Shrewsbury BNG advice
Biodiversity Net Gain in Shrewsbury
Plan your Shrewsbury development around local habitats, planning requirements and practical biodiversity gains.
ACP Consultants can help with habitat surveys, biodiversity metric calculations and a practical BNG delivery plan for your Shrewsbury site.
Local planning
Who decides planning applications in Shrewsbury?
Shrewsbury is within Shropshire Council, the unitary LPA. Shrewsbury Town Council manages parks, open space and local initiatives but does not determine ordinary planning applications. Telford & Wrekin Council is a separate unitary LPA even though both areas share the same Local Nature Recovery Strategy.
Check the actual site boundary
Check the actual red-line site against Shropshire Council's adopted policies map, settlement and neighbourhood policies. Land nearer Telford or the Welsh border may have other planning regimes; an informal Shropshire geographic grouping does not make Shrewsbury Town Council a planning authority.
Local planning
Adopted and emerging planning policy
Use the adopted development plan and the actual site boundary to establish the local policy context.
The operative Shropshire development plan includes the Core Strategy adopted February 2011 and Site Allocations and Management of Development (SAMDev) Plan adopted December 2015, together with relevant made neighbourhood plans.
| Policy | Status and purpose | What to consider |
|---|---|---|
| CS2 — Shrewsbury Development Strategy | Status and purposeAdopted 2011 Core Strategy, local town role | What to considerCheck the Shrewsbury development strategy and actual settlement allocations. |
| CS17 — Environmental Networks | Status and purposeAdopted 2011 ecology network policy | What to considerRetain, protect and enhance ecological connections and important habitat in and beyond the town. |
| MD12 — Natural Environment | Status and purposeAdopted 2015 SAMDev habitat protection | What to considerIdentify designated sites, important trees, hedgerows and ecological surveys; appropriate mitigation and enhancement. |
| S16.1 — Shrewsbury | Status and purposeAdopted 2015 local allocation policy | What to considerApply correct Shrewsbury site allocations, landscaping and any floodplain or green infrastructure constraints. |
The adopted CS17 and MD12 protect linked ecological assets independently of the national statutory 10% metric. The planning site may need floodplain, watercourse or designated-habitat assessments before a developer can claim a compliant gain. Historic 2016–2038 Regulation 19 site allocations are not operative because that replacement was withdrawn.
The replacement plan
The previously submitted Shropshire Local Plan 2016–2038 was withdrawn in July 2025. Its draft Shrewsbury strategic allocations and percentage targets should not be treated as adopted or currently approved development permissions.
How to apply emerging proposals
Shropshire Council started preparing a different new Local Plan with notice 8 May 2026 and passed Gateway 1 on 30 September 2026. Its Strategic Environmental Assessment scoping process continued in autumn 2026. These stages are preparation, not a new adopted replacement for CS17/MD12.
Nature recovery
Which Local Nature Recovery Strategy applies?
The joint Shropshire and Telford & Wrekin Local Nature Recovery Strategy was published 22 April 2026, with Shropshire Council the responsible authority and Telford & Wrekin a separate partner planning area. The strategy includes published nature recovery priorities, 16 broad priorities and 51 potential actions, plus the current Local Habitat Map.
For Shrewsbury, mapped measures may relate to the River Severn/tributaries, hedgerows, wet meadow, woodlands and urban green corridors. A mapped action must match the actual proposed intervention and statutory metric rules. The shared LNRS does not make Telford's local planning validation applicable in Shrewsbury.
Local ecology
Local habitats and site considerations
Scope surveys around habitats within and connected to the site, and retain important ecological links.
River Severn loop and town floodplains
The River Severn encircles the historic town, with floodplain, riparian trees, meadows and water-quality constraints. Site design near the river may need flood-risk, species and river condition assessment as well as separate biodiversity metric modules. A hardstanding riverside redevelopment should not be assumed to be habitat-free without survey.
Rea Brook Valley Local Nature Reserve
Shrewsbury Town Council manages the 36-hectare Rea Brook Valley Local Nature Reserve, a green corridor around five kilometres long. It includes managed wildflower meadows, hedgerows, wet ditch systems, scrub and woodland, and supports kingfisher, amphibians and other wildlife. Those findings describe the reserve, not a neighbouring development parcel's surveyed baseline.
Urban trees, meadow networks and former town plots
Parks, railway edges, old buildings and urban trees can support bats and birds. Distinct site types include sealed town-centre land, ecologically connected riverbanks and open-countryside allocations. UKHab condition and habitat trading must be matched to the actual plot rather than inferred from the Big Town Plan vision.
Separate protected-site and species requirements
Water and wetland ecology is especially important for Shrewsbury development around the River Severn and Rea Brook. Watercourse effects, floodplain management and species law can require evidence separate from statutory 10% BNG. The Rea Brook operational catchment extends into the wider Shropshire countryside.
River Clun SAC nutrient neutrality is a material Shropshire county issue but must not be applied automatically to Shrewsbury; it is a separate mapped catchment and relevant development types.
Local context
What local development and regeneration examples show
Shropshire Council's Smithfield Riverside development programme is part of the Shrewsbury Big Town Plan. Official documents record the former Riverside shopping-centre demolition, Roushill Park public realm, Pride Hill/gap-site plans and broader regeneration of approximately 1.2 hectares of brownfield riverside land.
Council procurement documents from 2026 describe Roushill Park works and an outline planning application submitted in November 2024 for the former Riverside shopping-centre site. Riverside flood adaptation, urban planting and maintenance need site-specific evidence.
Local project guidance
What should applicants learn from Smithfield Riverside?
Smithfield Riverside's official regeneration programme aims to reconnect Shrewsbury town centre with the River Severn, delivering public realm and mixed-use redevelopment. Its brownfield location and flood-adaptation aims make hydrology, trees and any existing vegetation relevant to the statutory metric.
Published outline proposals or a parks concept do not themselves prove a final approved Biodiversity Gain Plan. For an individual planning parcel, confirm the relevant approval date, site boundary, previous vegetation disturbance/degradation, metric baseline and responsibility for future management.
Where green roofs, rain gardens, landscaped civic space or riverbank works are proposed, select appropriate metric habitat classifications and distinguish river/flood-control and other planning obligations from eligible statutory gains.
Planning evidence
Ecological evidence for a planning application
Build the application around a consistent habitat baseline, layout and survey scope.
Local evidence and survey scope
Shropshire Council's current planning application validation requirements and adopted plan should be applied to Shrewsbury proposals. Statutory BNG application data includes an applicability statement, pre-development value, versioned metric and existing habitats plan for qualifying schemes. Check local lists for actual ecology and floodplain requirements.
In Shrewsbury, a PEA/EcIA, tree or bat surveys, river condition report and flood-risk evidence can be justified by actual land and works. Other specialist requirements may arise for scheduled heritage or the registered Battle of Shrewsbury but those are distinct from the statutory biodiversity metric.
National application information
- Whether statutory BNG applies, with reasons for any exemption.
- The pre-development biodiversity value and completed statutory metric, with its version.
- Any relevant earlier baseline or explanation of habitat degradation.
- Details of irreplaceable habitat, where present.
- A scaled plan showing onsite habitats and the north direction.
See our habitat survey guide and BNG assessment service.
National requirements
Does statutory 10% BNG apply to this development?
Qualifying development in England normally needs at least 10% statutory Biodiversity Net Gain. For new applications from 6 August 2026, a whole red-line site of 0.2 hectares or less can be exempt if onsite priority habitat is not adversely affected. Wholly temporary development permitted for five years or less can also qualify, subject to the habitat condition. The dedicated self-build/custom-build exemption no longer applies to new applications from that date.
Application date, earlier permissions, section 73 history, development type and other exemptions affect the result. Assess the whole development site. Under the September 2026 NPPF, higher compulsory local BNG rates must relate to specific, justified and deliverable allocations; a general ambition for 20% does not establish a blanket requirement.
The biodiversity metric
How to calculate biodiversity units correctly
Choose the right metric
The current government statutory biodiversity metric workbook is version 1.1.1, updated 10 November 2026. GOV.UK permits published statutory metric versions where appropriate. Record the version used with the baseline and calculation. The earlier non-statutory Metric 4.0 is not the statutory submission tool. The Small Sites Metric is available only for eligible schemes.
Support strategic significance
The joint Shropshire/Telford LNRS is published, so an appropriately matched mapped Shrewsbury wetland, hedgerow or river intervention may inform strategic significance. The map cannot assign an automatic uplift simply because the site is within the Severn loop or near Rea Brook.
Project delivery
Habitat delivery, costs and programme
Plan habitat delivery
An urban plot near Smithfield Riverside may have limited room for onsite habitat, while rural sites can sometimes retain more green network. Developers should test feasibility, water/flood effects and land maintenance before choosing a registered offsite unit shortfall.
Shropshire's private habitat-bank listings or conservation partnerships do not automatically provide registered, unallocated statutory units for a Shrewsbury application. Verify the government gain-site register, type, spatial-risk score and legal securing documentation for any procurement.
Secure long-term management
For major development, the gain hierarchy normally prioritises suitable onsite creation or enhancement. For eligible non-major new applications from 6 August 2026, onsite and registered offsite gains can sit at the same hierarchy level. Statutory credits remain the last option. Significant onsite gains and registered offsite gains need legally secured management for at least 30 years.
Plan the habitat management and monitoring and Biodiversity Gain Plan together. Check registered offsite unit requirements where a shortfall remains.
What affects the budget
Near the River Severn, BNG costing can involve river surveys, floodplain modelling, trees, species and historic building demolition. Those are separate from legal long-term habitat-management and any registered offsite units.
Request separate quotations for surveys, habitat delivery, legal agreements and monitoring.
Plan the work in stages
Agree the site boundary and survey scope first. Use the baseline to test the layout, retention and realistic habitat gains. Then identify delivery land, management responsibilities and documents needed for the application and final gain plan.
Your site checklist
Seven checks before submitting a Shrewsbury BNG assessment
Record the evidence for the full site before commissioning surveys or submitting the application.
| Check | What to collect | Decision supported |
|---|---|---|
| 1. Confirm the decision-maker | Check the actual red-line site against Shropshire Council's adopted policies map, settlement and neighbourhood policies. Land nearer Telford or the Welsh border may have other planning regimes; an informal Shropshire geographic grouping does not make Shrewsbury Town Council a planning authority. | Use the actual adopted planning policies and correct local validation list. |
| 2. Test national BNG eligibility | Full red-line area, application date, priority habitat impact, development type and any section 73 history | Check 6 August 2026 exemptions before assuming a metric is mandatory. |
| 3. Map existing habitat | UKHab parcels, condition, hedgerows, trees, watercourses and protected-species features | Select the correct baseline and appropriate statutory metric modules. |
| 4. Check nature recovery | Shropshire and Telford & Wrekin LNRS formally published 22 April 2026 — use its current official Local Habitat Map and site-specific proposed measures | Test strategic significance using actual published status and mapped habitat intervention. |
| 5. Identify special ecological duties | River Severn and Rea Brook floodplain habitat, potential otters/bats/breeding birds, designated meadow/woodland, future council River Clun SAC only if site pathway applies. | Check separate HRA, licensing, nutrient or habitat protection before counting units. |
| 6. Plan a realistic gain | Onsite space, habitat trading and actual registered/allocated offsite units | Avoid relying on a marketing listing or assumed spatial-risk score. |
| 7. Secure management | Land manager, funding, legal agreement where required, HMMP and monitoring schedule | Prepare the relevant final gain plan and long-term management commitments. |
Project support
How ACP can help with your Shrewsbury project
ACP can help you plan the surveys, calculations and documents your site needs. We agree the scope around your proposal, its planning stage and the habitats affected.
Survey, design and planning support
- Habitat surveys and condition assessments.
- Statutory metric calculations and design options.
- BNG reports and planning submission support.
- Gain plans and habitat management documents.
Local planning guidance
Shrewsbury Biodiversity Net Gain FAQs
Answers to common planning, survey and habitat-delivery questions for projects in Shrewsbury.
Who is the local planning authority for Shrewsbury?
Shropshire Council is the unitary local planning authority. Shrewsbury Town Council manages local nature reserves and parks but does not determine ordinary development applications. Telford & Wrekin has its own unitary planning authority.
Which Local Plan policies apply in Shrewsbury?
The adopted 2011 Shropshire Core Strategy includes CS17 Environmental Networks and CS2 Shrewsbury Development Strategy. The 2015 SAMDev includes MD12 Natural Environment and Shrewsbury allocation policy S16.1.
Is Shropshire's former 2016–2038 replacement plan adopted?
No. It was withdrawn in July 2025. A different new Shropshire Local Plan started formal preparation with Gateway 1 on 30 September 2026. Neither replaces the adopted 2011/2015 policies yet.
Which LNRS covers Shrewsbury?
The Shropshire and Telford & Wrekin LNRS was published on 22 April 2026. Shropshire Council is responsible, and Telford is a separate planning area sharing the nature-recovery strategy.
Does Rea Brook Valley count as a BNG habitat bank?
Shrewsbury Town Council manages it as a local nature reserve with meadows, hedgerows, scrub and wetland habitat; it is not an automatic unit seller.
Is Smithfield Riverside already delivering a confirmed BNG gain?
Smithfield Riverside is a phased regeneration programme. Establish the habitat baseline and gain requirements for the actual permission. The specific site/phase requires consent and habitat evidence.
Can a Shrewsbury brownfield site be ecologically valuable?
Yes. A plot may support trees, scrub, riverbank features or priority open mosaic habitat, while other areas are sealed. UKHab survey and condition evidence are needed before assuming a zero-value baseline.
Are sites of 0.2ha or less exempt after August 2026?
A qualifying new application on a whole site no larger than 0.2 hectares may be exempt if no onsite priority habitat is adversely affected. Older applications, section 73 cases and other exemption conditions need checking.
Does River Clun nutrient neutrality apply to all Shrewsbury proposals?
No. The River Clun SAC has its own catchment and legal screening. A Shrewsbury development is not automatically in that area simply because both are within Shropshire; the actual hydrological pathway must be checked.
Could river condition work be needed near the Severn?
Potentially. Development directly affecting river habitat may need an appropriate river condition assessment and the watercourse metric module, alongside flood-risk and species protection evidence.
When is the final Biodiversity Gain Plan approved?
Normally after planning permission and before commencement where the statutory condition applies. The initial application should include relevant BNG data and any council-required proportionate ecology/flood information.
What should I send ACP for Shrewsbury BNG advice?
Send the red-line plan, site address, drawings, development type and application date, ecology reports and known River Severn, Rea Brook, tree or heritage constraints.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Shrewsbury BNG
Sources and references
Reviewed 10 November 2026.
Official planning and nature recovery sources
- Adopted Local Plan
- Archive including the withdrawn Local Plan
- Next Local Plan
- Nature recovery plan launched
- Rea Brook Valley Local Nature Reserve
- Levelling up Shrewsbury
- Smithfield Riverside programme assurance documents
- Nature-based solutions help slow Rea Brook
- Planning applications
- National BNG guidance
- BNG exemptions
- Statutory metric tools and guides
- NPPF biodiversity policies