 that the July decision to replace the councils with four unitary authorities was under review. The revised review timetable runs into early 2027.
Use the current borough or district for an ordinary application, and the county for relevant minerals, waste or county development. Blackburn with Darwen and Blackpool have their own unitary functions. Read the October council update · North West regional geography.
Development plans
North West planning policies that affect a BNG design
Two proposals can meet the same statutory percentage but need different ecological evidence. Compare the adopted policy with the red-line habitats, then show the design response on a drawing.
Greater Manchester · Places for Everyone JP-G8
The joint plan took effect on 21 March 2024 in nine boroughs. JP-G8 addresses habitat quality, connections and management, designated sites and valuable soils, including peat. The ecological network can extend well beyond a site allocated for redevelopment.
For a site near Chat Moss or alongside a canal, examine water levels, barriers and connections before setting a target condition. Stockport is outside the joint plan. It published its own Regulation 19 documents in September 2026. Read adopted JP-G8 · Stockport’s emerging plan.
Liverpool · GI6, GI7 and local validation
GI6 in Liverpool’s adopted city plan addresses biodiversity and geodiversity; GI7 concerns the Liverpool City Region Nature Improvement Area. A river-edge or former dock site may also connect to bird feeding areas or roosts outside the red line.
Liverpool asks for an ecology checklist and a draft gain plan. Cross-reference baseline and proposed habitat plans to the metric, with condition evidence for each applicable parcel. Confirm the current national exemption rules separately. Adopted Liverpool plan and maps · Liverpool’s application requirements.
Cheshire East · SE 3, ENV 1 and ENV 2
Cheshire East’s July 2024 Ecology and BNG SPD explains how the Local Plan Strategy and Site Allocations and Development Policies Document work together. ENV 1 addresses the ecological network; ENV 2 sets out ecological implementation requirements.
On a Crewe or Macclesfield edge site, compare mapped core areas, corridors and stepping stones with field evidence. Mark retained hedgerows, ponds, buffers and access on one plan. Read the adopted ecology SPD.
Cheshire West and Warrington · different policies
Cheshire West and Chester uses ENV4 and DM44, with guidance on ecological networks and significant on-site enhancement. Warrington’s December 2023 plan uses DC3 for green infrastructure and DC4 for the ecological network.
The same LNRS covers Chester and Warrington. It helps identify recovery opportunities, while the relevant Local Plan and local guidance establish the policy tests. Cheshire West BNG requirements · Warrington DC3 and DC4.
Central Lancashire · Policy 22 and the replacement plan
Adopted Core Strategy Policy 22 promotes conservation, enhancement and expansion of ecological networks in Preston, Chorley and South Ribble. Check the relevant district plan and allocations too.
The examination update of 26 October 2026 says a second post-hearing letter was being finalised. Treat the replacement Central Lancashire Local Plan as emerging until formal adoption. Read adopted Policy 22 · Check the examination stage.
Cumbria · local policy or park policy?
In the former South Lakeland area, DM4 addresses green and blue infrastructure and biodiversity. Inside the Lake District National Park, Policy 04 applies a mitigation hierarchy and seeks better-connected habitats and functioning ecosystems.
For a lakeshore project, test drainage and access against protected waters and habitat connections. Identify which plans the authority uses before agreeing the metric scope. Westmorland and Furness policy evidence · Lake District Policy 04.
From permission to allocation
How Bolton checked the gain plan at Cutacre Way
The council file and Natural England’s register let an applicant follow three distinct steps: the permission, the gain-plan decision and the allocation. The site is at Cutacre Way in Bolton; its off-site units are recorded at Horwich.
Identify the permission
Bolton approved variation 21168/25 subject to conditions on 28 November 2025. It changed conditions on permission 19255/24 covering landscape, drainage, access, parking and environmental management. The later gain-condition application also names amendment 00385/26.
Keep the live permission reference with each drawing revision. In this case the register uses 21168/25, while the discharge application has its own reference, 00162/26. Permission and variation record.
Read the decision documents
The council summary records a decision issued on 27 April 2026. Its published notice is dated 2 June 2026. The notice identifies the gain plan, the revised habitat management plan and its appendices, the statutory metric, the drainage statement and a biodiversity unit purchase certificate.
The council said the condition could be discharged subject to carrying out and maintaining the works in accordance with those documents. For the detail, open the decision notice in the Documents tab. Discharge application 00162/26 · Decision notice and supporting evidence.
Reconcile the off-site entry
The Horwich register entry BGS-021024004 records 0.25 area units against 21168/25. It identifies 0.0506 hectares of other neutral grassland targeting good condition. Those numbers measure different things: one is a biodiversity value, the other a land area.
Check the same three identifiers on a new purchase: development reference, registered gain site and habitat parcel. Retain the final metric and the authority’s decision alongside the allocation. Horwich register: select Allocation.
National framework
Check the consent route before commissioning the metric
For qualifying planning permissions in England, the statutory objective is at least 10% biodiversity gain over the pre-development value. Application dates, habitat impacts and the consent regime determine the evidence needed.
Exemptions after 6 August 2026
For applications made from that date, the site-size exemption covers red-line areas of 0.2 hectares or less, subject to the priority-habitat test. Wholly temporary development permitted for five years or less has a separate exemption, also subject to that test. A new self-build or custom-build application no longer qualifies solely because of that description.
Measure the entire red line and check priority habitats, including features affected by access works. For an earlier or varied permission, check the transitional rules against its dates. Defra’s exemption tests · BNG exemptions guide.
Where off-site units fit
First avoid or mitigate adverse effects on medium, high and very high distinctiveness on-site habitats. For major development, then prioritise on-site enhancement, on-site creation and registered off-site gains, in that order where possible.
For qualifying non-major applications made from 6 August 2026, the three compensation options have equal preference. Statutory credits remain the last resort. Keep a record of the alternatives assessed. National planning practice guidance · Buying statutory credits.
Permission, commencement and management
A gain plan is normally approved after permission and before starting works. Significant on-site enhancements and registered off-site gains require at least 30 years of management. For a phased scheme, check overall and phase gain-plan requirements.
Nationally significant infrastructure applications submitted from 2 November 2026 follow the development consent route and relevant biodiversity gain statement. Establish the right route for a major port, rail or energy proposal. Planning and infrastructure routes · Gain-plan support.
Nature recovery
Use the local habitat map parcel by parcel
All five North West strategies are published. They identify priorities for nature recovery, but a mapped opportunity still needs a suitable habitat, the right physical conditions and a credible management agreement.
Locate the relevant measure
Start with the area directory. In Cheshire and Warrington, distinguish existing areas important for biodiversity from locations where a potential measure could connect them. In Greater Manchester, use the Nature Network maps with the published priorities.
Save the map date, legend, parcel boundary and supporting measure. For a cross-boundary scheme repeat this for each parcel. Cheshire and Warrington strategy · Greater Manchester strategy.
Justify strategic significance
A suitable river corridor may support wet woodland or floodplain grassland, for example. The same mapped location may offer little justification for a different proposed habitat. Use the statutory metric guide to score strategic significance for the baseline and intervention.
Explain the ecological link in the metric notes. Keep separate evidence for the spatial risk multiplier when the gain lies off site. Metric tools and user guide · Statutory metric help.
Think beyond the red line
Lancashire’s January 2026 strategy and Liverpool City Region’s March 2026 strategy meet near the coast. A bird population, a drainage network or recreational pressure can cross their boundary.
Check both the mapped opportunity and effects on the designated site, including land used by protected birds outside its boundary. The Sefton coastal approach illustrates the separate recreation assessment. Lancashire recovery strategy · Sefton coastal mitigation.
Regional ecology
Which habitats could change the layout?
Use local records and landscape evidence to design the survey. Then test the actual parcels in the field. Similar-looking sites can have different soils, water regimes and restoration potential.
Mosslands and peat
A field beside a raised bog can drain it through a shared ditch. In Greater Manchester and Lancashire, review peat depth, water levels and land drainage before locating access or designing infiltration. A wetland planting list cannot compensate for an unsuitable water regime.
Where the statutory definition of an irreplaceable habitat applies, follow its separate treatment. Identify avoidance and compensation requirements early. Irreplaceable habitat rules · Winmarleigh water management example.
Urban waterways and former industrial land
The Mersey, Irwell, Ship Canal and urban tributaries connect otherwise fragmented sites. Former industrial land may contain open mosaic habitat, while canal walls and railway embankments can provide refuges or movement routes.
Record the individual habitats before clearance. For a development at Salford Quays or along the Mersey, consider lighting, bank access and drainage alongside the landscaping. Habitat condition assessment · River condition assessment.
Lowland ponds, hedges and farmland
In the Cheshire Plain and western Lancashire, individual ponds and hedgerows can form a wider network through farmland. A road crossing may sever that link even where the total planted area increases.
Check hedgerow condition, pond hydroperiod and terrestrial links. Calculate the area, hedgerow and watercourse modules separately. A surplus in one module cannot cancel a shortfall in another. Cheshire East ecological network guidance.
Uplands, coast and designated waters
In Cumbria, a headwater diversion can affect a downstream protected river. Along the Ribble and Morecambe Bay, changes in access and disturbance can matter as much as direct habitat loss. Dunes and saltmarsh also need space for natural processes.
Keep statutory BNG, protected-sites assessment and nutrient mitigation as separate workstreams. For an affected development, the Cumbria credit scheme concerns phosphorus in specific catchments; one nutrient credit represents 1 kg per year. Check the four Cumbria catchments · Estuary and coastal evidence.
Off-site delivery
Where can a North West developer find off-site units?
The public register identifies sites and recorded allocations. The provider confirms which habitats remain available, what they cost and when they can be allocated. Check the relevant site entry before comparing quotes.
Horwich · Greater Manchester
Environment Bank describes a site between Horwich and Bolton in the Southern Pennines National Character Area. The operator lists two register references. BGS-021024004 covers 33.23 hectares; it is the entry that records the Cutacre Way allocation.
Check which entry and parcel an offer uses. The operator describes acid grassland, neutral grassland, scrub, ponds and ditches. A total advertised across the wider bank cannot establish availability for a particular habitat. Horwich provider profile · Register and allocations.
Townley Farm, Marbury · Cheshire East
The family farm lies in the Shropshire, Cheshire and Staffordshire Plain National Character Area. Entry BGS-210825001 records 10.19 hectares. Its allocation tab includes the Gordale Garden Centre entry in Cheshire West and Chester under 24/02671/FUL.
Distinguish the host planning authority from the responsible body named on the register. For a purchase, match the site boundary, habitat and target condition, then test the spatial relationship to the development. Townley Farm information · Marbury register entry.
Cockermouth · Cumberland
The 29.94-hectare registered site is in the West Cumbria Coastal Plain. The operator describes plans for meadow, scrub, woodland, priority ponds and trees, with connections towards the Derwent and nearby habitats.
BGS-110326001 records 7.03 area units for land north of Ambleside wastewater treatment works, application 7/2025/5541. The allocation includes neutral grassland and mixed woodland. The development falls under the Lake District National Park Authority. Cockermouth allocations · Provider and location.
For area and hedgerow units, check local planning authority and National Character Area relationships. Watercourses use catchment relationships. The metric calculates location risk from those inputs; distance on a road map is insufficient. Off-site unit guidance · How to use the statutory register.
Cost and procurement
What does a North West BNG budget need to cover?
Price the relevant habitat and the work needed to secure it. The survey, unit purchase, legal agreement, monitoring and any unrelated mitigation each have a separate basis.
An indicative northern market benchmark
Biodiversity Units UK’s July 2026 report lists £23,901 for other neutral grassland and £33,730 for lowland meadow in its England (North) in-LPA/NCA table. These are the publisher’s market figures for the wider North. They are not quotes from Horwich, Townley Farm or Cockermouth.
Request a dated offer specifying habitat, condition, unit quantity, spatial adjustment, VAT, legal costs and allocation deadline. A cheaper headline price can require more units once the spatial calculation is applied. Read the dated market table · How providers price units.
Chorley · staged fees and monitoring
Chorley’s 2026/27 schedule lists Stage 1 at £2,288.80 and Stage 2 at £3,524.75. Its separate Stage 3 Section 106 monitoring table depends on area and technical difficulty. For 0–10 hectares it lists £3,842.50 at low difficulty, £5,855.25 at medium and £8,980.20 at high.
Confirm with Chorley which stages apply to the proposal and how it treats VAT. These figures are charges under its own BNG schedule, not private unit prices or a tariff for the rest of Lancashire. Council fee schedule, page 13.
Stockport · agreement and legal costs
Stockport says section 106 agreements covering significant on-site enhancements include fees for officers to assess monitoring. The council asks applicants to contact its ecology team for an estimate; the applicant also meets legal costs and disbursements.
A 30-year management allowance should cover establishment, replacement planting, surveys, reporting and corrective work. Ask who will fund and carry out each task if the land changes hands. Stockport’s monitoring guidance · Habitat management and monitoring plans.
Government credits and nutrient credits
The statutory biodiversity credit schedule prices tier A1 at £42,000 per credit. One whole residual A1 unit requires two credits after the statutory multiplier: £84,000. Only use that route where the hierarchy and evidence support it.
In Cumbria, the separate nutrient scheme covers the Eden, Derwent and Bassenthwaite Lake, Kent and Esthwaite Water catchments. Phosphorus mitigation cannot be entered as biodiversity units. Statutory biodiversity credit prices · Cumbria nutrient credit scheme · BNG cost guide.
Planning evidence
From the survey to the start on site
Keep a common parcel numbering system across the baseline survey, metric, landscape plan and management plan. It helps the council spot a changed access route or drainage basin before the documents reach the discharge stage.
Application stage
Record the survey date, site condition, any earlier habitat clearance, irreplaceable habitats and exemption evidence. Liverpool’s validation guidance asks for the full metric spreadsheet, a draft gain plan, condition assessments, and baseline and proposed plans keyed to the metric.
Identify which of these local requests applies at the receiving council. Newer national exemptions and the rules for non-major development must be checked against the application date. Liverpool checklist and templates · Planning validation guide.
Before committing to a supply agreement
Check the provider’s register reference, habitat parcel, target condition, secured management and available units. Re-run the development calculation if the location or habitat changes. Set out payment and allocation milestones in writing.
At Horwich, the register entry, unit certificate and metric support different checks. Use a similar audit trail when a development crosses an authority or NCA boundary. Follow the Bolton example · Units and statutory credits.
Discharge and long-term delivery
Submit the final metric, gain plan, drawings and registered allocations needed for approval. Agree monitoring dates, access, reporting and corrective triggers. Significant on-site or off-site habitat must have an enforceable delivery mechanism.
Keep the written approval with the permission reference and management documents. The signed Bolton notice shows why the approved versions and the continuing maintenance requirements both matter. Gain-plan preparation · Section 106 and conservation covenants.
Evidence in practice
Two Lancashire projects show what to measure
The success of a habitat proposal can depend on water moving across a farm boundary or through a sea defence. These projects give practical lessons for monitoring; neither example is presented as a purchasable unit allocation.
Winmarleigh · hydrology at the edge of a moss
Lancashire Wildlife Trust describes how a drainage ditch beside Winmarleigh Moss was drawing water away from the protected peat. Blocking the ditch and raising water levels on adjacent land helped address that pressure.
An April 2026 study compared greenhouse-gas exchange at the rewetted pilot and a neighbouring drained pasture. The pilot emitted less over the study period. For a BNG proposal, monitor water levels and vegetation condition as well as any carbon outcome. Trust project record · Read the monitoring study.
Hesketh Out Marsh · allow room for tidal processes
The RSPB records restoration on the Ribble estuary in two phases, the first in 2007 and the second completed in autumn 2017. The Environment Agency identifies 322 hectares of priority saltmarsh at the managed realignment site.
For a coastal scheme, test levels, tidal exchange, sediment supply and constraints from flood defences before committing to a habitat target. Include the relevant physical measurements in the management plan. RSPB site history · Environment Agency evidence.
ACP guidance
Choose the next step for your site
A red-line drawing, site location, planning authority and any council correspondence are enough to start scoping the work. Existing surveys, clearing dates and drainage drawings help refine it.
Survey or feasibility
Check the habitats and seasonal constraints before settling the developable area. Mark watercourses, temporary access, compounds and any land outside the applicant’s control.
BNG baseline surveys and assessments · Habitat condition evidence · Discuss your site.
Metric or gain plan
For a permission already granted, start with its conditions and approved layout. Reconcile any off-site purchase with the final metric and the correct application reference.
Statutory metric advice · Biodiversity Gain Plans · ACP’s main BNG guide.
Across a regional border
For a Cheshire site near Shropshire, the neighbouring West Midlands guide covers the other side of the boundary. Check the local recovery measure, planning authority and spatial rules independently.
West Midlands regional guide · England planning framework · BNG locations directory.
Regional questions
North West BNG questions
For a site-specific policy or metric question, send the project details.
Does Places for Everyone cover Stockport?
No. The adopted joint plan applies to nine Greater Manchester boroughs. Stockport follows its own development plan but shares Greater Manchester’s nature recovery strategy. Its September 2026 Regulation 19 documents are emerging policy.
Which recovery strategy applies to Halton?
Halton, including Runcorn and Widnes, falls within Liverpool City Region’s strategy. Cheshire East, Cheshire West and Chester, and Warrington share the Cheshire and Warrington strategy. Check each parcel separately for a site near the boundary.
Who decides a BNG application in the Lake District?
Within the national park, the Lake District National Park Authority normally decides planning applications. Outside it, check Cumberland or Westmorland and Furness and the relevant legacy plan. Cumbria’s nature recovery strategy covers all of these areas.
Can off-site units from Cockermouth serve an Ambleside development?
The register contains an example. It records 7.03 area units against Lake District application 7/2025/5541 at the Cockermouth habitat bank. A new scheme needs its own habitat match, spatial calculation, legal arrangements and allocation.
Does a Cumbria phosphorus credit count towards biodiversity net gain?
A nutrient credit represents phosphorus mitigation within an eligible catchment. Biodiversity units measure changes in habitat value. A development may need both, with separate calculations, delivery evidence and approvals.
What should I obtain before buying North West biodiversity units?
Request a parcel-specific offer with the habitat type and condition, available units, price, expiry date, legal terms and register reference. Check the adjusted requirement in the development metric and agree when the provider will allocate the units to the permission.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Field guide / source notes
Regional evidence
Reviewed by ACP Consultants