Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Telford BNG advice

Biodiversity Net Gain in Telford

Plan your Telford development around local habitats, planning requirements and practical biodiversity gains.

ACP Consultants can help with habitat surveys, biodiversity metric calculations and a practical BNG delivery plan for your Telford site.

Local planning

Who decides planning applications in Telford?

Telford & Wrekin Council determines ordinary applications in Telford, Wellington, Newport (Shropshire), Dawley, Madeley and Ironbridge as appropriate. It is not a district administered by Shropshire Council. The councils share a published LNRS but have their own adopted planning and application validation documents.

Check the actual site boundary

Confirm the red-line planning area; Newport in Telford & Wrekin should never be confused with Newport on the Isle of Wight. For development near Shrewsbury or rural Shropshire, use the actual council and consent route, not a shared LNRS boundary as proxy.

Local planning

Adopted and emerging planning policy

Use the adopted development plan and the actual site boundary to establish the local policy context.

The Telford & Wrekin Local Plan 2011–2031 was adopted on 11 January 2018. It remains the operative Local Plan on 10 November 2026. Its adopted ecology policies protect biodiversity, geology, trees, hedgerows and green infrastructure.

Telford adopted planning policies
PolicyStatus and purposeWhat to consider
Local Plan 2011–2031Adopted 11 January 2018Current development plan for Borough applications until the examined replacement receives formal adoption.
NE1 — Biodiversity and GeodiversityAdopted important ecological protection and enhancementAvoid impacts on designated sites, priority habitats and species, provide ecological permeability and connected landscape features.
NE2 — Trees, Hedgerows and WoodlandsAdopted vegetation retention/protectionSurvey mature trees, woodland, hedge networks and relevant roots/roosting before redesign or removal.
NE6 — Green NetworkAdopted urban green network policyMaintain continuity of habitat corridors, open spaces and local nature reserves through development proposals.

Natural England's original examination evidence for NE1 and NE2 stresses avoiding direct or indirect damage to protected habitats and wildlife corridors and protecting ancient woodland. These protections remain material alongside the newer statutory 10% BNG requirement and the council's current metric guidance.

The replacement plan

The replacement Telford & Wrekin Local Plan to 2041 was found sound, subject to modifications, in October 2026. Cabinet is scheduled to consider it on 12 November, with Full Council adoption proposed for 26 November 2026. The existing plan remains operative until adoption.

How to apply emerging proposals

The proposed plan includes NE4 Development Greening Factor and stronger nature-recovery provisions. It encourages developers to aim for 20% BNG voluntarily, while retaining the national minimum statutory 10%. It is not a blanket legally adopted 20% requirement; future projects must check the exact adoption and September 2026 NPPF policy.

Nature recovery

Which Local Nature Recovery Strategy applies?

The Shropshire and Telford & Wrekin LNRS was published on 22 April 2026, with Shropshire Council responsible and Telford & Wrekin as a partner local authority. It provides a final Statement of Biodiversity Priorities and a Local Habitat Map for both unitary areas.

Telford's opportunities include woodland, wetland flushes, lowland grassland, urban green networks, restored pit mounds and pollinator-friendly public green spaces. Use the exact published mapped habitat measure and actual intervention when calculating strategic significance; the broad map itself does not create a universal 15% boost.

View the official nature recovery strategy and habitat map

Local ecology

Local habitats and site considerations

Scope surveys around habitats within and connected to the site, and retain important ecological links.

The Wrekin, Ercall and ancient woodland

The Ercall and Lawrence's Hill Local Nature Reserve covers around 66.7 hectares of ancient oak woodland and former quarry geology within the wider Wrekin/Ercall SSSI. Ancient woodland, orchid and limestone flora, important geological exposures and species need site-specific protection. A BNG metric cannot replace geological conservation or protected-site avoidance.

New Town green network and local nature reserves

Telford & Wrekin has a broad network of woodland, historic pit-mound habitats, Town Park and open spaces. The council lists 22 Local Nature Reserves, with further sites proposed. A plot near Dothill, Apley Woods or Priorslee Flash must be surveyed to establish what habitats actually occur within the development parcel.

Drainage, brooks and former industrial land

Urban regeneration and greenfield fringes contain ditches, attenuation ponds, old railway embankments and potentially scrub/open mosaic vegetation on former industrial land. A good landscape design should consider flood risk, vegetation retention and suitable surface-water habitat types rather than assume hardstanding means no ecological constraint.

Separate protected-site and species requirements

The Wrekin/Ercall SSSI and other designated nature sites require suitable avoidance and impact assessment. The council records nine SSSIs and over 70 Local Sites in the borough, covering grasslands, woodlands, wetlands and watercourses. These designations protect land independently of the statutory 10% biodiversity-unit calculation.

Great crested newts, birds, bats and tree/hedgerow features may require surveys. Apply current national exemptions and provide the council-specific ecological documents justified by the development.

Local context

What local development and regeneration examples show

Telford Station Quarter is a real council-led redevelopment between Telford Central railway station and the town centre. Its Phase One planning record TWC/2022/0914 includes residential, a digital skills/enterprise hub and public realm. Council reporting describes 189 dwellings among completed and planned phase-one plots.

The council announced in May 2026 that 84 Denmark House private-rent apartments were completed, with other homes nearing completion, and in August 2026 that the Telford sixth form campus was complete. For a later phase, establish the relevant permission, habitat baseline and management obligations.

Local project guidance

What does Station Quarter teach applicants about BNG?

Station Quarter is a multi-phase redevelopment of previously cleared offices between a transport hub and the town centre. The council publishes the relevant planning reference TWC/2022/0914, which spans phase-one detailed elements and outlines future phases.

For a current application, the developer should check the date and type of each relevant consent, any prior habitats/land clearance, what ecological obligations already apply and who maintains green infrastructure. A phased approval does not allow the same habitat gain to be allocated twice.

Public squares, planting and sustainable drainage may support wider green infrastructure. However, only correctly classified, measurable and deliverable habitats can be included in the statutory metric, with separate HRA, species and flood responsibilities where relevant.

Planning evidence

Ecological evidence for a planning application

Build the application around a consistent habitat baseline, layout and survey scope.

Local evidence and survey scope

Telford & Wrekin Council's BNG guidance explains the national baseline, completed statutory biodiversity metric and condition-stage Gain Plan. Its Local Validation List (2024) calls for a BNG Statement and metric where applicable, with applicability determined under current national exemptions.

The council's Ecology and Planning service describes locally important SSSIs and Local Sites and advises early specialist surveys for protected species and habitat impacts. For development near Ercall or another reserve, submit case-appropriate PEA/EcIA and protected-site evidence as well as national BNG data. The final gain plan normally follows permission.

National application information

  • Whether statutory BNG applies, with reasons for any exemption.
  • The pre-development biodiversity value and completed statutory metric, with its version.
  • Any relevant earlier baseline or explanation of habitat degradation.
  • Details of irreplaceable habitat, where present.
  • A scaled plan showing onsite habitats and the north direction.

See our habitat survey guide and BNG assessment service.

National requirements

Does statutory 10% BNG apply to this development?

Qualifying development in England normally needs at least 10% statutory Biodiversity Net Gain. For new applications from 6 August 2026, a whole red-line site of 0.2 hectares or less can be exempt if onsite priority habitat is not adversely affected. Wholly temporary development permitted for five years or less can also qualify, subject to the habitat condition. The dedicated self-build/custom-build exemption no longer applies to new applications from that date.

Application date, earlier permissions, section 73 history, development type and other exemptions affect the result. Assess the whole development site. Under the September 2026 NPPF, higher compulsory local BNG rates must relate to specific, justified and deliverable allocations; a general ambition for 20% does not establish a blanket requirement.

Check the BNG exemption rules

The biodiversity metric

How to calculate biodiversity units correctly

Choose the right metric

The current government statutory biodiversity metric workbook is version 1.1.1, updated 10 November 2026. GOV.UK permits published statutory metric versions where appropriate. Record the version used with the baseline and calculation. The earlier non-statutory Metric 4.0 is not the statutory submission tool. The Small Sites Metric is available only for eligible schemes.

Support strategic significance

A published joint LNRS exists, so appropriate Telford habitat actions can qualify for higher strategic significance when the exact mapped measure and proposed intervention match the statutory metric rule. Separate NE4 greening factor from a statutory BNG percentage; even if adopted, a greening score is not itself habitat units.

Statutory metric guidance · Small Sites Metric guidance

Project delivery

Habitat delivery, costs and programme

Plan habitat delivery

Telford urban sites can sometimes support meaningful onsite improvements through retained trees, woodland links, rain gardens, wetland or managed grassland. Some constrained Station Quarter plots may need legally registered offsite units if in-scope and a shortfall remains.

A proposed LNRS recovery site or Town Park habitat programme is not automatic stock of registered units. Before procurement, verify actual habitat bank status, unit type, government allocation, spatial-risk score and management obligation.

Secure long-term management

For major development, the gain hierarchy normally prioritises suitable onsite creation or enhancement. For eligible non-major new applications from 6 August 2026, onsite and registered offsite gains can sit at the same hierarchy level. Statutory credits remain the last option. Significant onsite gains and registered offsite gains need legally secured management for at least 30 years.

Plan the habitat management and monitoring and Biodiversity Gain Plan together. Check registered offsite unit requirements where a shortfall remains.

What affects the budget

Environmental work may include tree/ancient woodland surveys, bats and newts, watercourse condition, statutory metric, SuDS habitat design and legal long-term management. Urban regeneration phasing may add consultant coordination and planning condition checks.

Separate normal ecology assessment, HRA/mitigation, legally allocated offsite units, land management and council charges.

Plan the work in stages

Agree the site boundary and survey scope first. Use the baseline to test the layout, retention and realistic habitat gains. Then identify delivery land, management responsibilities and documents needed for the application and final gain plan.

Read the BNG cost guide

Your site checklist

Seven checks before submitting a Telford BNG assessment

Record the evidence for the full site before commissioning surveys or submitting the application.

Record the information for the full red-line site before submitting a planning application.
CheckWhat to collectDecision supported
1. Confirm the decision-makerConfirm the red-line planning area; Newport in Telford & Wrekin should never be confused with Newport on the Isle of Wight. For development near Shrewsbury or rural Shropshire, use the actual council and consent route, not a shared LNRS boundary as proxy.Use the actual adopted planning policies and correct local validation list.
2. Test national BNG eligibilityFull red-line area, application date, priority habitat impact, development type and any section 73 historyCheck 6 August 2026 exemptions before assuming a metric is mandatory.
3. Map existing habitatUKHab parcels, condition, hedgerows, trees, watercourses and protected-species featuresSelect the correct baseline and appropriate statutory metric modules.
4. Check nature recoveryShropshire and Telford & Wrekin LNRS published 22 April 2026, Shropshire Council responsible — use its current official Local Habitat Map and site-specific proposed measuresTest strategic significance using actual published status and mapped habitat intervention.
5. Identify special ecological dutiesErcall and Wrekin SSSI ancient woodland/geology; local nature reserves and historic industrial pit habitats; brooks, bats, newts and trees.Check separate HRA, licensing, nutrient or habitat protection before counting units.
6. Plan a realistic gainOnsite space, habitat trading and actual registered/allocated offsite unitsAvoid relying on a marketing listing or assumed spatial-risk score.
7. Secure managementLand manager, funding, legal agreement where required, HMMP and monitoring schedulePrepare the relevant final gain plan and long-term management commitments.

Discuss your site evidence with ACP →

Project support

How ACP can help with your Telford project

ACP can help you plan the surveys, calculations and documents your site needs. We agree the scope around your proposal, its planning stage and the habitats affected.

Survey, design and planning support

  • Habitat surveys and condition assessments.
  • Statutory metric calculations and design options.
  • BNG reports and planning submission support.
  • Gain plans and habitat management documents.

Discuss your site with ACP →

Local planning guidance

Telford Biodiversity Net Gain FAQs

Answers to common planning, survey and habitat-delivery questions for projects in Telford.

Which council determines Telford BNG applications?

Telford & Wrekin Council is the unitary planning authority for Telford, Wellington and relevant borough towns. Shropshire Council is a separate unitary LPA despite both using a shared Local Nature Recovery Strategy.

Has Telford adopted its replacement Local Plan to 2041?

Not as of 10 November 2026. The inspectors found it sound subject to modifications. Cabinet consideration is scheduled for 12 November and Full Council adoption for 26 November. The adopted 2011–2031 plan remains operative meanwhile.

What does the adopted NE1 policy cover?

NE1 Biodiversity and Geodiversity protects important habitats, sites, species and ecological connectivity. NE2 addresses trees, hedgerows and woodlands, while NE6 covers the Green Network.

Is 20% BNG mandatory in Telford?

The council's 2026 examined replacement plan encourages developers to aspire to 20% but retains statutory 10% as the mandatory minimum for qualifying schemes. That draft is not yet adopted, and higher compulsory local requirements are restricted nationally.

Which LNRS covers Telford and Wrekin?

The Shropshire and Telford & Wrekin Local Nature Recovery Strategy was published on 22 April 2026. Shropshire Council is its responsible authority, but Telford & Wrekin makes its own planning decisions.

Does The Ercall need a special ecology check?

Potentially. The Ercall and Wrekin include ancient woodland, geological SSSI exposures and important flora. Development with an impact pathway may require separate protected-site assessment in addition to any BNG calculation.

Does Station Quarter already deliver 10% BNG?

Station Quarter is a phased redevelopment under planning reference TWC/2022/0914. Each application/phase requires consent-date and ecological evidence checks.

Are small sites below 0.2ha automatically exempt?

Only eligible new applications from 6 August 2026 qualify if the entire red-line site is no greater than 0.2ha and no onsite priority habitat is adversely affected, subject to other law and transitional rules.

What ecology surveys may be needed in Telford?

Depending on site and works, UKHab/condition mapping, tree and hedge surveys, bats, breeding birds, great crested newts, geological site screening and watercourse condition assessments may be needed.

When is the final Biodiversity Gain Plan approved?

For qualifying schemes normally after permission and before commencement. Local validation may require appropriate baseline, completed metric and draft gain proposals earlier.

Can Telford schemes use registered offsite units?

Yes if statutory hierarchy and trading rules permit. An LNRS restoration site or council reserve does not itself prove registered and allocated units, live price or actual availability.

What should I send ACP about Telford BNG?

Send the site red-line map, council planning reference where available, proposed works, drawings, previous ecology reports and submission date. For Station Quarter identify the actual permission phase.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.