Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Regional field guide · Yorkshire and the Humber

Biodiversity Net Gain in Yorkshire and the Humber

Find your planning authority, check the local habitat priorities and see how a Leeds permission secured grassland units at Filey.

Planning for biodiversity net gain in Yorkshire and the Humber starts with the site boundary. A riverside scheme in Leeds, a warehouse near Immingham and a housing site in York each need a different set of maps and planning evidence.

Regional atlas

Which council and habitat map cover your site?

Select an area or follow the text index. The directory covers 15 councils and five Local Nature Recovery Strategy (LNRS) areas. For sites inside a national park, also check the park authority.

Simplified Natural England LNRS boundaries. The Greater Lincolnshire area is clipped to the two regional councils using ONS boundaries. Contains OS data © Crown copyright and database right 2024. Natural England boundaries · ONS boundaries · Open Government Licence v3.0.

AREA 01

Hull and East Yorkshire

Hull, Beverley, Bridlington, Driffield, Goole and the Yorkshire Wolds

Two unitary councils decide ordinary planning applications here, Hull City Council and East Riding of Yorkshire Council. A site near Hull’s boundary can share a recovery priority with the neighbouring council while needing a different Local Plan and validation list.

Published LNRS · February 2026
East Riding of Yorkshire Council

Test chalk streams and grasslands in the Wolds, floodplain drains, Holderness wetlands and the estuary against survey evidence. For coastal housing or tourism, consider visitor effects on protected sites as well as direct losses.

Planning council directory (2)

East Riding of Yorkshire · Kingston upon Hull.

Strategy and priorities · Open the habitat map

AREA 02

North Lincolnshire and North East Lincolnshire

Scunthorpe, Brigg, Barton-upon-Humber, Grimsby, Immingham and Cleethorpes

These two south-bank councils are in Yorkshire and the Humber. They share the Greater Lincolnshire strategy with areas farther south. Only the two regional authorities are shown on this map.

Published LNRS · July 2026
Lincolnshire County Council

Humber mudflats, waterbird feeding land, lowland peat and chalk streams call for different evidence. Check whether a red line set back from the shore still affects land used by protected birds.

Planning council directory (2)

North Lincolnshire · North East Lincolnshire.

Strategy and priorities · Open the habitat map

AREA 03

North Yorkshire and York

York, Harrogate, Scarborough, Ripon, Selby, Skipton and Northallerton

York is its own planning authority. North Yorkshire Council replaced seven districts and the county council in April 2023. Inside the Yorkshire Dales and North York Moors, the national park authority normally handles the application.

Published LNRS · February 2026
North Yorkshire Council

Trace links from upland headwaters through the Vale of York to the Ouse and its tributaries. The mapped-measures layer identifies opportunities; read the proposed intervention against its measure before scoring it.

Planning council directory (2)

North Yorkshire · City of York.

Strategy and priorities · Open the habitat map

AREA 04

South Yorkshire

Sheffield, Rotherham, Doncaster and Barnsley

The four metropolitan councils handle ordinary applications under their own plans, subject to the Peak District boundary in the west. SYMCA leads the strategy. The board approved the publication draft in principle, subject to final supporting-authority review.

Publication draft · Board decision 27 October 2026
South Yorkshire Mayoral Combined Authority

The Don and Dearne valleys connect former industrial land, floodplain wetlands and urban greenspace. Near the Humberhead Levels, investigate water levels beyond the development boundary before choosing a wetland target.

Planning council directory (4)

Barnsley · Doncaster · Rotherham · Sheffield.

Publication draft and decision · Explore consultation mapping

AREA 05

West Yorkshire

Leeds, Bradford, Wakefield, Huddersfield, Halifax and Keighley

All five metropolitan councils share the strategy. The relevant district determines its own application. A Leeds site and a Wakefield site can sit within one river system yet face different policy and monitoring requirements.

Published LNRS · 26 March 2026
West Yorkshire Combined Authority

Use the published map to test networks across the Aire, Calder, Pennine moors and former coalfield. Check the connection between the site and the feature identified on the map, particularly where roads or culverts interrupt it.

Planning council directory (5)

Bradford · Calderdale · Kirklees · Leeds · Wakefield.

Strategy and priorities · Open the habitat map

Planning boundaries

Yorkshire Dales, North York Moors and Peak District

Check the park boundary before sending a survey brief or pre-application enquiry. North Yorkshire’s emerging plan excludes the two national parks within the county. In western Sheffield, a site can fall inside the Peak District National Park Authority’s planning area.

Identify the authority for the full proposal, including access and drainage. If works straddle a park boundary, contact both planning teams. The nature recovery map remains useful on either side.

North Yorkshire plan area · Yorkshire Dales boundary · Peak District planning authority.

Planning routes

Which BNG rules apply to the proposal?

For a qualifying planning permission in England, the statutory objective is at least 10% gain against the pre-development biodiversity value. First check the application date, red line and consent route.

Check the August 2026 exemptions

For new applications from 6 August 2026, a site of 0.2 hectares or less may qualify for the site-size exemption. Wholly temporary development permitted for five years or less has a separate exemption. Both include a priority-habitat test. Self-build alone no longer exempts a new application.

For a small plot in York, include the access and other works when measuring the site. Earlier permissions and variations can follow different transitional provisions. Check the statutory exemption tests · Which projects qualify for an exemption?.

Work through the gain hierarchy

Avoid or mitigate impacts on medium, high and very high distinctiveness habitats first. For major schemes, prioritise on-site enhancement, then on-site creation, then registered off-site gains where possible. For qualifying non-major applications from 6 August 2026, those three compensation options have equal preference.

Government statutory credits remain the last resort. In either case, record the alternatives examined and why the chosen habitats fit the site. National planning practice guidance.

Permission and commencement

The planning authority normally approves the Biodiversity Gain Plan before development starts. Secure significant on-site enhancements and registered off-site gains for at least 30 years. A phased permission can require both an overall plan and phase plans.

For nationally significant infrastructure, check the DCO application date. Applications submitted from 2 November 2026 follow the applicable biodiversity gain statement. This distinction matters for major Humber energy and port infrastructure. Check the national infrastructure route.

Development plans

Local policies that can change the site layout

Use the plan adopted by the deciding authority alongside national requirements. The following policies show how the evidence changes between a York heathland, a Leeds riverbank and a Humber port.

City of York · GI2 and GI2a

The council adopted its Local Plan on 27 February 2025. GI2 addresses biodiversity and access to nature. GI2a deals specifically with Strensall Common Special Area of Conservation. A housing proposal near the common needs to address the relevant access and recreation evidence as well as habitat change within its red line.

Check the council’s current adopted text and policies map. Record how the proposal responds to the protected site before assigning metric units to landscaping. York Local Plan and subsequent amendments.

Leeds and Wakefield · G9 and LP51–53

Leeds uses Core Strategy G9 alongside its developer guidance. For qualifying schemes, that guidance calls for checks where a watercourse lies within 10 metres of the planning boundary. It sets out separate arrangements for covered culverts and wet ditches. Confirm the survey method and ecologist’s accreditation before site work.

Wakefield’s LP51 covers ecological and geological conservation, LP52 covers watercourses and LP53 covers habitat networks. Its BNG supplementary planning document dates from 15 October 2024. For a Calder-side scheme, show how the bank, buffer and neighbouring habitat will connect after development. Leeds developer guidance · Wakefield policies and SPD.

Barnsley and Sheffield · habitat networks and emerging policy

Barnsley’s adopted plan includes BIO1 on biodiversity and geodiversity and GI1 on green infrastructure. On a former industrial or railway site, survey grassland and scrub before assuming that previously developed land has little ecological value. Then test access and lighting against the retained corridor.

Sheffield’s consultation on further main modifications closed on 26 October 2026. It included changes affecting biodiversity and green and blue infrastructure. Identify which policy carries adopted weight when preparing the planning statement. Barnsley supplementary guidance · Sheffield examination update.

Hull and East Riding · different plans on the same estuary

Hull’s Local Plan addresses green infrastructure under Policy 43, biodiversity and wildlife under Policy 44, and trees under Policy 45. Across the city boundary, East Riding’s April 2025 Local Plan Update uses ENV4 for biodiversity and geodiversity.

At Hull’s edge, trace ditches, tree belts and bird-use areas beyond the application site. Check the correct authority’s validation list. For housing and visitor accommodation near the Humber, also check the strategic access mitigation scheme. Hull adopted policies · East Riding ENV4 · Humber access mitigation.

North and North East Lincolnshire · south-bank authorities

Scunthorpe and Barton-upon-Humber fall within North Lincolnshire, where CS17 addresses biodiversity. Grimsby, Cleethorpes and Immingham fall within North East Lincolnshire. Its adopted 2018 plan addresses biodiversity and geodiversity in Policy 41 and green infrastructure in Policy 42.

For port-related land, check the proposed access, lighting and drainage against protected bird habitat. North East Lincolnshire announced pre-submission consultation on its replacement plan in September 2026. Use the adopted and emerging documents as separate evidence. North Lincolnshire biodiversity report · North East Lincolnshire adopted plan · Plan review.

Recent changes

Which plan should go in the planning statement?

A new council, a replacement Local Plan and a published recovery strategy can each take effect on a different date. Record the version and status you used.

Former North Yorkshire districts

North Yorkshire Council replaced the county and seven districts in April 2023. Former district plans still matter while the new plan is prepared. For Harrogate, Scarborough or Selby, check the legacy plan covering the parcel and mark any site allocation.

The scoping consultation for the new plan to 2045 runs from 26 October to 7 December 2026. Meanwhile, York and the national park authorities use their own plans. Check the scoping area and timetable.

Leeds replacement plan

Leeds ended work on its previous Local Plan Update, Your City, Your Neighbourhood, Your Planet. A proposed version of G9 from that process can still appear in search results. The council’s development scheme identifies the adopted policies and work on its replacement plan.

Cite the operative policy in the planning statement. If an emerging proposal is material, identify its document and stage separately. Leeds Local Development Scheme.

Humber governance

North Lincolnshire reported on 30 October 2026 that government had withdrawn the July reorganisation decision for review. Route current applications using the existing authorities. For example, North East Lincolnshire Council still decides an ordinary Grimsby application within the shared strategy area.

For a scheme crossing a council boundary, agree who will check the metric, which local policies apply and who will oversee any planning obligation. Read the reorganisation update · Find the local council.

Local Nature Recovery Strategies

How to use the five recovery maps

Four strategies intersecting the region had published final documents by 5 November 2026. South Yorkshire had reached the publication-draft decision. The directory links to each responsible authority and map.

Match the intervention to the measure

North Yorkshire and York’s guidance explains when a mapped measure can support a 15% strategic-significance uplift in post-development calculations. The parcel must meet the mapped-location test and the proposed intervention must fit an appropriate measure. A coloured hexagon alone establishes neither the habitat nor its deliverability.

Save the relevant map extract and measure. For example, woodland planting in the wrong place could conflict with a grassland priority. Explain how the proposed habitat, extent and management meet the measure before scoring it. Read the two tests and worked examples.

Follow the network across a boundary

West Yorkshire published its strategy in March 2026. Hull and East Yorkshire and North Yorkshire and York published theirs in February. Greater Lincolnshire followed in July. For a cross-boundary scheme, trace the watercourse or habitat corridor when reviewing alternatives for a site near the Ouse or Humber.

Keep the map dates with the metric. The strategic-significance and off-site spatial-risk factors answer different questions. Check each separately, even where the same river links two councils. Defra’s responsible authorities and strategy links · Statutory metric guidance.

South Yorkshire’s publication draft

On 27 October 2026 the mayoral combined authority board approved the publication draft in principle. Its decision required final supporting-authority review and delegated finalisation and publication to the chief executive. The decision records an important stage without establishing a final publication date.

For a Sheffield or Doncaster submission, check for a subsequent final strategy and agree the applicable strategic-significance evidence with the planning ecologist. Keep a dated copy of the material used. Read the board’s decision.

Worked planning example

How Leeds secured grassland units at Filey

Leeds City Council approved a motor control centre kiosk at Knostrop Treatment Works, Knowsthorpe Lane, on 30 May 2025. Permission 25/00843/FU and gain-condition decision 25/05559/COND show how a small shortfall passed from the metric to the register.

Knostrop’s approved calculation, in area biodiversity units
Metric entryArea units
Development site before works0.1020
Development site after works0.0396
Starting value of the Filey parcel0.0468
Filey parcel after intervention, before spatial adjustment0.15665
Off-site uplift after the 0.75 spatial factor(0.15665 − 0.0468) × 0.75 ≈ 0.08239
Total counted after works0.0396 + 0.08239 ≈ 0.12199

Read the actual decision

Leeds approved the gain condition on 26 September 2025. For this decision, the planning file includes a gain plan, final metric, ecology response and decision notice. Together they identify the permission, calculation and off-site delivery relied upon by the council.

Parent permission · Gain-condition decision · Approved documents and metric.

Apply the spatial factor

The metric records 0.0234 hectares of other neutral grassland at Filey, targeting moderate condition. The parcel sits outside the impact authority or National Character Area, but within a neighbouring one under the workbook’s selected category. After deducting the baseline, applying 0.75 gives about 0.08239 units.

As a result, the combined value is about 19.6% above the development baseline. The Filey register lists the rounded allocation as 0.08 under the original Leeds permission. Open Filey’s allocation record.

Reconcile a new offer

First ask the supplier for the gain-site reference, habitat parcel, starting condition, target and area. Then check the spatial category and trading rules in the development workbook. A quoted post-intervention value can exceed the net units the development can count.

At Knostrop, the off-site post-intervention figure of about 0.16 had to be adjusted for the bank’s starting value and location. Prepare a Biodiversity Gain Plan.

Off-site delivery

Where are registered habitat banks?

Natural England’s register identifies the site, habitats and allocations to particular permissions. These examples show where delivery has taken place. Approach the provider for a current parcel-specific offer before relying on remaining units.

Filey and Ripon · North Yorkshire

Filey Habitat Bank covers 14.01 hectares in the Vale of Pickering. Alongside the Leeds kiosk, its register records 1.19 area units for Bentley wastewater treatment works in Doncaster, 24/02347/FULM. Ripon Habitat Bank covers 17.47 hectares in the Pennine Dales Fringe.

The Ripon register records 0.11 area units for the Fulford Road Aldi extension in York, 24/02342/FUL. Its allocation identifies lowland meadow and other neutral grassland. Check each parcel’s target condition as well as the unit total. Filey register · Ripon register · Ripon site information.

Red House Farm · Doncaster

This council-owned, 21.37-hectare bank adjoins Sandall Beat Wood. Its register includes 6.43 area units allocated to a scheme at Crabgate Lane and Green Lane, Skellow, reference 22/01545/FULM.

Use the council bank page for the project and the register for allocations. Check the development reference before comparing a quoted parcel with one already committed. Doncaster habitat bank · Red House Farm register.

Southburn · East Riding

The Southburn register covers 41.79 hectares. It records 0.46 area units for East Riding Community Hospital, 24/02924/PLF, using 0.0575 hectares of lowland meadow targeting good condition. East Riding’s own bank directory also lists Broomfleet.

For example, if a site near Beverley needs watercourse or hedgerow units, a meadow allocation cannot fill that deficit. Check the correct unit type, habitat trading rules and spatial relationship. Southburn allocations · East Riding’s local gain sites.

Published charges

What should a regional BNG budget include?

Separate the habitat purchase, council monitoring, legal work, surveys and long-term management. Each has a different basis. The following published figures show why a single regional price per unit would be misleading.

Doncaster · published unit price

On 5 November 2025 the cabinet set a selling price of £21,000 plus VAT per biodiversity unit at Red House Farm. The decision provided for annual review. It records the price decision for this council project.

Request a current quote showing the habitat, quantity, VAT, allocation terms and quote expiry. Check how many units the development can count after any spatial adjustment. Cabinet decision and pricing terms · Council habitat bank information.

Wakefield · council delivery and monitoring

Wakefield publishes an index-linked £25,000 per unit for council-land delivery. Its breakdown is £20,000 for habitat creation and management, £2,500 for assessment and the management plan, and £2,500 for long-term monitoring.

Its separate monitoring schedule starts at £4,966.49 for 0–1 hectare and £13,373.28 for over 1–5 hectares. Rates rise with the total post-intervention area monitored. A watercourse requiring a River Condition Assessment receives a bespoke calculation. Before adding charges, confirm which route applies. Wakefield’s fee tables and calculation basis.

East Riding · size and complexity

East Riding publishes monitoring charges by area and complexity. In the small, 0–5-hectare band the figures are £2,855 for low complexity, £3,425 for moderate and £4,050 for high, plus VAT. As a result, a more complex habitat can change the budget within the same area band.

Agree the monitoring scope with the council. Also allow for preparing the agreement, any legal review and delivery of the management programme. National statutory credits have a separate government price schedule and eligibility test. East Riding monitoring bands · Government statutory credit prices · BNG cost guide.

Surveys and design

Which habitats need closer investigation?

Use the recovery maps to frame survey questions. Field evidence establishes what is actually present, how it functions and whether the proposed condition is achievable.

Humber ports and coastal housing

At Hull, Immingham or along Holderness, look beyond the application boundary for high-tide roosts and feeding areas used by estuary birds. Drainage, lighting and disturbance can matter on land separated from the foreshore by a road or flood bank.

Check designated-site and Habitats Regulations requirements separately. For housing and visitor accommodation, East Riding’s access mitigation guidance identifies where recreation effects need assessment. Check the Humber scheme.

Pennine headwaters and lowland peat

Upland blanket bog and the lowland raised bogs around Thorne and Hatfield need different hydrological evidence. A new drain can affect wet habitat outside a red line. Likewise, planting trees can be inappropriate on open peat or species-rich grassland.

Survey water levels, slope and existing drains before selecting a target. On the limestone of the Dales or the chalk of the Wolds, record grassland composition and condition at the right season. Humberhead Levels evidence · Yorkshire peat research.

Urban valleys, chalk streams and trees

A redevelopment site along the Aire, Calder or Don can contain riparian habitat, naturally regenerated scrub and mature trees. In the Wolds, a chalk stream or spring may depend on groundwater well beyond the site. Show culverts, bank access and construction compounds on survey drawings.

Keep area habitat, hedgerow and watercourse accounts separate. Explain how lighting and access affect the proposed condition, and check whether irreplaceable habitat needs bespoke compensation. River Condition Assessment · Irreplaceable habitat guidance.

Evidence from delivery

What regional restoration projects can teach a design team

A restoration scheme can reveal the space, water and management a habitat needs. Its habitat gains have their own funding and legal purpose. Check those arrangements before treating any habitat as available to a development.

Outstrays · managed realignment

At Outstrays near Skeffling, the Environment Agency reports the creation of 250 hectares of intertidal habitat through embankment realignment. The scheme provided compensatory habitat for flood-risk and port-related works on the Humber.

For another coastal scheme, test space for tidal exchange, the elevation of the land and movement of sediment. The project’s published area describes habitat delivery, rather than units offered for sale. Environment Agency project account.

Humberhead Levels · shared water levels

Yorkshire Wildlife Trust’s work in the Humberhead Levels connects lowland wetlands across administrative boundaries. Sites around Thorne and Hatfield can share a drainage system even when they have separate landowners.

Establish who controls ditches, pumps and outfalls before committing to a wetland target. Include water levels and vegetation in the monitoring plan so a failure of either can trigger action. Humberhead Levels programme.

Yorkshire Peat Partnership · monitoring

The partnership describes research with universities and water-sector collaborators on peat restoration, including how to establish Sphagnum. Monitoring can help distinguish a successful intervention from a change driven by weather or an upstream drain.

For a restoration proposal, choose baseline evidence and repeatable monitoring points that test the target condition. Set out who can change the management if indicators move in the wrong direction. Explore the partnership’s research.

Planning evidence and services

What to submit with a Yorkshire planning application

Give the authority a baseline plan, condition evidence and a metric that match the drawings. Label each parcel consistently. Identify any earlier habitat loss and explain which baseline date applies.

Before instructing a consultant

Send the red line, latest layout, application reference, key dates and any council correspondence. Identify the land you can control for long-term management. That lets the ecologist price the right surveys and flag evidence that must be gathered in season.

BNG consultants · Planning and delivery steps · Discuss your site.

Regional questions

Yorkshire and Humber BNG questions

For a question about a particular site, send the location and planning reference.

Does a shared recovery map mean one council decides the application?

Each planning authority uses the development plan for its area. For example, Hull and East Riding share a recovery strategy but decide applications separately. Within a national park, check the park planning authority and its policies.

Can a Leeds development buy Filey biodiversity units?

Knostrop’s approved gain plan gives a documented example. Its final metric applied a 0.75 spatial factor and the register recorded 0.08 area units. A new application needs its own habitat match, quantity, spatial calculation and allocation.

Does mapped land in North Yorkshire automatically earn 15% more units?

The council’s guidance requires the parcel to meet the mapped-location test and the proposed habitat intervention to match a measure. Test the proposed intervention and retain the map extract before applying the strategic-significance multiplier.

Where do I check BNG for Grimsby or Scunthorpe?

Use North East Lincolnshire Council for an ordinary Grimsby application, or North Lincolnshire Council for Scunthorpe. Both sit in Yorkshire and the Humber and use the Greater Lincolnshire Local Nature Recovery Strategy.

Does a Humber access mitigation payment cover the BNG requirement?

The access scheme addresses recreation impacts on protected estuary sites. BNG measures habitat change through the statutory metric. A project that triggers both must document the evidence and delivery route for each obligation.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.

Field guide / source notes

Regional evidence

Reviewed by ACP Consultants

National requirements, register and geography

Local plans and recent changes

Recovery strategies and boundaries

Permissions and habitat banks

Costs, estuary and habitat research